{"generated_at":"2026-07-12T03:07:33.904Z","license":"CC BY 4.0","taxonomy":{"type":"AI focus","name":"Mixed","slug":"mixed","item_count":144,"total_megawatts":63468},"items":[{"id":"wonder-valley-off-grid-ai-data-center-park","title":"Wonder Valley Off-Grid AI Data Center Park","url":"https://aidatacenterindex.com/datacenters/wonder-valley-off-grid-ai-data-center-park.html","megawatts":7500,"companies":["O'Leary Ventures","Municipal District of Greenview"],"country":"Canada","region":"Western Canada","city":"Grande Prairie","status":"planned full-build campus; Phase 1 power infrastructure proposed","energy_type":"Natural Gas (Off-Grid)","ai_focus":"AI data-centre campus for hyperscale AI and cloud workloads; tenants not disclosed","start_year":2024,"lat":55.1708,"lng":-118.7947,"sources":["https://www.gensler.com/projects/wonder-valley-data-centre-park","https://majorprojects.alberta.ca/details/Wonder-Valley-AI-Data-Centre-Park/11477","https://olearyventures.com/wondervalley/","https://siteselection.com/data-centers-stars-align-in-wonder-valley/","https://www.datacenterdynamics.com/en/news/mr-wonderful-backs-off-grid-power-venture-for-alberta-data-center/"]},{"id":"g42-uae-us-ai-campus-abu-dhabi","title":"G42 “Stargate” UAE–US AI Campus (Abu Dhabi)","url":"https://aidatacenterindex.com/datacenters/g42-uae-us-ai-campus-abu-dhabi.html","megawatts":5000,"companies":["G42","Khazna Data Centers","OpenAI","Oracle","NVIDIA","Cisco","SoftBank Group"],"country":"United Arab Emirates","region":"Abu Dhabi","city":"Abu Dhabi","status":"under construction / first 200 MW Stargate UAE cluster expected in 2026","energy_type":"Abu Dhabi grid and new infrastructure power context; facility-specific procurement mix not disclosed","ai_focus":"Sovereign AI-grade compute, training, inference, and regional AI cloud services","start_year":2026,"lat":24.4539,"lng":54.3773,"sources":["https://www.g42.ai/resources/news/g42-lead-consortium-us-partners-build-5gw-uae-us-ai-campus","https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae","https://openai.com/index/introducing-stargate-uae/","https://www.uae-embassy.org/news/uae-us-presidents-attend-unveiling-phase-1-new-5gw-ai-campus-abu-dhabi","https://www.datacenterdynamics.com/en/news/us-and-uae-plan-to-build-5gw-ai-data-center-campus-run-by-g42-and-american-hyperscalers/"]},{"id":"softbank-france-ai-data-center-capacity-program","title":"SoftBank France AI Data Center Capacity Program","url":"https://aidatacenterindex.com/datacenters/softbank-france-ai-data-center-capacity-program.html","megawatts":5000,"companies":["SoftBank Group","SB Energy","Schneider Electric","EDF"],"country":"France","region":"Hauts-de-France and additional France sites","city":"","status":"planned national AI data center capacity program; first 3.1 GW phase targeted by 2031","energy_type":"French grid and low-carbon power context; EDF/Bouchain and Schneider Electric infrastructure partnership noted","ai_focus":"High-performance AI compute capacity for AI companies, cloud providers, enterprises, public institutions, and research organizations","start_year":2031,"lat":null,"lng":null,"sources":["https://group.softbank/en/news/press/20260531_0","https://www.datacenterdynamics.com/en/news/softbank-plans-up-to-5gw-data-center-buildout-in-france-investment-of-up-to-75bn/","https://techcrunch.com/2026/05/30/softbank-says-it-will-invest-up-to-e75-billion-to-build-french-data-centers/"]},{"id":"scala-ai-city-eldorado-do-sul-brazil","title":"Scala — AI City (Eldorado do Sul)","url":"https://aidatacenterindex.com/datacenters/scala-ai-city-eldorado-do-sul-brazil.html","megawatts":4750,"companies":["Scala Data Centers"],"country":"Brazil","region":"Rio Grande do Sul","city":"Eldorado do Sul","status":"planned campus with 5 GW grid-connection authorization and 54 MW first phase disclosed","energy_type":"100 percent renewable and certified energy strategy with long-term wind and hydro supply arrangements","ai_focus":"Training and Inference","start_year":2024,"lat":-30.003,"lng":-51.301,"sources":["https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html","https://scaladatacenters.com/en/with-an-initial-investment-of-usd-500-million-scala-data-centers-and-rio-grande-do-sul-government-sign-agreement-for-largest-digital-infrastructure-project-in-the-state-of-southern-brazil/","https://www.datacenterdynamics.com/en/news/scala-ai-city-scala-pitches-50bn-brazil-data-center-campus-of-up-to-47gw/"]},{"id":"beacon-ai-alberta-hyperscale-campuses","title":"Beacon AI Alberta Hyperscale Campuses","url":"https://aidatacenterindex.com/datacenters/beacon-ai-alberta-hyperscale-campuses.html","megawatts":4500,"companies":["Beacon AI Centers","Nadia Partners"],"country":"Canada","region":"Alberta","city":"Calgary & Edmonton Areas","status":"planned multi-site Alberta development with sites targeted to energize as early as 2027","energy_type":"Grid and on-site (natural gas) hybrid","ai_focus":"Hyperscale AI and cloud data-center development; tenant workload mix not disclosed","start_year":2027,"lat":50.916,"lng":-113.773,"sources":["https://www.businesswire.com/news/home/20250515695441/en/Beacon-AI-Centers-Appoints-Josh-Schertzer-as-CEO-Commits-to-an-Initial-4.5-GW-Data-Center-Development-in-Alberta-Canada","https://beacondatacenters.com/news/","https://www.latitudemedia.com/news/this-data-center-developer-is-betting-on-alberta-to-solve-the-power-backlog/","https://iaac-aeic.gc.ca/050/evaluations/proj/90121?culture=en-CA","https://majorprojects.alberta.ca/details/Beacon-Foothills-AI-Data-Center-Hub/11490"]},{"id":"meta-vistra-nuclear-uprate-agreement-oh-pa","title":"Meta-Vistra PJM Nuclear Power Agreements","url":"https://aidatacenterindex.com/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html","megawatts":2609,"companies":["Meta","Vistra Corp"],"country":"United States","region":"PJM grid region (Ohio and Pennsylvania)","city":"","status":"20-year Meta-Vistra nuclear PPAs announced January 2026; uprate capacity expected in early 2030s","energy_type":"Multi-plant PJM nuclear power purchase agreements and uprates","ai_focus":"Meta AI and cloud operations supported by nuclear power purchase agreements","start_year":2026,"lat":null,"lng":null,"sources":["https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/","https://investor.vistracorp.com/2026-01-09-Vistra-and-Meta-Announce-Agreements-to-Support-Nuclear-Plants-in-PJM-and-Add-New-Nuclear-Generation-to-the-Grid","https://www.utilitydive.com/news/meta-nuclear-deal-oklo-vistra-terrapower-ai-data-centers/809215/"]},{"id":"aws-project-rainier-ai-campus-indiana","title":"AWS Project Rainier (New Carlisle, Indiana)","url":"https://aidatacenterindex.com/datacenters/aws-project-rainier-ai-campus-indiana.html","megawatts":2200,"companies":["Amazon Web Services","Anthropic"],"country":"United States","region":"New Carlisle, Indiana","city":"New Carlisle","status":"operational first Project Rainier cluster; full campus buildout ongoing","energy_type":"Grid and NIPSCO framework; generation mix not fully source-resolved","ai_focus":"Training and inference for Anthropic Claude on Project Rainier","start_year":2025,"lat":41.7,"lng":-86.51,"sources":["https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster","https://www.linkedin.com/posts/mattgarman_project-rainier-is-now-online-the-worlds-activity-7389330225190326272-M4MD","https://www.linkedin.com/posts/cnbc_amazon-opens-11-billion-ai-data-center-in-activity-7389288412337340417-s_nw","https://www.datacenterdynamics.com/en/news/amazon-announces-15bn-data-center-ai-investment-plan-for-northern-indiana/"]},{"id":"aws-ai-innovation-campuses-pennsylvania","title":"AWS Pennsylvania AI Innovation Campuses and Susquehanna PPA","url":"https://aidatacenterindex.com/datacenters/aws-ai-innovation-campuses-pennsylvania.html","megawatts":1920,"companies":["Amazon Web Services","Talen Energy"],"country":"United States","region":"Pennsylvania","city":"","status":"under construction at Susquehanna-adjacent campus with additional planned Pennsylvania campuses","energy_type":"Susquehanna nuclear PPA delivered through PJM / front-of-meter grid structure","ai_focus":"AWS cloud computing and AI innovation campuses","start_year":2025,"lat":null,"lng":null,"sources":["https://www.aboutamazon.com/news/aws/amazon-pennsylvania-investment-cloud-infrastructure-ai-innovation","https://dced.pa.gov/newsroom/governor-josh-shapiro-announces-amazon-plans-to-invest-20-billion-in-pennsylvania-for-ai-infrastructure-in-largest-capital-investment-in-commonwealth-history/","https://www.sec.gov/Archives/edgar/data/1622536/000162828025030559/a20250611pressreleasebusin.htm","https://www.talenenergy.com/powering-data/","https://www.utilitydive.com/news/talen-amazon-aws-susquehanna-nuclear-data-centert/750440/"]},{"id":"elea-rio-ai-city-brazil","title":"Elea Rio AI City","url":"https://aidatacenterindex.com/datacenters/elea-rio-ai-city-brazil.html","megawatts":1500,"companies":["Elea Data Centers"],"country":"Brazil","region":"Rio de Janeiro","city":"Rio de Janeiro","status":"RJO1 operational; phased Rio AI City first-phase buildout in progress with RJO2 delivery beginning in 2026","energy_type":"Certified renewable energy capacity for phased Rio AI City buildout","ai_focus":"AI and cloud workloads across a phased Rio data-center district","start_year":2025,"lat":-22.906,"lng":-43.172,"sources":["https://eleadatacenters.com/en/rio-ai-city/","https://www.prnewswire.com/news-releases/elea-announces-rio-ai-city-a-landmark-brazilian-data-center-project-with-capacity-up-to-3-2-gw-of-renewable-energy-supporting-ai-growth-302449289.html","https://eleadatacenters.com/en/"]},{"id":"neom-oxagon-net-zero-ai-data-center","title":"NEOM/DataVolt Oxagon AI Factory Campus","url":"https://aidatacenterindex.com/datacenters/neom-oxagon-net-zero-ai-data-center.html","megawatts":1500,"companies":["DataVolt","NEOM"],"country":"Saudi Arabia","region":"Oxagon, NEOM","city":"Oxagon","status":"agreement signed; phased Oxagon AI factory campus with first phase expected operational by 2028","energy_type":"NEOM wind/solar-backed net-zero AI factory campus power plan","ai_focus":"AI factory / HPC and training campus","start_year":2028,"lat":27.569,"lng":35.027,"sources":["https://www.neom.com/en-us/newsroom/datavolt-signs-agreement-with-neom","https://www.datacenterdynamics.com/en/news/datavolt-plans-15gw-data-center-campus-in-neoms-oxagon/"]},{"id":"openai-stargate-data-center-texas","title":"Stargate Abilene AI Data Center Campus","url":"https://aidatacenterindex.com/datacenters/openai-stargate-data-center-texas.html","megawatts":1200,"companies":["OpenAI","Oracle","Crusoe","Lancium","NVIDIA"],"country":"United States","region":"Abilene, Texas","city":"Abilene","status":"first phase live; full 1.2 GW campus under construction","energy_type":"Grid interconnection with battery, solar, wind, backup gas turbines, and closed-loop cooling","ai_focus":"AI training and inference workloads on Oracle Cloud Infrastructure","start_year":2025,"lat":32.449,"lng":-99.733,"sources":["https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live","https://openai.com/index/five-new-stargate-sites/","https://www.oracle.com/se/news/announcement/ai-world-oracle-unveils-next-generation-oci-zettascale10-cluster-for-ai-2025-10-14/"]},{"id":"vistra-comanche-peak-nuclear-power-plant-expansion","title":"AWS