<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
  <channel>
    <title>HPC / Supercomputing AI Data Center Feed</title>
    <link>https://aidatacenterindex.com/ai-focus/hpc/feed/</link>
    <description>Chronological feed for HPC / Supercomputing using the best public timeline year available for each tracked facility.</description>
  <item>
    <title>2025: JUPITER Exascale AI Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/jupiter-exascale-ai-data-center-germany.html</link>
    <guid>https://aidatacenterindex.com/datacenters/jupiter-exascale-ai-data-center-germany.html</guid>
    <description>Jülich, North Rhine-Westphalia, Germany | Operational | 10 MW — JUPITER is Europe&apos;s first exascale-class supercomputer, housed in a modular liquid-cooled data center at Forschungszentrum Jülich. Built on Eviden BullSequana XH3000 racks populated with 24,000 NVIDIA GH200 Grace-Hopper Superchips, the syst</description>
  </item>
  <item>
    <title>2023: MareNostrum 5 Supercomputing Center</title>
    <link>https://aidatacenterindex.com/datacenters/marenostrum-5-supercomputing-center-spain.html</link>
    <guid>https://aidatacenterindex.com/datacenters/marenostrum-5-supercomputing-center-spain.html</guid>
    <description>Barcelona, Catalonia, Spain | Operational | 10 MW — MareNostrum 5 is a heterogeneous EuroHPC supercomputer installed at the Barcelona Supercomputing Center. Its Lenovo Neptune liquid-cooled CPU partition spans 6,400 Sapphire Rapids nodes delivering 40 petaflops, complemented by accelerator n</description>
  </item>
  <item>
    <title>2022: LUMI AI Supercomputer Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/lumi-ai-supercomputer-finland.html</link>
    <guid>https://aidatacenterindex.com/datacenters/lumi-ai-supercomputer-finland.html</guid>
    <description>Kajaani, Kainuu, Finland | Operational | 7.1 MW — LUMI resides in a repurposed paper mill in Kajaani, Finland, where abundant hydroelectric power and direct liquid cooling enable one of the world&apos;s fastest and greenest supercomputers. The HPE Cray EX system packs 10,240 AMD Instinct MI250X</description>
  </item>
  <item>
    <title>2022: Leonardo AI Supercomputing Facility</title>
    <link>https://aidatacenterindex.com/datacenters/leonardo-ai-supercomputing-facility-italy.html</link>
    <guid>https://aidatacenterindex.com/datacenters/leonardo-ai-supercomputing-facility-italy.html</guid>
    <description>Bologna, Emilia-Romagna, Italy | Operational | 6 MW — Leonardo is a EuroHPC pre-exascale supercomputer hosted at the Bologna Technopole and operated by CINECA. Built on Eviden BullSequana XH2000 technology, the system combines a 3,456-node GPU booster with 13,824 NVIDIA A100 accelerators and a</description>
  </item>
  <item>
    <title>ODATA — BG03 Bogotá AI Campus</title>
    <link>https://aidatacenterindex.com/datacenters/odata-bg03-bogota-ai-campus-colombia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/odata-bg03-bogota-ai-campus-colombia.html</guid>
    <description>Bogotá, Cundinamarca, Colombia | Under Construction | 120 MW — ODATA&apos;s BG03, located in the Cundinamarca region near Bogotá, is set to be Colombia&apos;s largest data center with 120 MW of capacity. Part of a $1.3 billion regional expansion, the campus is specifically designed for high-density AI and hypers</description>
  </item>
  <item>
    <title>Microsoft — Poland AI Expansion (Warsaw)</title>
    <link>https://aidatacenterindex.com/datacenters/microsoft-poland-ai-expansion-warsaw.html</link>
    <guid>https://aidatacenterindex.com/datacenters/microsoft-poland-ai-expansion-warsaw.html</guid>
    <description>Warsaw, Masovian, Poland | Under Construction | 100 MW — Microsoft is investing $700 million to expand its hyperscale cloud region near Warsaw, with a target completion date of mid-2026. This expansion focuses on increasing high-performance AI compute capacity for enterprise and public sector use</description>
  </item>
  <item>
    <title>Nvidia &amp; Foxconn — Kaohsiung AI Factory</title>
    <link>https://aidatacenterindex.com/datacenters/nvidia-foxconn-kaohsiung-ai-factory-taiwan.html</link>
    <guid>https://aidatacenterindex.com/datacenters/nvidia-foxconn-kaohsiung-ai-factory-taiwan.html</guid>
    <description>Kaohsiung, Kaohsiung, Taiwan | Under Construction | 100 MW — The Nvidia-Foxconn AI Factory in Kaohsiung is Taiwan&apos;s largest advanced AI supercomputing center, scheduled to become operational in the first half of 2026. Representing a $1.4 billion investment, the facility is the first in Asia to deploy</description>
  </item>
  <item>
    <title>Green Mountain AI Data Center (Rjukan)</title>
    <link>https://aidatacenterindex.com/datacenters/green-mountain-rjukan-ai-campus-norway.html</link>
    <guid>https://aidatacenterindex.com/datacenters/green-mountain-rjukan-ai-campus-norway.html</guid>
    <description>Rjukan, Vestfold og Telemark, Norway | Operational | 50 MW — Green Mountain operates a high-security AI and HPC campus inside a former NATO facility in Rjukan, Norway. The modular halls are built in 2 megawatt blocks that scale to roughly 50 megawatts of IT load, all powered by nearby hydroelectric s</description>
  </item>
  </channel>
</rss>