Project Spectrum / Comanche Peak Nuclear Data Center Campus","url":"https://aidatacenterindex.com/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html","megawatts":1200,"companies":["Amazon Web Services","Vistra Corp"],"country":"United States","region":"Hood and Somervell Counties, Texas","city":"","status":"planned data-center campus / contracted power delivery beginning Q4 2027","energy_type":"1,200 MW contracted carbon-free power supply from Comanche Peak nuclear plant","ai_focus":"AWS cloud and AI infrastructure; specific workload mix not disclosed","start_year":2027,"lat":null,"lng":null,"sources":["https://www.sec.gov/Archives/edgar/data/1692819/000119312525221774/d43667d8k.htm","https://investor.vistracorp.com/2024-07-30-Vistra-Receives-Approval-to-Operate-Comanche-Peak-Nuclear-Plant-Through-2053","https://world-nuclear-news.org/articles/ppas-support-extended-operations-at-vistra-plants","https://www.datacenterdynamics.com/en/news/amazon-looks-to-build-large-scale-data-center-campus-next-to-nuclear-plant-in-texas/","https://www.utilitydive.com/news/vistra-corp-natural-gas-permian-basin-power-plant/761358/"]},{"id":"edf-opcore-montereau-ai-data-center-france","title":"EDF / OpCore Montereau AI Data Center","url":"https://aidatacenterindex.com/datacenters/edf-opcore-montereau-ai-data-center-france.html","megawatts":700,"companies":["OpCore","EDF","iliad Group","InfraVia Capital Partners"],"country":"France","region":"Montereau-Vallee-de-la-Seine, Ile-de-France","city":"","status":"planned / exclusive negotiations for former power-plant site","energy_type":"Low-carbon French grid connection on EDF former power-plant land","ai_focus":"AI computing center and hyperscale infrastructure; tenant workload mix not disclosed","start_year":2025,"lat":null,"lng":null,"sources":["https://www.iliad.fr/en/actualites/article/edf-and-op-core-to-develop-a-high-power-data-center-on-site-of-former-thermal-power-plant-in-montereau-vallee-de-la-seine-wider-paris-metropolitan-region","https://www.datacenterdynamics.com/en/news/opcore-plans-4bn-data-center-at-former-edf-coal-power-plant-outside-paris-france/"]},{"id":"google-pine-island-minnesota-ai-campus","title":"Google Pine Island AI Data Center (Minnesota)","url":"https://aidatacenterindex.com/datacenters/google-pine-island-minnesota-ai-campus.html","megawatts":600,"companies":["Google"],"country":"United States","region":"Pine Island, Minnesota","city":"Pine Island","status":"announced","energy_type":"Wind/Solar PPA (Xcel Energy)","ai_focus":"Training and Inference","start_year":2026,"lat":44.202,"lng":-92.646,"sources":["https://blog.google/outreach-initiatives/sustainability/2026-data-center-expansion-texas-minnesota/"]},{"id":"microsoft-india-ai-infrastructure-hyderabad-pune","title":"Microsoft India South Central Cloud Region Program","url":"https://aidatacenterindex.com/datacenters/microsoft-india-ai-infrastructure-hyderabad-pune.html","megawatts":600,"companies":["Microsoft"],"country":"India","region":"Hyderabad / India South Central cloud-region program","city":"","status":"under construction / planned cloud-region program; Microsoft says India South Central is set to go live in mid-2026","energy_type":"Unknown facility-specific energy mix; renewable claims not selected for this program record","ai_focus":"Sovereign-ready Microsoft cloud and AI infrastructure, Azure regions, AI platforms, and hyperscale infrastructure","start_year":2026,"lat":null,"lng":null,"sources":["https://news.microsoft.com/source/asia/2025/12/09/microsoft-invests-us17-5-billion-in-india-to-drive-ai-diffusion-at-population-scale/","https://news.microsoft.com/en-in/microsoft-india-hyderabad-data-center-region-intent/","https://www.datacenterdynamics.com/en/news/microsoft-and-aws-to-increase-data-center-presence-in-telangana/"]},{"id":"alibaba-cloud-zhangbei-ai-data-center-china","title":"Alibaba Cloud — Zhangbei Super Data Center","url":"https://aidatacenterindex.com/datacenters/alibaba-cloud-zhangbei-ai-data-center-china.html","megawatts":500,"companies":["Alibaba Cloud"],"country":"China","region":"Hebei","city":"Zhangbei","status":"operational","energy_type":"Renewable (wind + solar)","ai_focus":"Training (Tongyi Qianwen LLMs), Inference","start_year":2020,"lat":41.1532,"lng":114.7008,"sources":["https://www.alibabacloud.com/blog/alibaba-cloud-data-center","https://www.datacenterknowledge.com/china/alibaba-cloud-zhangbei"]},{"id":"amazon-aws-ohio-us-east-2-new-albany","title":"Amazon Web Services — Ohio Region AI Campus (us-east-2)","url":"https://aidatacenterindex.com/datacenters/amazon-aws-ohio-us-east-2-new-albany.html","megawatts":500,"companies":["Amazon Web Services"],"country":"United States","region":"Ohio","city":"New Albany","status":"operational","energy_type":"Mixed (renewable targets)","ai_focus":"Training, Inference (AWS Bedrock, Trainium, Inferentia)","start_year":2016,"lat":40.088,"lng":-82.793,"sources":["https://aws.amazon.com/about-aws/global-infrastructure/regions_az/","https://www.dispatch.com/story/business/2023/04/04/amazon-aws-new-albany-ohio-data-centers/70066019007/"]},{"id":"aws-tokyo-ap-northeast-1-japan","title":"Amazon Web Services — AP-NORTHEAST-1 Tokyo Region","url":"https://aidatacenterindex.com/datacenters/aws-tokyo-ap-northeast-1-japan.html","megawatts":500,"companies":["Amazon Web Services"],"country":"Japan","region":"Tokyo","city":"Tokyo","status":"operational","energy_type":"Mixed (Grid with renewable targets — TEPCO/JERA grid)","ai_focus":"General Cloud + AI Inference (Bedrock, SageMaker AP, Trainium/Inferentia clusters)","start_year":2011,"lat":35.689,"lng":139.692,"sources":["https://aws.amazon.com/about-aws/global-infrastructure/regions_az/","https://aws.amazon.com/jp/local/japan/"]},{"id":"bce-national-ai-data-center-initiative-canada","title":"Bell AI Fabric Data Center Network (British Columbia)","url":"https://aidatacenterindex.com/datacenters/bce-national-ai-data-center-initiative-canada.html","megawatts":500,"companies":["Bell Canada (BCE)"],"country":"Canada","region":"British Columbia","city":"Kamloops & Merritt","status":"under_construction","energy_type":"Grid (Hydroelectric)","ai_focus":"AI Inference & Training","start_year":2025,"lat":50.667,"lng":-120.319,"sources":["https://www.bell.ca/Corporate/Media_Centre/News_Releases/Bell-invests-in-AI-infrastructure-to-create-Canadas-largest-AI-supercluster-in-Kamloops","https://datacenternews.ca/news/bell-canada-unveils-ambitious-500mw-ai-fabric-data-center-network"]},{"id":"digital-edge-cgk-ai-mega-campus-indonesia","title":"Digital Edge — CGK AI Mega Campus","url":"https://aidatacenterindex.com/datacenters/digital-edge-cgk-ai-mega-campus-indonesia.html","megawatts":500,"companies":["Digital Edge"],"country":"Indonesia","region":"West Java","city":"Bekasi","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":-6.235,"lng":106.982,"sources":["https://www.digitaledgedc.com/digital-edge-announces-massive-ai-ready-campus-in-jakarta/"]},{"id":"google-iowa-council-bluffs-ai-data-center","title":"Google — Council Bluffs, Iowa AI Data Center Campus","url":"https://aidatacenterindex.com/datacenters/google-iowa-council-bluffs-ai-data-center.html","megawatts":500,"companies":["Google"],"country":"United States","region":"Iowa","city":"Council Bluffs","status":"operational","energy_type":"Renewable","ai_focus":"Training, Inference (Google AI, Gemini training)","start_year":2007,"lat":41.263,"lng":-95.86,"sources":["https://www.google.com/about/datacenters/locations/council-bluffs/","https://www.omaha.com/news/local/google-will-spend-billion-council-bluffs/article_8f5ee866-0fd2-5a57-b72d-7a18c1fa56b6.html"]},{"id":"microsoft-goodyear-arizona-ai-campus","title":"Microsoft Azure — Goodyear, Arizona AI Campus","url":"https://aidatacenterindex.com/datacenters/microsoft-goodyear-arizona-ai-campus.html","megawatts":500,"companies":["Microsoft"],"country":"United States","region":"Arizona","city":"Goodyear","status":"operational","energy_type":"Renewable (solar + wind PPAs)","ai_focus":"Training + Inference (Azure OpenAI Service, Microsoft Copilot)","start_year":2016,"lat":33.435,"lng":-112.358,"sources":["https://datacenters.microsoft.com/globe/detail/Goodyear","https://www.bizjournals.com/phoenix/news/2023/09/microsoft-goodyear-arizona-data-center-expansion.html","https://azdeq.gov/major-facilities/microsoft-data-center-goodyear"]},{"id":"microsoft-japan-ai-data-centers","title":"Microsoft — Japan AI Data Centers (Tokyo & Osaka)","url":"https://aidatacenterindex.com/datacenters/microsoft-japan-ai-data-centers.html","megawatts":500,"companies":["Microsoft"],"country":"Japan","region":"Tokyo & Osaka","city":"Tokyo","status":"operational","energy_type":"Grid (TEPCO / Kansai Electric) + Renewable PPA","ai_focus":"Training and Inference (Azure OpenAI, Copilot)","start_year":2024,"lat":35.6762,"lng":139.6503,"sources":["https://blogs.microsoft.com/on-the-issues/2024/04/10/microsoft-japan-ai-investment/"]},{"id":"microsoft-quincy-washington-ai-campus","title":"Microsoft — Quincy, Washington AI Data Center Campus","url":"https://aidatacenterindex.com/datacenters/microsoft-quincy-washington-ai-campus.html","megawatts":500,"companies":["Microsoft"],"country":"United States","region":"Washington State","city":"Quincy","status":"operational","energy_type":"Renewable","ai_focus":"Training, Inference (Azure AI, OpenAI partnership)","start_year":2007,"lat":47.234,"lng":-119.852,"sources":["https://azure.microsoft.com/en-us/global-infrastructure/geographies/","https://www.seattletimes.com/business/technology/quincy-is-microsofts-data-center-capital/"]},{"id":"microsoft-sweden-central-ai-infrastructure","title":"Microsoft — Sweden Central AI Infrastructure","url":"https://aidatacenterindex.com/datacenters/microsoft-sweden-central-ai-infrastructure.html","megawatts":500,"companies":["Microsoft"],"country":"Sweden","region":"Gävle / Sandviken / Staffanstorp","city":"Gävle","status":"operational","energy_type":"Renewable (100% Carbon-Free)","ai_focus":"Training and Inference (20,000+ GPUs)","start_year":2021,"lat":60.6749,"lng":17.1413,"sources":["https://news.microsoft.com/en-se/2024/06/03/microsoft-announces-3-2-billion-investment-to-accelerate-swedens-ai-transformation/"]},{"id":"oracle-malaysia-public-cloud-region","title":"Oracle — Malaysia Public Cloud Region","url":"https://aidatacenterindex.com/datacenters/oracle-malaysia-public-cloud-region.html","megawatts":500,"companies":["Oracle"],"country":"Malaysia","region":"Greater Kuala Lumpur","city":"Kuala Lumpur","status":"planned","energy_type":"Mixed","ai_focus":"Inference and Training (OCI Supercluster)","start_year":2024,"lat":3.139,"lng":101.6869,"sources":["https://www.oracle.com/news/announcement/oracle-to-invest-over-6-point-5-billion-to-bring-public-cloud-region-to-malaysia-2024-10-02/"]},{"id":"aws-eu-west-1-dublin-ireland","title":"Amazon Web Services — EU-WEST-1 Dublin Region","url":"https://aidatacenterindex.com/datacenters/aws-eu-west-1-dublin-ireland.html","megawatts":450,"companies":["Amazon Web Services"],"country":"Ireland","region":"County Dublin","city":"Dublin","status":"operational","energy_type":"Renewable (100% matched via PPAs)","ai_focus":"General Cloud + AI Inference (Bedrock, SageMaker EU workloads)","start_year":2007,"lat":53.333,"lng":-6.249,"sources":["https://aws.amazon.com/about-aws/global-infrastructure/regions_az/","https://aws.amazon.com/sustainability/"]},{"id":"applied-digital-ellendale-north-dakota-gpu-cloud","title":"Applied Digital Polaris Forge 1 - Ellendale AI Factory","url":"https://aidatacenterindex.com/datacenters/applied-digital-ellendale-north-dakota-gpu-cloud.html","megawatts":400,"companies":["Applied Digital","CoreWeave"],"country":"United States","region":"North Dakota","city":"Ellendale","status":"staged campus under construction","energy_type":"Renewable-power design intent and cool-climate efficiency","ai_focus":"AI and HPC infrastructure for CoreWeave","start_year":2025,"lat":46.001,"lng":-98.525,"sources":["https://ir.applieddigital.com/news-events/press-releases/detail/123/applied-digital-announces-250mw-ai-data-center-lease-with","https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-finalizes-additional-150mw-lease-with"]},{"id":"aws-london-uk-south-region","title":"Amazon Web Services — EU-WEST-2 London Region","url":"https://aidatacenterindex.com/datacenters/aws-london-uk-south-region.html","megawatts":400,"companies":["Amazon Web Services"],"country":"United Kingdom","region":"Greater London","city":"London","status":"operational","energy_type":"Renewable (100% via PPAs)","ai_focus":"General Cloud + AI Inference (Bedrock, SageMaker UK, public sector AI)","start_year":2016,"lat":51.509,"lng":-0.118,"sources":["https://aws.amazon.com/about-aws/global-infrastructure/regions_az/","https://www.amazon.co.uk/b?ie=UTF8&node=14682469031"]},{"id":"google-eemshaven-netherlands-ai-data-center","title":"Google — Eemshaven AI Data Center","url":"https://aidatacenterindex.com/datacenters/google-eemshaven-netherlands-ai-data-center.html","megawatts":400,"companies":["Google"],"country":"Netherlands","region":"Groningen","city":"Eemshaven","status":"operational","energy_type":"Renewable (100% wind and solar PPAs)","ai_focus":"Training (EU AI research), Inference (Google Cloud EU, Search, Translate)","start_year":2016,"lat":53.437,"lng":6.836,"sources":["https://cloud.google.com/about/locations/europe","https://www.google.com/about/datacenters/locations/eemshaven/"]},{"id":"google-the-dalles-oregon-ai-data-center","title":"Google — The Dalles Oregon Data Center","url":"https://aidatacenterindex.com/datacenters/google-the-dalles-oregon-ai-data-center.html","megawatts":400,"companies":["Google"],"country":"United States","region":"Oregon","city":"The Dalles","status":"operational","energy_type":"Renewable (hydropower)","ai_focus":"General Cloud + AI Inference","start_year":2006,"lat":45.5946,"lng":-121.1787,"sources":["https://www.google.com/about/datacenters/locations/the-dalles/","https://datacenternews.asia/story/google-dalles-oregon-data-center"]},{"id":"huawei-cloud-guizhou-ai-data-center-china","title":"Huawei Cloud — Guizhou AI Data Center","url":"https://aidatacenterindex.com/datacenters/huawei-cloud-guizhou-ai-data-center-china.html","megawatts":400,"companies":["Huawei Cloud"],"country":"China","region":"Guizhou","city":"Guiyang","status":"operational","energy_type":"Hydropower","ai_focus":"Training (Pangu models), Inference, Sovereign AI Cloud","start_year":2021,"lat":26.5982,"lng":106.7076,"sources":["https://www.huaweicloud.com/intl/en-us/about/data-centers.html","https://www.datacenterdynamics.com/en/news/huawei-cloud-guizhou/"]},{"id":"ntt-telangana-ai-data-center-cluster-india","title":"NTT Data / Neysa Telangana AI Data Center Cluster","url":"https://aidatacenterindex.com/datacenters/ntt-telangana-ai-data-center-cluster-india.html","megawatts":400,"companies":["NTT Data","Neysa Networks","Government of Telangana"],"country":"India","region":"Telangana / Hyderabad","city":"Hyderabad","status":"announced MoU-backed AI data-center cluster","energy_type":"Unknown; opened MoU coverage does not disclose source-backed facility energy procurement","ai_focus":"AI supercomputing infrastructure, 25,000 GPUs, sovereign/enterprise AI workloads","start_year":2025,"lat":17.385,"lng":78.487,"sources":["https://w.media/ntt-data-neysa-networks-and-telangana-govt-sign-mou-with-to-build-ai-dc-cluster-worth-rs-10500-crores/","https://evertiq.com/design/2025-04-30-ntt-signs-mou-to-set-up-12b-ai-data-centre-cluster-in-hyderabad"]},{"id":"aws-singapore-ap-southeast-1","title":"Amazon Web Services — AP-SOUTHEAST-1 Singapore Region","url":"https://aidatacenterindex.com/datacenters/aws-singapore-ap-southeast-1.html","megawatts":350,"companies":["Amazon Web Services"],"country":"Singapore","region":"Central Region","city":"Singapore","status":"operational","energy_type":"Grid (SP Group — Singapore national grid)","ai_focus":"General Cloud + AI Inference (Bedrock, SageMaker SEA, APAC AI hub)","start_year":2010,"lat":1.352,"lng":103.82,"sources":["https://aws.amazon.com/about-aws/global-infrastructure/regions_az/","https://aws.amazon.com/sg/"]},{"id":"google-south-carolina-ai-data-center","title":"Google — Berkeley County Data Center Campus","url":"https://aidatacenterindex.com/datacenters/google-south-carolina-ai-data-center.html","megawatts":350,"companies":["Google"],"country":"United States","region":"South Carolina","city":"Moncks Corner","status":"operational","energy_type":"Renewable","ai_focus":"Training, Inference (Google AI, Gemini)","start_year":2007,"lat":33.196,"lng":-79.995,"sources":["https://www.google.com/about/datacenters/locations/south-carolina/","https://www.postandcourier.com/business/tech/google-data-center-berkeley-county/article_67b8e532-8e1e-11ed-b7cb-ef66b3e6b9a3.html"]},{"id":"microsoft-azure-ireland-north-europe","title":"Microsoft Azure — North Europe Region (Dublin)","url":"https://aidatacenterindex.com/datacenters/microsoft-azure-ireland-north-europe.html","megawatts":350,"companies":["Microsoft"],"country":"Ireland","region":"County Dublin","city":"Dublin","status":"operational","energy_type":"Renewable (100% via PPAs)","ai_focus":"Inference (Azure OpenAI Service, Copilot EU), General Cloud AI","start_year":2009,"lat":53.342,"lng":-6.267,"sources":["https://azure.microsoft.com/en-us/global-infrastructure/geographies/#geographies","https://blogs.microsoft.com/blog/2023/01/23/microsofts-multibillion-dollar-investment-in-ireland/"]},{"id":"aws-mexico-central-region-queretaro","title":"AWS Mexico (Central) Region — Querétaro","url":"https://aidatacenterindex.com/datacenters/aws-mexico-central-region-queretaro.html","megawatts":345,"companies":["Amazon Web Services"],"country":"Mexico","region":"Querétaro","city":"Querétaro","status":"operational","energy_type":"Mixed (Grid with renewable projects)","ai_focus":"Inference and Training (Graviton, Trainium, Inferentia)","start_year":2025,"lat":20.5888,"lng":-100.3899,"sources":["https://aws.amazon.com/about-aws/whats-new/2025/01/announcing-the-aws-mexico-central-region/","https://mexicobusiness.news/tech/news/aws-invest-us5-billion-mexico-data-center-hub"]},{"id":"microsoft-mexico-cloud-region-queretaro","title":"Microsoft — Mexico (Central) Cloud Region (Querétaro)","url":"https://aidatacenterindex.com/datacenters/microsoft-mexico-cloud-region-queretaro.html","megawatts":345,"companies":["Microsoft"],"country":"Mexico","region":"Querétaro","city":"Querétaro","status":"operational","energy_type":"Mixed","ai_focus":"Inference and Cloud Workloads (Azure OpenAI, Copilot)","start_year":2024,"lat":20.5888,"lng":-100.3899,"sources":["https://news.microsoft.com/en-xm/2024/02/26/microsoft-launches-its-first-cloud-datacenter-region-in-mexico/","https://www.datacenterdynamics.com/en/news/microsoft-announces-launch-of-mexican-azure-region/"]},{"id":"aws-brazil-cloud-region-expansion","title":"AWS — Brazil AI Infrastructure (Expansion)","url":"https://aidatacenterindex.com/datacenters/aws-brazil-cloud-region-expansion.html","megawatts":300,"companies":["Amazon Web Services"],"country":"Brazil","region":"São Paulo","city":"São Paulo","status":"operational","energy_type":"Renewable (Solar and Wind projects)","ai_focus":"Inference and Training (Trainium, Inferentia, Graviton)","start_year":2024,"lat":-23.5505,"lng":-46.6333,"sources":["https://aws.amazon.com/about-aws/whats-new/2024/09/aws-invest-10-billion-reais-brazil-cloud-ai/","https://www.reuters.com/technology/amazon-invest-18-bln-brazil-cloud-computing-10-years-2024-09-11/"]},{"id":"aws-malaysia-cloud-region","title":"AWS — Malaysia Cloud Region (Cyberjaya)","url":"https://aidatacenterindex.com/datacenters/aws-malaysia-cloud-region.html","megawatts":300,"companies":["Amazon Web Services"],"country":"Malaysia","region":"Greater Kuala Lumpur","city":"Cyberjaya","status":"operational","energy_type":"Mixed (Grid with renewable projects)","ai_focus":"Inference and Training (Trainium, Inferentia, Graviton)","start_year":2024,"lat":2.9228,"lng":101.6575,"sources":["https://aws.amazon.com/about-aws/whats-new/2024/08/aws-launches-asia-pacific-malaysia-region/","https://www.thestar.com.my/business/business-news/2024/08/15/aws-announces-malaysia-region-with-us6bil-investment"]},{"id":"aws-sydney-ap-southeast-2-australia","title":"Amazon Web Services — AP-SOUTHEAST-2 Sydney Region","url":"https://aidatacenterindex.com/datacenters/aws-sydney-ap-southeast-2-australia.html","megawatts":300,"companies":["Amazon Web Services"],"country":"Australia","region":"New South Wales","city":"Sydney","status":"operational","energy_type":"Renewable (100% matched via Large-scale Generation Certificates)","ai_focus":"General Cloud + AI Inference (Bedrock, SageMaker APAC South, government AI)","start_year":2012,"lat":-33.869,"lng":151.209,"sources":["https://aws.amazon.com/about-aws/global-infrastructure/regions_az/","https://aws.amazon.com/au/"]},{"id":"google-changhua-ai-data-center-taiwan","title":"Google — Changhua AI Data Center","url":"https://aidatacenterindex.com/datacenters/google-changhua-ai-data-center-taiwan.html","megawatts":300,"companies":["Google"],"country":"Taiwan","region":"Changhua County","city":"Changhua City","status":"operational","energy_type":"Renewable","ai_focus":"Training and Inference","start_year":null,"lat":24.051,"lng":120.433,"sources":["https://www.mingtiandi.com/real-estate/data-centers/google-takes-300mw-taiwan-solar-stake-as-asia-data-center-demand-spikes/"]},{"id":"google-saint-ghislain-belgium-ai-data-center","title":"Google — Saint-Ghislain, Belgium AI Data Center Campus","url":"https://aidatacenterindex.com/datacenters/google-saint-ghislain-belgium-ai-data-center.html","megawatts":300,"companies":["Google"],"country":"Belgium","region":"Wallonia","city":"Saint-Ghislain","status":"operational","energy_type":"Renewable","ai_focus":"Training, Inference (Google AI, Gemini Europe)","start_year":2010,"lat":50.45,"lng":3.828,"sources":["https://www.google.com/about/datacenters/locations/saint-ghislain/","https://datacenters.google/news/saint-ghislain-data-center-facility-tour"]},{"id":"meta-odense-denmark-ai-ready-data-center","title":"Meta — Odense AI-Ready Data Center","url":"https://aidatacenterindex.com/datacenters/meta-odense-denmark-ai-ready-data-center.html","megawatts":300,"companies":["Meta"],"country":"Denmark","region":"Funen","city":"Odense","status":"operational","energy_type":"Renewable (District heating integration)","ai_focus":"Training and Inference (Llama 3)","start_year":2019,"lat":55.4038,"lng":10.4024,"sources":["https://datacenters.atmeta.com/odense/"]},{"id":"meta-papillion-nebraska-ai-data-center","title":"Meta — Papillion, Nebraska AI Data Center","url":"https://aidatacenterindex.com/datacenters/meta-papillion-nebraska-ai-data-center.html","megawatts":300,"companies":["Meta"],"country":"United States","region":"Nebraska","city":"Papillion","status":"operational","energy_type":"Renewable (wind PPAs)","ai_focus":"Training + Inference (LLaMA, Reels ranking, Ads)","start_year":2011,"lat":41.132,"lng":-96.037,"sources":["https://sustainability.fb.com/report/2023-sustainability-report/","https://www.metaincubator.com/newsroom/meta-papillion-nebraska-data-center-expansion/","https://www.omaha.com/business/tech/meta-data-center-papillion-sarpy/article_4a55b7f2-34f4-11ee-9fba-5f9b6ce4e25d.html"]},{"id":"microsoft-azure-netherlands-region","title":"Microsoft Azure — Netherlands Region (Amsterdam)","url":"https://aidatacenterindex.com/datacenters/microsoft-azure-netherlands-region.html","megawatts":300,"companies":["Microsoft"],"country":"Netherlands","region":"North Holland","city":"Amsterdam","status":"operational","energy_type":"Renewable (100% via PPAs)","ai_focus":"Inference (Azure OpenAI Service EU), General Cloud AI","start_year":2014,"lat":52.37,"lng":4.895,"sources":["https://azure.microsoft.com/en-us/global-infrastructure/geographies/#geographies","https://news.microsoft.com/europe/2024/"]},{"id":"microsoft-malaysia-ai-cloud","title":"Microsoft — Malaysia AI Cloud","url":"https://aidatacenterindex.com/datacenters/microsoft-malaysia-ai-cloud.html","megawatts":300,"companies":["Microsoft"],"country":"Malaysia","region":"Greater Kuala Lumpur / Johor","city":"Kuala_Lumpur","status":"operational","energy_type":"Mixed","ai_focus":"Inference and Training (Azure AI)","start_year":2024,"lat":3.139,"lng":101.6869,"sources":["https://news.microsoft.com/en-my/2024/05/02/microsoft-announces-us2-2-billion-investment-to-advance-malaysias-cloud-and-ai-ambitions/"]},{"id":"microsoft-san-antonio-texas-ai-data-center","title":"Microsoft — San Antonio, Texas AI Data Center Campus","url":"https://aidatacenterindex.com/datacenters/microsoft-san-antonio-texas-ai-data-center.html","megawatts":300,"companies":["Microsoft"],"country":"United States","region":"Texas","city":"San Antonio","status":"operational","energy_type":"Mixed (renewable targets)","ai_focus":"Training, Inference (Azure AI, OpenAI partnership)","start_year":2007,"lat":29.461,"lng":-98.505,"sources":["https://azure.microsoft.com/en-us/explore/global-infrastructure/data-residency/","https://www.bizjournals.com/sanantonio/news/2023/05/12/microsoft-data-center-expansion.html"]},{"id":"meta-clonee-ireland-ai-data-center","title":"Meta — Clonee AI Data Center Campus","url":"https://aidatacenterindex.com/datacenters/meta-clonee-ireland-ai-data-center.html","megawatts":288,"companies":["Meta"],"country":"Ireland","region":"County Meath","city":"Clonee","status":"operational","energy_type":"Renewable (100% matched)","ai_focus":"Training (Llama models), Inference (Facebook/Instagram AI features, EU compliance)","start_year":2012,"lat":53.418,"lng":-6.487,"sources":["https://sustainability.fb.com/data-centers/","https://datacentremagazine.com/articles/meta-expands-clonee-campus-to-288-mw"]},{"id":"datagrid-ai-factory-southland-new-zealand","title":"Datagrid — 'AI Factory' (Southland)","url":"https://aidatacenterindex.com/datacenters/datagrid-ai-factory-southland-new-zealand.html","megawatts":280,"companies":["Datagrid New Zealand"],"country":"New Zealand","region":"Southland","city":"Invercargill","status":"planned","energy_type":"Renewable","ai_focus":"Training and Inference","start_year":null,"lat":-46.413,"lng":168.353,"sources":["https://www.rnz.co.nz/news/business/512345/datagrid-gets-consent-for-massive-southland-data-centre"]},{"id":"aws-indonesia-cloud-region","title":"AWS — Indonesia Cloud Region (Jakarta)","url":"https://aidatacenterindex.com/datacenters/aws-indonesia-cloud-region.html","megawatts":250,"companies":["Amazon Web Services"],"country":"Indonesia","region":"Jakarta","city":"Jakarta","status":"operational","energy_type":"Mixed","ai_focus":"Inference and Training (Trainium, Inferentia)","start_year":2021,"lat":-6.2088,"lng":106.8456,"sources":["https://aws.amazon.com/about-aws/whats-new/2021/12/aws-launches-asia-pacific-jakarta-region/","https://www.reuters.com/technology/amazon-invest-5-bln-indonesia-cloud-computing-15-years-2021-12-13/"]},{"id":"google-cloud-belgium-st-ghislain","title":"Google Cloud — Belgium Data Center (Saint-Ghislain)","url":"https://aidatacenterindex.com/datacenters/google-cloud-belgium-st-ghislain.html","megawatts":250,"companies":["Google"],"country":"Belgium","region":"Hainaut","city":"Saint-Ghislain","status":"operational","energy_type":"Renewable","ai_focus":"AI training, Gemini inference, European AI cloud services","start_year":2010,"lat":50.4524,"lng":3.8218,"sources":["https://www.google.com/about/datacenters/locations/saint-ghislain/"]},{"id":"google-dublin-ireland-ai-data-center","title":"Google — Dublin AI Data Center Campus","url":"https://aidatacenterindex.com/datacenters/google-dublin-ireland-ai-data-center.html","megawatts":250,"companies":["Google"],"country":"Ireland","region":"County Dublin","city":"Dublin","status":"operational","energy_type":"Renewable (100% carbon-free energy goal)","ai_focus":"Inference (Google Cloud EU, Search, YouTube EU), Training","start_year":2011,"lat":53.328,"lng":-6.249,"sources":["https://www.google.com/about/datacenters/locations/dublin/","https://cloud.google.com/about/locations/#europe"]},{"id":"ntt-data-ai-singapore-hyperscale","title":"NTT DATA — Singapore Hyperscale AI Campus","url":"https://aidatacenterindex.com/datacenters/ntt-data-ai-singapore-hyperscale.html","megawatts":250,"companies":["NTT DATA","NTT Ltd."],"country":"Singapore","region":"Jurong","city":"Singapore","status":"operational","energy_type":"Mixed (grid)","ai_focus":"General Cloud + AI Inference (ASEAN region)","start_year":2020,"lat":1.32,"lng":103.7,"sources":["https://www.nttdata.com/global/en/services/infrastructure/data-centers","https://www.datacenterdynamics.com/en/news/ntt-singapore-expansion/"]},{"id":"google-skien-ai-campus-norway","title":"Google — Skien AI Campus","url":"https://aidatacenterindex.com/datacenters/google-skien-ai-campus-norway.html","megawatts":240,"companies":["Google"],"country":"Norway","region":"Telemark","city":"Skien","status":"under_construction","energy_type":"Hydroelectric","ai_focus":"Training and Inference","start_year":null,"lat":59.209,"lng":9.608,"sources":["https://www.mordorintelligence.com/industry-reports/norway-data-center-market"]},{"id":"meta-montgomery-ai-expansion-alabama","title":"Meta — Montgomery AI Expansion","url":"https://aidatacenterindex.com/datacenters/meta-montgomery-ai-expansion-alabama.html","megawatts":227,"companies":["Meta"],"country":"United States","region":"Alabama","city":"Montgomery","status":"under_construction","energy_type":"Renewable","ai_focus":"Training and Inference","start_year":null,"lat":32.366,"lng":-86.299,"sources":["https://www.madeinalabama.com/2024/05/meta-plans-800-million-expansion-at-montgomery-data-center/"]},{"id":"vantage-nevada-ai-data-center","title":"Vantage Nevada AI Data Center (NV1)","url":"https://aidatacenterindex.com/datacenters/vantage-nevada-ai-data-center.html","megawatts":224,"companies":["Vantage Data Centers"],"country":"United States","region":"Clark County, Nevada","city":"Henderson","status":"under_construction","energy_type":"Solar (Utility PPA)","ai_focus":"Hyperscale Training and Inference","start_year":2025,"lat":36.039,"lng":-114.982,"sources":["https://vantage-dc.com/news/vantage-breaks-ground-on-nevada-campus"]},{"id":"true-internet-dc-thailand-ai-campus","title":"True Internet DC — Thailand AI Campus","url":"https://aidatacenterindex.com/datacenters/true-internet-dc-thailand-ai-campus.html","megawatts":223,"companies":["True Internet Data Center"],"country":"Thailand","region":"Chonburi","city":"Chonburi","status":"planned","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":13.361,"lng":100.985,"sources":["https://www.bangkokpost.com/business/2723456/true-idc-to-build-3-billion-baht-ai-data-center"]},{"id":"google-cloud-malaysia-ai-data-center","title":"Google Cloud Malaysia AI Data Center (Johor Bahru)","url":"https://aidatacenterindex.com/datacenters/google-cloud-malaysia-ai-data-center.html","megawatts":220,"companies":["Google"],"country":"Malaysia","region":"Johor Bahru, Malaysia","city":"Johor Bahru","status":"under_construction","energy_type":"Grid with renewable energy targets","ai_focus":"Inference (Gemini API, Vertex AI) and cloud workloads","start_year":2024,"lat":1.4927,"lng":103.7414,"sources":["https://cloud.google.com/blog/topics/infrastructure/google-cloud-to-invest-2-billion-in-malaysia"]},{"id":"google-singapore-ai-data-center","title":"Google — Singapore AI Data Center (Asia-Southeast1)","url":"https://aidatacenterindex.com/datacenters/google-singapore-ai-data-center.html","megawatts":220,"companies":["Google"],"country":"Singapore","region":"Jurong West","city":"Singapore","status":"operational","energy_type":"Grid (SP Group) + Renewable energy certificates","ai_focus":"Inference (Google Cloud SEA, Search APAC, YouTube, Translate), Training","start_year":2013,"lat":1.339,"lng":103.708,"sources":["https://cloud.google.com/about/locations/singapore","https://www.google.com/about/datacenters/locations/jurong-west/"]},{"id":"apple-maiden-north-carolina-data-center","title":"Apple — Maiden, North Carolina Data Center","url":"https://aidatacenterindex.com/datacenters/apple-maiden-north-carolina-data-center.html","megawatts":200,"companies":["Apple"],"country":"United States","region":"North Carolina","city":"Maiden","status":"operational","energy_type":"Renewable (solar + wind PPAs)","ai_focus":"Inference (Siri, Apple Intelligence, iCloud AI)","start_year":2012,"lat":35.572,"lng":-81.211,"sources":["https://www.apple.com/newsroom/2012/04/26Apple-Begins-Powering-Data-Center-with-Renewable-Energy/","https://www.bizjournals.com/charlotte/news/2023/09/apple-maiden-data-center.html","https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2024.pdf"]},{"id":"aws-thailand-cloud-region","title":"AWS — Thailand Cloud Region (Asia Pacific)","url":"https://aidatacenterindex.com/datacenters/aws-thailand-cloud-region.html","megawatts":200,"companies":["Amazon Web Services"],"country":"Thailand","region":"Bangkok / Chonburi","city":"Bangkok","status":"operational","energy_type":"Mixed","ai_focus":"Inference and Training (Trainium, Inferentia)","start_year":2025,"lat":13.7563,"lng":100.5018,"sources":["https://aws.amazon.com/about-aws/whats-new/2025/01/aws-launches-asia-pacific-thailand-region/","https://www.nationthailand.com/business/tech/40040777"]},{"id":"equinix-amsterdam-ai-interconnect-hub","title":"Equinix — Amsterdam AI Interconnect Campus (AM1–AM11)","url":"https://aidatacenterindex.com/datacenters/equinix-amsterdam-ai-interconnect-hub.html","megawatts":200,"companies":["Equinix"],"country":"Netherlands","region":"North Holland","city":"Amsterdam","status":"operational","energy_type":"Renewable (100% via Green Power contracts)","ai_focus":"Inference (colocation and interconnection for AI cloud customers)","start_year":2000,"lat":52.374,"lng":4.898,"sources":["https://www.equinix.com/data-centers/europe-colocation/netherlands-colocation/amsterdam-data-centers","https://www.equinix.com/resources/analyst-reports/equinix-ai-infrastructure"]},{"id":"google-frankfurt-europe-west3-germany","title":"Google — Frankfurt AI Data Center (Europe-West3)","url":"https://aidatacenterindex.com/datacenters/google-frankfurt-europe-west3-germany.html","megawatts":200,"companies":["Google"],"country":"Germany","region":"Hesse","city":"Frankfurt","status":"operational","energy_type":"Renewable (100% — German renewable certificates)","ai_focus":"Inference (Google Cloud Germany, Vertex AI, Search EU), Training","start_year":2017,"lat":50.113,"lng":8.678,"sources":["https://cloud.google.com/about/locations/frankfurt","https://blog.google/around-the-globe/google-europe/google-cloud-germany/"]},{"id":"google-hamina-finland-ai-data-center","title":"Google — Hamina, Finland AI Data Center Campus","url":"https://aidatacenterindex.com/datacenters/google-hamina-finland-ai-data-center.html","megawatts":200,"companies":["Google"],"country":"Finland","region":"Kymenlaakso","city":"Hamina","status":"operational","energy_type":"Renewable","ai_focus":"Training, Inference (Google AI, Gemini)","start_year":2011,"lat":60.568,"lng":27.197,"sources":["https://www.google.com/about/datacenters/locations/hamina/","https://blog.google/inside-google/infrastructure/google-hamina-a-sea-cooled-data/"]},{"id":"google-south-korea-ai-data-center","title":"Google Cloud — South Korea (Seoul) Region","url":"https://aidatacenterindex.com/datacenters/google-south-korea-ai-data-center.html","megawatts":200,"companies":["Google"],"country":"South Korea","region":"Seoul Capital Area","city":"Seoul","status":"operational","energy_type":"Mixed (renewable targets)","ai_focus":"Google Cloud AI, Vertex AI, Gemini API","start_year":2020,"lat":37.5665,"lng":126.978,"sources":["https://cloud.google.com/about/locations","https://blog.google/outreach-initiatives/sustainability/google-south-korea-investment-2025/"]},{"id":"humain-ai-data-centers-saudi-arabia","title":"Humain AI Data Centers (Saudi Arabia)","url":"https://aidatacenterindex.com/datacenters/humain-ai-data-centers-saudi-arabia.html","megawatts":200,"companies":["Humain","Amazon Web Services","AMD"],"country":"Saudi Arabia","region":"Riyadh & Dammam","city":"Riyadh","status":"under_construction","energy_type":"Grid (KSA utility power)","ai_focus":"Training & Inference (national AI cloud)","start_year":2026,"lat":24.7,"lng":46.72,"sources":["https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/"]},{"id":"meta-forest-city-north-carolina-ai-campus","title":"Meta — Forest City, North Carolina AI Data Center Campus","url":"https://aidatacenterindex.com/datacenters/meta-forest-city-north-carolina-ai-campus.html","megawatts":200,"companies":["Meta"],"country":"United States","region":"North Carolina","city":"Forest City","status":"operational","energy_type":"Renewable","ai_focus":"Training, Inference (Meta AI, content delivery, Llama)","start_year":2011,"lat":35.334,"lng":-81.862,"sources":["https://about.fb.com/news/2012/11/update-from-forest-city/","https://www.datacenterknowledge.com/facebook/meta-upgrades-forest-city-nc-data-center"]},{"id":"microsoft-indonesia-jakarta-ai-cloud","title":"Microsoft — Indonesia AI Cloud","url":"https://aidatacenterindex.com/datacenters/microsoft-indonesia-jakarta-ai-cloud.html","megawatts":200,"companies":["Microsoft"],"country":"Indonesia","region":"Jakarta","city":"Jakarta","status":"planned","energy_type":"Mixed","ai_focus":"Inference and Cloud Workloads (Azure AI)","start_year":2024,"lat":-6.2088,"lng":106.8456,"sources":["https://news.microsoft.com/2024/04/30/microsoft-announces-1-7-billion-investment-to-advance-indonesias-cloud-and-ai-ambitions/"]},{"id":"stc-cloud-saudi-ai-data-center","title":"stc Cloud — Saudi Arabia AI Data Centers","url":"https://aidatacenterindex.com/datacenters/stc-cloud-saudi-ai-data-center.html","megawatts":200,"companies":["Saudi Telecom Company (stc)","stc Cloud"],"country":"Saudi Arabia","region":"Riyadh","city":"Riyadh","status":"operational","energy_type":"Mixed","ai_focus":"Inference, Sovereign AI (Vision 2030 digital services)","start_year":2022,"lat":24.7136,"lng":46.6753,"sources":["https://stccloud.com/","https://www.datacenterdynamics.com/en/news/stc-cloud-saudi-arabia-expansion/"]},{"id":"vantage-data-centers-us-west-ai-campus","title":"Vantage Data Centers — US West AI Campus (Santa Clara/Phoenix)","url":"https://aidatacenterindex.com/datacenters/vantage-data-centers-us-west-ai-campus.html","megawatts":200,"companies":["Vantage Data Centers"],"country":"United States","region":"California","city":"Santa Clara","status":"operational","energy_type":"Mixed (renewable targets)","ai_focus":"Training, Inference (hyperscale colocation for AI workloads)","start_year":2010,"lat":37.354,"lng":-121.955,"sources":["https://www.vantage-dc.com/locations/north-america/","https://www.datacenterdynamics.com/en/news/vantage-data-centers-raises-3-billion-for-ai-growth/"]},{"id":"google-cloud-denmark-fredericia","title":"Google Cloud — Denmark Data Center (Fredericia)","url":"https://aidatacenterindex.com/datacenters/google-cloud-denmark-fredericia.html","megawatts":180,"companies":["Google"],"country":"Denmark","region":"South Denmark","city":"Fredericia","status":"operational","energy_type":"Renewable","ai_focus":"AI training, Gemini services, Northern European AI cloud","start_year":2020,"lat":55.5663,"lng":9.7497,"sources":["https://www.google.com/about/datacenters/locations/fredericia/"]},{"id":"google-london-europe-west2-uk","title":"Google — London AI Data Center (Europe-West2)","url":"https://aidatacenterindex.com/datacenters/google-london-europe-west2-uk.html","megawatts":180,"companies":["Google"],"country":"United Kingdom","region":"Greater London","city":"London","status":"operational","energy_type":"Renewable (100% — UK renewable certificates)","ai_focus":"Inference (Google Cloud UK, DeepMind research, AI API), Training","start_year":2017,"lat":51.503,"lng":-0.127,"sources":["https://cloud.google.com/about/locations/london","https://deepmind.google/about/"]},{"id":"nextdc-m4-melbourne-ai-factory","title":"NEXTDC — M4 Melbourne 'AI Factory'","url":"https://aidatacenterindex.com/datacenters/nextdc-m4-melbourne-ai-factory.html","megawatts":160,"companies":["NEXTDC"],"country":"Australia","region":"Victoria","city":"Melbourne","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":-37.828,"lng":144.912,"sources":["https://www.nextdc.com/blog/nextdc-unveils-m4-melbourne-ai-factory"]},{"id":"alibaba-cloud-singapore-ai-region","title":"Alibaba Cloud — Singapore AI Region","url":"https://aidatacenterindex.com/datacenters/alibaba-cloud-singapore-ai-region.html","megawatts":150,"companies":["Alibaba Cloud"],"country":"Singapore","region":"Jurong","city":"Singapore","status":"operational","energy_type":"Mixed","ai_focus":"Inference (Qwen AI models, ASEAN enterprise cloud)","start_year":2015,"lat":1.3521,"lng":103.8198,"sources":["https://www.alibabacloud.com/global-locations/singapore","https://www.datacenterdynamics.com/en/news/alibaba-cloud-singapore/"]},{"id":"aws-osaka-ap-northeast-3-japan","title":"Amazon Web Services — Osaka Region (AP Northeast 3)","url":"https://aidatacenterindex.com/datacenters/aws-osaka-ap-northeast-3-japan.html","megawatts":150,"companies":["Amazon Web Services"],"country":"Japan","region":"Kansai","city":"Osaka","status":"operational","energy_type":"Mixed (renewable targets)","ai_focus":"Disaster recovery, AI inference, regional cloud","start_year":2021,"lat":34.6937,"lng":135.5023,"sources":["https://aws.amazon.com/about-aws/global-infrastructure/regions_az/","https://aws.amazon.com/blogs/aws/aws-asia-pacific-osaka-local-region-now-open/"]},{"id":"aws-stockholm-eu-north-1-sweden","title":"Amazon Web Services — EU-NORTH-1 Stockholm Region","url":"https://aidatacenterindex.com/datacenters/aws-stockholm-eu-north-1-sweden.html","megawatts":150,"companies":["Amazon Web Services"],"country":"Sweden","region":"Stockholm","city":"Stockholm","status":"operational","energy_type":"Renewable (100% — Nordic hydropower)","ai_focus":"General Cloud + AI Inference (Bedrock, SageMaker EU-North workloads)","start_year":2018,"lat":59.334,"lng":18.063,"sources":["https://aws.amazon.com/about-aws/global-infrastructure/regions_az/?nc2=type_a","https://sustainability.aboutamazon.com/products-services/the-cloud"]},{"id":"coreweave-uk-ai-data-centers","title":"CoreWeave UK AI Data Centers (London & Manchester)","url":"https://aidatacenterindex.com/datacenters/coreweave-uk-ai-data-centers.html","megawatts":150,"companies":["CoreWeave"],"country":"United Kingdom","region":"Greater London and Manchester","city":"London","status":"operational","energy_type":"Grid (National Grid) with renewable agreements","ai_focus":"Inference and Training (GPU cloud for AI workloads)","start_year":2024,"lat":51.5074,"lng":-0.1278,"sources":["https://www.coreweave.com/news/coreweave-expands-to-europe"]},{"id":"hetzner-falkenstein-ai-data-center","title":"Hetzner — Falkenstein Data Center Park","url":"https://aidatacenterindex.com/datacenters/hetzner-falkenstein-ai-data-center.html","megawatts":150,"companies":["Hetzner Online GmbH"],"country":"Germany","region":"Saxony","city":"Falkenstein/Vogtland","status":"operational","energy_type":"Renewable","ai_focus":"Training and Inference","start_year":null,"lat":50.476,"lng":12.373,"sources":["https://www.hetzner.com/news/03-26-price-adjustment/"]},{"id":"lambda-labs-ai-cloud-us","title":"Lambda Labs — AI Cloud GPU Clusters (US)","url":"https://aidatacenterindex.com/datacenters/lambda-labs-ai-cloud-us.html","megawatts":150,"companies":["Lambda Labs"],"country":"United States","region":"Multi-site (Texas, Washington, Montana)","city":"Austin","status":"operational","energy_type":"Mixed","ai_focus":"Training, Inference (GPU cloud for AI researchers)","start_year":2022,"lat":30.2672,"lng":-97.7431,"sources":["https://lambdalabs.com/service/gpu-cloud","https://www.datacenterdynamics.com/en/news/lambda-ai-cloud-expansion/"]},{"id":"yandex-cloud-ai-data-centers-russia","title":"Yandex Cloud — AI Training Data Centers","url":"https://aidatacenterindex.com/datacenters/yandex-cloud-ai-data-centers-russia.html","megawatts":150,"companies":["Yandex"],"country":"Russia","region":"Moscow Oblast","city":"Mäntyselkä (Moscow region)","status":"operational","energy_type":"Mixed","ai_focus":"Training (YandexGPT, Alice AI assistant), Inference","start_year":2020,"lat":55.7558,"lng":37.6176,"sources":["https://cloud.yandex.com/","https://ya.ru/ai"]},{"id":"viettel-tan-phu-trung-ai-data-center-vietnam","title":"Viettel — Tan Phu Trung AI Data Center","url":"https://aidatacenterindex.com/datacenters/viettel-tan-phu-trung-ai-data-center-vietnam.html","megawatts":140,"companies":["Viettel Group"],"country":"Vietnam","region":"Ho Chi Minh City","city":"Ho Chi Minh City","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":10.912,"lng":106.529,"sources":["https://www.vir.com.vn/viettel-to-build-140mw-data-center-in-tan-phu-trung-industrial-park-110432.html"]},{"id":"apple-prineville-oregon-data-center","title":"Apple — Prineville, Oregon Data Center","url":"https://aidatacenterindex.com/datacenters/apple-prineville-oregon-data-center.html","megawatts":120,"companies":["Apple"],"country":"United States","region":"Oregon","city":"Prineville","status":"operational","energy_type":"Renewable","ai_focus":"Inference (Apple Intelligence, iCloud, Siri AI)","start_year":2012,"lat":44.302,"lng":-120.835,"sources":["https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2024.pdf","https://www.bizjournals.com/portland/news/2023/10/apple-data-center-prineville-oregon.html"]},{"id":"google-sydney-australia-ai-data-center","title":"Google — Sydney AI Data Center (Australia-Southeast1)","url":"https://aidatacenterindex.com/datacenters/google-sydney-australia-ai-data-center.html","megawatts":120,"companies":["Google"],"country":"Australia","region":"New South Wales","city":"Sydney","status":"operational","energy_type":"Renewable (100% via Australian LGCs and wind PPAs)","ai_focus":"Inference (Google Cloud Australia, Search ANZ, Vertex AI ANZ)","start_year":2017,"lat":-33.862,"lng":151.204,"sources":["https://cloud.google.com/about/locations/sydney","https://blog.google/around-the-globe/google-asia/google-cloud-australia/"]},{"id":"oracle-ais-cloud-thailand-sovereign-region","title":"Oracle — AIS Cloud (Thailand) Sovereign Region","url":"https://aidatacenterindex.com/datacenters/oracle-ais-cloud-thailand-sovereign-region.html","megawatts":120,"companies":["Oracle","AIS (Advanced Info Service)"],"country":"Thailand","region":"Bangkok","city":"Bangkok","status":"operational","energy_type":"Mixed","ai_focus":"Sovereign AI and Cloud Services","start_year":2025,"lat":13.7563,"lng":100.5018,"sources":["https://www.oracle.com/news/announcement/ais-oracle-sovereign-cloud-thailand-2025-07-15/","https://www.nationthailand.com/business/tech/40040777"]},{"id":"aws-hong-kong-cloud-region-ai-expansion","title":"AWS — Hong Kong Cloud Region (AI Expansion)","url":"https://aidatacenterindex.com/datacenters/aws-hong-kong-cloud-region-ai-expansion.html","megawatts":100,"companies":["Amazon Web Services"],"country":"Hong Kong","region":"Hong Kong","city":"Hong Kong","status":"operational","energy_type":"Mixed (Grid with recycled water cooling)","ai_focus":"Inference and Training (Trainium, Inferentia, GB200)","start_year":2019,"lat":22.3193,"lng":114.1694,"sources":["https://aws.amazon.com/about-aws/whats-new/2025/05/aws-cyberport-launch-joint-innovation-center-hong-kong/","https://www.scmp.com/tech/big-tech/article/3290136/aws-ramps-up-ai-focused-investments-hong-kong/"]},{"id":"aws-new-zealand-cloud-region","title":"AWS — Asia Pacific (New Zealand) Region","url":"https://aidatacenterindex.com/datacenters/aws-new-zealand-cloud-region.html","megawatts":100,"companies":["Amazon Web Services"],"country":"New Zealand","region":"Auckland","city":"Auckland","status":"operational","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":-36.848,"lng":174.763,"sources":["https://aws.amazon.com/about-aws/global-infrastructure/new-zealand/"]},{"id":"crusoe-energy-ai-cloud-colorado","title":"Crusoe Energy — AI Cloud Data Centers (US)","url":"https://aidatacenterindex.com/datacenters/crusoe-energy-ai-cloud-colorado.html","megawatts":100,"companies":["Crusoe Energy Systems"],"country":"United States","region":"Colorado","city":"Denver","status":"operational","energy_type":"Mixed (stranded gas conversion)","ai_focus":"Training, Inference (GPU cloud, sustainable AI compute)","start_year":2018,"lat":39.733,"lng":-104.984,"sources":["https://www.crusoeenergy.com/","https://techcrunch.com/2023/10/20/crusoe-energy-systems-gpu-cloud/","https://www.cnbc.com/2024/01/10/crusoe-energy-to-provide-ai-cloud-computing-powered-by-oil-field-gas.html"]},{"id":"firebird-ai-data-center-armenia","title":"Firebird AI Data Center (Armenia)","url":"https://aidatacenterindex.com/datacenters/firebird-ai-data-center-armenia.html","megawatts":100,"companies":["Firebird","Government of Armenia"],"country":"Armenia","region":"Yerevan (planned)","city":"Yerevan","status":"announced","energy_type":"Grid (public–private partnership)","ai_focus":"Training & Research (sovereign AI hub)","start_year":2026,"lat":40.1814,"lng":44.5144,"sources":["https://www.datacenterdynamics.com/en/news/firebird-plans-100mw-ai-data-center-in-armenia-backed-by-government/"]},{"id":"google-chonburi-thailand-ai-data-center","title":"Google — Chonburi (Thailand) AI Data Center","url":"https://aidatacenterindex.com/datacenters/google-chonburi-thailand-ai-data-center.html","megawatts":100,"companies":["Google"],"country":"Thailand","region":"Chonburi Province","city":"Chonburi","status":"planned","energy_type":"Mixed (Grid with renewable targets)","ai_focus":"Inference and Training (TPU clusters)","start_year":2024,"lat":13.3611,"lng":100.9847,"sources":["https://blog.google/around-the-globe/google-asia/google-investment-thailand/","https://developingtelecoms.com/telecom-technology/data-centres-networks/17498-google-to-invest-us-1bn-in-thailand-data-centre-and-cloud-region.html"]},{"id":"google-milan-italy-ai-data-center","title":"Google — Milan AI Data Center (Europe-West8)","url":"https://aidatacenterindex.com/datacenters/google-milan-italy-ai-data-center.html","megawatts":100,"companies":["Google"],"country":"Italy","region":"Lombardy","city":"Milan","status":"operational","energy_type":"Renewable (100% via Italian renewable PPAs)","ai_focus":"Inference (Google Cloud Italy, AI API endpoints for Southern Europe)","start_year":2022,"lat":45.464,"lng":9.19,"sources":["https://cloud.google.com/about/locations/milan","https://blog.google/around-the-globe/google-europe/google-cloud-region-milan-italy/"]},{"id":"khazna-ankara-baskent-ai-data-center","title":"Khazna Ankara — Başkent AI Data Center","url":"https://aidatacenterindex.com/datacenters/khazna-ankara-baskent-ai-data-center.html","megawatts":100,"companies":["Khazna Data Centers (G42)"],"country":"Turkey","region":"Ankara","city":"Ankara","status":"planned","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":39.933,"lng":32.859,"sources":["https://www.developingtelecoms.com/khazna-to-build-100mw-ai-ready-facility-in-ankara"]},{"id":"khazna-qaj1-ajman-ai-data-center","title":"Khazna QAJ1 — Ajman AI Data Center","url":"https://aidatacenterindex.com/datacenters/khazna-qaj1-ajman-ai-data-center.html","megawatts":100,"companies":["Khazna Data Centers"],"country":"United Arab Emirates","region":"Ajman","city":"Ajman","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":25.411,"lng":55.435,"sources":["https://khaznadatacenters.com/press-release/khazna-announces-the-uaes-first-ai-optimized-data-center-and-the-largest-in-its-portfolio-powering-the-nations-drive-toward-ai-leadership/","https://khaznadatacenters.com/ar/press-release/khazna-expands-infrastructure-to-accelerate-uaes-leadership-in-artificial-intelligence/","https://uptimeinstitute.com/about-ui/press-releases/khazna-awarded-uptime-tier-iii-certification-of-design-documents-for-ajman-uae-facility"]},{"id":"microsoft-thailand-eec-ai-data-center","title":"Microsoft — Thailand AI Data Center","url":"https://aidatacenterindex.com/datacenters/microsoft-thailand-eec-ai-data-center.html","megawatts":100,"companies":["Microsoft"],"country":"Thailand","region":"Eastern Economic Corridor (EEC)","city":"Chonburi","status":"planned","energy_type":"Mixed","ai_focus":"Inference and Cloud Workloads","start_year":2024,"lat":13.3611,"lng":100.9847,"sources":["https://news.microsoft.com/en-th/2024/05/01/microsoft-announces-first-datacenter-region-and-new-ai-skilling-opportunities-in-thailand/"]},{"id":"naver-spring-cloud-ai-data-center-south-korea","title":"NAVER — Spring Cloud AI Data Center","url":"https://aidatacenterindex.com/datacenters/naver-spring-cloud-ai-data-center-south-korea.html","megawatts":100,"companies":["Naver"],"country":"South Korea","region":"Gangwon","city":"Chuncheon","status":"operational","energy_type":"Mixed","ai_focus":"Training (HyperCLOVA X LLMs), Inference","start_year":2013,"lat":37.8813,"lng":127.7298,"sources":["https://www.navercorp.com/technology/tech-cloud","https://en.yna.co.kr/view/AEN20231201000600320"]},{"id":"nebius-ai-cloud-finland-data-center","title":"NEBIUS AI Cloud — Mäntsälä Finland Data Center","url":"https://aidatacenterindex.com/datacenters/nebius-ai-cloud-finland-data-center.html","megawatts":100,"companies":["Nebius","Yandex N.V."],"country":"Finland","region":"Uusimaa","city":"Mäntsälä","status":"operational","energy_type":"Renewable","ai_focus":"Training, Inference (GPU cloud for AI startups and enterprises)","start_year":2023,"lat":60.635,"lng":25.3171,"sources":["https://nebius.com/","https://www.datacenterdynamics.com/en/news/yandex-nebius-finland-data-center/"]},{"id":"oracle-japan-ai-cloud-region","title":"Oracle Cloud — Japan East AI Region (Tokyo)","url":"https://aidatacenterindex.com/datacenters/oracle-japan-ai-cloud-region.html","megawatts":100,"companies":["Oracle"],"country":"Japan","region":"Kanto","city":"Tokyo","status":"operational","energy_type":"Mixed","ai_focus":"Training, Inference (OCI GPU clusters, enterprise AI)","start_year":2019,"lat":35.6762,"lng":139.6503,"sources":["https://www.oracle.com/cloud/public-cloud-regions/","https://www.oracle.com/news/announcement/oracle-opens-new-cloud-region-in-japan-2024-08-29/"]},{"id":"qai-brookfield-qatar-ai-compute-center","title":"Qai & Brookfield — Qatar AI Compute Center","url":"https://aidatacenterindex.com/datacenters/qai-brookfield-qatar-ai-compute-center.html","megawatts":100,"companies":["Qai (QIA) & Brookfield Asset Management"],"country":"Qatar","region":"Doha","city":"Doha","status":"planned","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":25.285,"lng":51.531,"sources":["https://www.gccbusinesswatch.com/qai-brookfield-20bn-joint-venture-ai-infrastructure"]},{"id":"atnorth-ice02-ai-data-center-iceland","title":"atNorth ICE02 AI Data Center","url":"https://aidatacenterindex.com/datacenters/atnorth-ice02-ai-data-center-iceland.html","megawatts":80,"companies":["atNorth","Crusoe","Opera"],"country":"Iceland","region":"Southern Peninsula","city":"Keflavík","status":"operational","energy_type":"Hydro & Geothermal (100% renewable)","ai_focus":"AI Cloud & HPC Colocation","start_year":2019,"lat":63.999,"lng":-22.558,"sources":["https://atnorth.com/locations/iceland/ice02/","https://www.datacenterdynamics.com/en/news/crusoe-builds-24mw-expansion-at-atnorth-ice02-campus/","https://blogs.opera.com/news/2024/02/opera-nvidia-dgx-superpod-iceland/"]},{"id":"deepmind-google-london-ai-research-cluster-uk","title":"Google DeepMind — London AI Research Cluster","url":"https://aidatacenterindex.com/datacenters/deepmind-google-london-ai-research-cluster-uk.html","megawatts":80,"companies":["Google"],"country":"United Kingdom","region":"London","city":"London","status":"operational","energy_type":"Mixed","ai_focus":"Research (Gemini, AlphaFold, AlphaStar training)","start_year":2020,"lat":51.5338,"lng":-0.1289,"sources":["https://deepmind.google/","https://www.datacenterdynamics.com/en/news/google-deepmind-london/"]},{"id":"microsoft-south-africa-ai-region","title":"Microsoft Azure — South Africa AI Region","url":"https://aidatacenterindex.com/datacenters/microsoft-south-africa-ai-region.html","megawatts":80,"companies":["Microsoft"],"country":"South Africa","region":"Gauteng","city":"Johannesburg","status":"operational","energy_type":"Mixed","ai_focus":"General Cloud + AI Inference (Sub-Saharan Africa)","start_year":2019,"lat":-26.2041,"lng":28.0473,"sources":["https://azure.microsoft.com/en-us/global-infrastructure/geographies/#geographies","https://news.microsoft.com/africa/2024/"]},{"id":"nebius-mega-or-israel-ai-hub","title":"Nebius & Mega Or — Israel AI Hub","url":"https://aidatacenterindex.com/datacenters/nebius-mega-or-israel-ai-hub.html","megawatts":80,"companies":["Nebius & Mega Or"],"country":"Israel","region":"Central District","city":"Beit Shemesh","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":31.747,"lng":34.988,"sources":["https://thetechcapital.com/nebius-mega-or-to-build-80mw-ai-data-center-in-israel"]},{"id":"tencent-cloud-ai-data-center-southeast-asia","title":"Tencent Cloud — Southeast Asia AI Region (Singapore)","url":"https://aidatacenterindex.com/datacenters/tencent-cloud-ai-data-center-southeast-asia.html","megawatts":80,"companies":["Tencent"],"country":"Singapore","region":"Singapore","city":"Singapore","status":"operational","energy_type":"Grid","ai_focus":"Training, Inference (Tencent AI, Hunyuan LLM)","start_year":2014,"lat":1.34,"lng":103.87,"sources":["https://intl.cloud.tencent.com/document/product/213/6091","https://www.techinasia.com/tencent-cloud-expands-singapore-data-center"]},{"id":"aws-south-africa-cape-town-region","title":"AWS — Cape Town Africa Region","url":"https://aidatacenterindex.com/datacenters/aws-south-africa-cape-town-region.html","megawatts":60,"companies":["Amazon Web Services"],"country":"South Africa","region":"Western Cape","city":"Cape Town","status":"operational","energy_type":"Mixed","ai_focus":"General Cloud + AI Inference","start_year":2020,"lat":-33.9249,"lng":18.4241,"sources":["https://aws.amazon.com/local/south-africa/","https://www.datacenterdynamics.com/en/news/aws-africa-cape-town-region/"]},{"id":"google-cloud-africa-johannesburg-region","title":"Google Cloud — Johannesburg Africa Region","url":"https://aidatacenterindex.com/datacenters/google-cloud-africa-johannesburg-region.html","megawatts":60,"companies":["Google"],"country":"South Africa","region":"Gauteng","city":"Johannesburg","status":"operational","energy_type":"Mixed","ai_focus":"General Cloud + AI Inference","start_year":2024,"lat":-26.2041,"lng":28.0473,"sources":["https://cloud.google.com/about/locations/johannesburg","https://blog.google/around-the-globe/google-africa/google-cloud-africa/"]},{"id":"aws-taipei-ai-region-taiwan","title":"AWS — Taipei AI Region","url":"https://aidatacenterindex.com/datacenters/aws-taipei-ai-region-taiwan.html","megawatts":50,"companies":["Amazon Web Services"],"country":"Taiwan","region":"Taipei","city":"Taipei","status":"operational","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":25.038,"lng":121.564,"sources":["https://w.media/aws-launches-taiwan-region-pledges-5b-investment/"]},{"id":"cyberport-ai-supercomputing-centre-hong-kong","title":"Cyberport AI Supercomputing Centre (AISC) — Hong Kong","url":"https://aidatacenterindex.com/datacenters/cyberport-ai-supercomputing-centre-hong-kong.html","megawatts":50,"companies":["Cyberport","HKSAR Government","NVIDIA (Hardware partner)"],"country":"Hong Kong","region":"Hong Kong Island","city":"Cyberport","status":"operational","energy_type":"Grid","ai_focus":"National AI R&D and Startup Hub","start_year":2024,"lat":22.2611,"lng":114.1297,"sources":["https://www.cyberport.hk/en/about_cyberport/cyberport_partners/ai_supercomputing_centre","https://www.scmp.com/tech/big-tech/article/3290136/hong-kongs-first-ai-supercomputing-centre-cyberport-begins-operating"]},{"id":"microsoft-argentina-ai-cloud-region","title":"Microsoft — Argentina AI Cloud Region","url":"https://aidatacenterindex.com/datacenters/microsoft-argentina-ai-cloud-region.html","megawatts":50,"companies":["Microsoft"],"country":"Argentina","region":"Buenos Aires","city":"Buenos Aires","status":"planned","energy_type":"Mixed","ai_focus":"General Cloud + AI Inference (South American market)","start_year":2025,"lat":-34.6037,"lng":-58.3816,"sources":["https://news.microsoft.com/es-xl/2024/07/11/microsoft-to-expand-its-ai-infrastructure-in-argentina/"]},{"id":"microsoft-chile-central-ai-infrastructure","title":"Microsoft — Chile Central AI Infrastructure","url":"https://aidatacenterindex.com/datacenters/microsoft-chile-central-ai-infrastructure.html","megawatts":50,"companies":["Microsoft"],"country":"Chile","region":"Santiago Metropolitan Region","city":"Santiago","status":"operational","energy_type":"Renewable (Solar and Wind)","ai_focus":"Inference and Sovereign AI Data Residency","start_year":2025,"lat":-33.3644,"lng":-70.7303,"sources":["https://news.microsoft.com/en-xm/2025/06/12/microsoft-launches-its-first-cloud-region-in-chile-chile-central-accelerating-ai-innovation-and-digital-transformation/"]},{"id":"aws-peru-ai-cloud-region","title":"AWS — Peru Cloud Region (Announced)","url":"https://aidatacenterindex.com/datacenters/aws-peru-ai-cloud-region.html","megawatts":40,"companies":["Amazon Web Services"],"country":"Peru","region":"Lima","city":"Lima","status":"announced","energy_type":"Mixed","ai_focus":"General Cloud + AI Inference (Andean market)","start_year":2026,"lat":-12.0464,"lng":-77.0428,"sources":["https://aws.amazon.com/about-aws/whats-new/2024/07/aws-announces-new-south-america-region-peru/"]},{"id":"google-cloud-colombia-ai-region","title":"Google Cloud — Colombia AI Region","url":"https://aidatacenterindex.com/datacenters/google-cloud-colombia-ai-region.html","megawatts":40,"companies":["Google"],"country":"Colombia","region":"Cundinamarca","city":"Bogotá","status":"operational","energy_type":"Mixed","ai_focus":"General Cloud + AI Inference (Andean region)","start_year":2023,"lat":4.711,"lng":-74.0721,"sources":["https://cloud.google.com/about/locations/bogota","https://blog.google/around-the-globe/google-latin-america/google-cloud-colombia/"]},{"id":"microsoft-vietnam-ai-cloud-region","title":"Microsoft — Vietnam AI Cloud Region","url":"https://aidatacenterindex.com/datacenters/microsoft-vietnam-ai-cloud-region.html","megawatts":40,"companies":["Microsoft"],"country":"Vietnam","region":"Hanoi / Ho Chi Minh City","city":"Hanoi","status":"planned","energy_type":"Mixed","ai_focus":"General Cloud + AI Inference","start_year":2025,"lat":21.0278,"lng":105.8342,"sources":["https://news.microsoft.com/apac/2024/02/microsoft-investment-vietnam/","https://techcrunch.com/2024/02/microsoft-vietnam-1-billion/"]},{"id":"nvidia-ai-factory-finland-helsinki","title":"NVIDIA AI Factory — Helsinki, Finland","url":"https://aidatacenterindex.com/datacenters/nvidia-ai-factory-finland-helsinki.html","megawatts":40,"companies":["NVIDIA","CSC (Finnish IT Center for Science)"],"country":"Finland","region":"Uusimaa","city":"Helsinki","status":"under_construction","energy_type":"Hydroelectric (100% renewable)","ai_focus":"Sovereign AI, Nordic AI research, government AI","start_year":null,"lat":60.1699,"lng":24.9384,"sources":["https://nvidianews.nvidia.com/news/nvidia-ai-factory-finland","https://www.csc.fi/en/web/csc/nvidia-ai-factory-finland"]},{"id":"yandex-vladimir-ai-data-center-russia","title":"Yandex — Vladimir AI Data Center","url":"https://aidatacenterindex.com/datacenters/yandex-vladimir-ai-data-center-russia.html","megawatts":40,"companies":["Yandex"],"country":"Russia","region":"Vladimir Oblast","city":"Vladimir","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":56.129,"lng":40.407,"sources":["https://www.mordorintelligence.com/industry-reports/russia-data-center-market"]},{"id":"cerebras-systems-ai-wafer-cluster-us","title":"Cerebras Systems — Condor Galaxy AI Supercomputer","url":"https://aidatacenterindex.com/datacenters/cerebras-systems-ai-wafer-cluster-us.html","megawatts":30,"companies":["Cerebras Systems","G42"],"country":"United States","region":"Texas","city":"Dallas","status":"operational","energy_type":"Mixed","ai_focus":"Training (large language models, scientific AI)","start_year":2023,"lat":32.7767,"lng":-96.797,"sources":["https://cerebras.net/product/condor-galaxy/","https://www.businesswire.com/news/home/20230821870613/en/Cerebras-and-G42-Launch-Condor-Galaxy-1"]},{"id":"ooredoo-syntys-ai-cloud-data-center-qatar","title":"Ooredoo/Syn‌tys AI Cloud Data Center (Qatar)","url":"https://aidatacenterindex.com/datacenters/ooredoo-syntys-ai-cloud-data-center-qatar.html","megawatts":30,"companies":["Ooredoo","Syn‌tys","NVIDIA"],"country":"Qatar","region":"Doha","city":"Doha","status":"operational","energy_type":"Grid (Qatar General Electricity & Water)","ai_focus":"Training & Inference (sovereign AI cloud)","start_year":2024,"lat":25.2854,"lng":51.531,"sources":["https://www.datacenterdynamics.com/en/news/ooredoo-launches-ai-cloud-in-qatar-with-nvidia-hopper-gpus/","https://www.aibusiness.com/topics/cloud/qatar-launches-first-sovereign-ai-cloud-with-ooredoo"]},{"id":"nebius-megaor-national-ai-data-center-israel","title":"Nebius–Mega Or National AI Data Center (Israel)","url":"https://aidatacenterindex.com/datacenters/nebius-megaor-national-ai-data-center-israel.html","megawatts":25,"companies":["Nebius","Mega Or"],"country":"Israel","region":"Modi'in","city":"Modi'in","status":"under_construction","energy_type":"Grid (Israel Electric Corporation)","ai_focus":"Training & HPC (national AI infrastructure)","start_year":2025,"lat":31.898,"lng":35.0104,"sources":["https://www.datacenterdynamics.com/en/news/nebius-to-build-140m-israeli-national-ai-supercomputer/","https://www.jpost.com/business-and-innovation/tech-and-start-ups/article-803123"]},{"id":"aleph-alpha-ai-data-center-germany","title":"Aleph Alpha — AI Sovereign Cloud (Germany)","url":"https://aidatacenterindex.com/datacenters/aleph-alpha-ai-data-center-germany.html","megawatts":20,"companies":["Aleph Alpha","Hewlett Packard Enterprise"],"country":"Germany","region":"Baden-Württemberg","city":"Heidelberg","status":"operational","energy_type":"Renewable","ai_focus":"Training (Luminous LLMs), Sovereign AI","start_year":2022,"lat":49.3988,"lng":8.6724,"sources":["https://aleph-alpha.com/","https://www.datacenterdynamics.com/en/news/aleph-alpha-ai-germany/"]},{"id":"digitalocean-amsterdam-ai-hub","title":"DigitalOcean — Amsterdam AI Hub (AMS1/AMS3)","url":"https://aidatacenterindex.com/datacenters/digitalocean-amsterdam-ai-hub.html","megawatts":20,"companies":["DigitalOcean"],"country":"Netherlands","region":"North Holland","city":"Amsterdam","status":"operational","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":52.367,"lng":4.904,"sources":["https://www.digitalocean.com/blog/introducing-h100-gpu-droplets/"]},{"id":"uk-ai-research-resource-airr-edinburgh","title":"UK AI Research Resource (AIRR) — Isambard-AI & Dawn Supercomputers","url":"https://aidatacenterindex.com/datacenters/uk-ai-research-resource-airr-edinburgh.html","megawatts":20,"companies":["UK Research and Innovation (UKRI)","University of Bristol","University of Cambridge"],"country":"United Kingdom","region":"England","city":"Bristol / Cambridge","status":"operational","energy_type":"Mixed","ai_focus":"Training, Research (academic AI, national AI capability)","start_year":2023,"lat":51.457,"lng":-2.597,"sources":["https://www.ukri.org/what-we-do/creating-world-class-research-and-innovation-infrastructure/digital-research-infrastructure/ai-research-resource/","https://gw4.ac.uk/isambard-ai/","https://www.cam.ac.uk/research/news/dawn-ai-supercomputer-dawn"]},{"id":"sds-open-access-ai-supercomputer-israel","title":"SDS “Open-Access” AI Supercomputer (Israel)","url":"https://aidatacenterindex.com/datacenters/sds-open-access-ai-supercomputer-israel.html","megawatts":18,"companies":["SDS (Shonfeld Data Services)","VAST Data","NVIDIA"],"country":"Israel","region":"Petah Tikva","city":"Petah Tikva","status":"operational","energy_type":"Grid (Israel Electric Corporation)","ai_focus":"Training & Research (open access)","start_year":2024,"lat":32.0871,"lng":34.8874,"sources":["https://www.calcalistech.com/ctechnews/article/skmvt06bsl","https://www.calcalistech.com/ctechnews/article/h1knymoub"]},{"id":"equinix-sp7-sao-paulo-brazil","title":"Equinix SP7 São Paulo (Brazil)","url":"https://aidatacenterindex.com/datacenters/equinix-sp7-sao-paulo-brazil.html","megawatts":14,"companies":["Equinix"],"country":"Brazil","region":"São Paulo","city":"São Paulo","status":"planned","energy_type":"Renewable (Utility PPA)","ai_focus":"Hyperscale Training and AI Cloud","start_year":2026,"lat":-23.55,"lng":-46.633,"sources":["https://www.equinix.com/newsroom/press-releases/2026/02/equinix-brazil-sp7-data-center-expansion"]},{"id":"oman-data-park-ai-infrastructure","title":"Oman Data Park AI Infrastructure","url":"https://aidatacenterindex.com/datacenters/oman-data-park-ai-infrastructure.html","megawatts":10,"companies":["Oman Data Park","Omantel","NVIDIA"],"country":"Oman","region":"Muscat","city":"Muscat","status":"operational","energy_type":"Grid (Oman Electricity Transmission Company)","ai_focus":"Training & Inference (managed cloud GPUs)","start_year":2024,"lat":23.588,"lng":58.3829,"sources":["https://www.omandatapark.com/press-release/odp-integrates-nvidia-h200-gpus-into-its-ai-platform/","https://www.zawya.com/en/press-release/companies-news/oman-data-park-revolutionises-ai-infrastructure-with-nvidia-h200-gpu- deployment-y6dn0fej"]},{"id":"airawat-ai-supercomputer-india","title":"AIRAWAT AI Supercomputer (India)","url":"https://aidatacenterindex.com/datacenters/airawat-ai-supercomputer-india.html","megawatts":null,"companies":["Centre for Development of Advanced Computing (C-DAC)","Ministry of Electronics and Information Technology, Government of India"],"country":"India","region":"Pune, Maharashtra","city":"Pune","status":"operational","energy_type":"Grid (high-efficiency HPC facility)","ai_focus":"National AI research platform","start_year":2023,"lat":18.551,"lng":73.807,"sources":["https://www.cdac.in/index.aspx?id=pk_itn_spot1332","https://www.digitalindia.gov.in/initiative/poc-for-ai-research-analytics-and-knowledge-dissemination-platform-airawat/","https://top500.org/system/180134/","https://www.cdac.in/index.aspx?id=hpc_sa_bio_contactus"]},{"id":"aist-abci-3-ai-supercomputer-japan","title":"AIST ABCI-3 Supercomputer (Japan)","url":"https://aidatacenterindex.com/datacenters/aist-abci-3-ai-supercomputer-japan.html","megawatts":null,"companies":["National Institute of Advanced Industrial Science and Technology (AIST)","Hewlett Packard Enterprise","NVIDIA"],"country":"Japan","region":"Kashiwa, Chiba","city":"Kashiwa","status":"operational","energy_type":"Grid (liquid cooling and efficiency features)","ai_focus":"National AI supercomputing (cloud service)","start_year":2025,"lat":35.8622,"lng":139.977,"sources":["https://www.hpe.com/us/en/newsroom/press-release/2024/07/hewlett-packard-enterprise-to-deliver-aists-next-generation-supercomputer-powered-by-nvidia-for-generative-ai.html","https://abci.ai/en/about_abci/","https://abci.ai/en/about_abci/computing_resource.html","https://www.aist.go.jp/kashiwa/en/access/","https://top500.org/system/180390/"]},{"id":"aws-mississippi-ai-data-center","title":"AWS Madison County Mississippi Data Center Complexes","url":"https://aidatacenterindex.com/datacenters/aws-mississippi-ai-data-center.html","megawatts":null,"companies":["Amazon Web Services"],"country":"United States","region":"Madison County, Mississippi","city":"","status":"Canton operating and Ridgeland in early construction as of June 2026; combined Madison County AWS data-center complexes still developing","energy_type":"AWS renewable matching and Entergy grid infrastructure; selected 1.3 GW energy-project capacity removed from data-center capacity","ai_focus":"Cloud computing, training, and inference infrastructure","start_year":2024,"lat":null,"lng":null,"sources":["https://www.aboutamazon.com/news/aws/aws-10-billion-investment-mississippi","https://www.aboutamazon.com/news/aws/aws-training-programs-sustainability-projects-mississippi","https://mississippi.org/news/amazon-web-services-to-invest-record-shattering-10-billion/","https://mississippitoday.org/2026/06/09/amazon-data-centers-mississippi/","https://www.entergy.com/blog/amazon-expands-and-entergy-mississippi-stands-ready-to-deliver-benefits-for-all-our-customers"]},{"id":"aws-richmond-county-north-carolina-ai-campus","title":"AWS Richmond County AI and Cloud Infrastructure Campus","url":"https://aidatacenterindex.com/datacenters/aws-richmond-county-north-carolina-ai-campus.html","megawatts":null,"companies":["Amazon Web Services"],"country":"United States","region":"Richmond County, North Carolina","city":"","status":"under construction; October 2025 groundbreaking reported","energy_type":"Facility-level power source or procurement not disclosed","ai_focus":"AWS AI and cloud computing infrastructure","start_year":2025,"lat":null,"lng":null,"sources":["https://www.aboutamazon.com/news/aws/aws-investment-north-carolina-ai-cloud-infrastructure","https://governor.nc.gov/news/press-releases/2025/06/04/governor-stein-announces-amazon-plans-invest-10-billion-north-carolina-ai-infrastructure","https://www.richmondnc.com/m/newsflash/Home/Detail/168","https://www.datacenterdynamics.com/en/news/amazon-breaks-ground-on-10bn-data-center-complex-in-richmond-county-north-carolina/"]},{"id":"cassava-ai-data-center-south-africa","title":"Cassava AI Data Center (South Africa)","url":"https://aidatacenterindex.com/datacenters/cassava-ai-data-center-south-africa.html","megawatts":null,"companies":["Cassava Technologies","Africa Data Centres","NVIDIA"],"country":"South Africa","region":"Southern Africa","city":"Johannesburg","status":"under_construction","energy_type":"Grid (with renewable mix)","ai_focus":"AI training & inference \"factory\"","start_year":2025,"lat":-26.2041,"lng":28.0473,"sources":["https://www.datacenterdynamics.com/en/news/cassava-technologies-brings-nvidia-powered-ai-supercomputer-to-south-africa/","https://www.techinafrica.com/nvidia-partners-with-cassava-to-build-ai-ready-data-centres-across-africa/"]},{"id":"coreweave-ai-data-centers-us","title":"CoreWeave AI Data Center Portfolio (US)","url":"https://aidatacenterindex.com/datacenters/coreweave-ai-data-centers-us.html","megawatts":null,"companies":["CoreWeave","NVIDIA"],"country":"United States","region":"United States AI cloud portfolio; public portfolio scale reported globally","city":"","status":"operational portfolio","energy_type":"Energy procurement not disclosed at facility level","ai_focus":"GPU cloud infrastructure for AI training and inference","start_year":null,"lat":null,"lng":null,"sources":["https://www.coreweave.com/ai-data-centers","https://www.coreweave.com/blog/coreweave-2025-annual-report-shareholder-letter"]},{"id":"google-fort-wayne-indiana-ai-campus","title":"Google Fort Wayne Data Center Campus","url":"https://aidatacenterindex.com/datacenters/google-fort-wayne-indiana-ai-campus.html","megawatts":null,"companies":["Google"],"country":"United States","region":"Indiana","city":"Fort Wayne","status":"reported operational in December 2025; expansion and site work continue","energy_type":"Clean-energy procurement and grid collaboration disclosed; emergency diesel backup expansion also disclosed","ai_focus":"Google AI innovation and Google Cloud services","start_year":2024,"lat":41.012,"lng":-85.068,"sources":["https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/google-data-centers-ai-skills-investments/","https://datacenters.google/locations/indiana/","https://www.iedc.in.gov/events/news/details/2024/04/26/gov.-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana","https://www.fortwaynedatacenter.com/","https://lightsourcebp.com/project/honeysuckle-solar/","https://www.insideindianabusiness.com/articles/google-data-center-operational-in-fort-wayne","https://www.in.gov/idem/files/48739-48840PN-JS.pdf","https://www.wboi.org/business/2026-04-14/idem-grants-google-data-center-developers-permits-for-additional-emergency-generators"]},{"id":"google-nebraska-mega-campus-private-gas-power","title":"Google Nebraska Reported Mega-Campus Proposal","url":"https://aidatacenterindex.com/datacenters/google-nebraska-mega-campus-private-gas-power.html","megawatts":null,"companies":["Google","Tenaska"],"country":"United States","region":"Nebraska","city":"","status":"publicly reported proposal; not operator-confirmed","energy_type":"Reported private combined-cycle natural gas plant with carbon capture","ai_focus":"Reported hyperscale AI/cloud data-center proposal","start_year":2026,"lat":null,"lng":null,"sources":["https://flatwaterfreepress.org/google-proposes-nebraska-data-center-requiring-more-power-than-all-of-lincoln/","https://grist.org/accountability/google-data-center-carbon-capture-nebraska/","https://governor.nebraska.gov/gov-pillen-senators-public-power-representatives-celebrate-new-energy-opportunities-through-lb-1261","https://www.bairdholm.com/blog/nebraska-legislature-approves-bills-regulating-energy-storage-resources-data-centers-and-other-large-energy-loads/","https://datacenters.google/locations/nebraska"]},{"id":"ibm-watson-ai-us-data-centers","title":"IBM watsonx AI Platform Infrastructure","url":"https://aidatacenterindex.com/datacenters/ibm-watson-ai-us-data-centers.html","megawatts":null,"companies":["IBM"],"country":"United States","region":"IBM watsonx / IBM Cloud U.S. platform scope","city":"","status":"operational IBM watsonx platform; facility scope not selected","energy_type":"Facility-level energy procurement not disclosed for selected watsonx platform scope","ai_focus":"Enterprise AI platform for training, tuning, deployment, inference, and governance; facility-specific workload class not selected","start_year":2023,"lat":null,"lng":null,"sources":["https://www.ibm.com/products/watsonx","https://www.ibm.com/products/watsonx-ai","https://newsroom.ibm.com/2023-05-09-IBM-Unveils-the-Watsonx-Platform-to-Power-Next-Generation-Foundation-Models-for-Business","https://www.ibm.com/solutions/cloud-data-centers","https://cloud.ibm.com/docs/overview?topic=overview-locations"]},{"id":"microsoft-azure-france-central-paris","title":"Microsoft Azure France Central Cloud Region","url":"https://aidatacenterindex.com/datacenters/microsoft-azure-france-central-paris.html","megawatts":null,"companies":["Microsoft"],"country":"France","region":"France Central / Paris cloud region","city":"","status":"operational cloud region","energy_type":"Unknown; no source-backed facility or regional power-procurement claim selected","ai_focus":"Azure cloud region supporting cloud and AI services; specific workload mix and facility capacity not disclosed","start_year":2018,"lat":null,"lng":null,"sources":["https://learn.microsoft.com/en-us/azure/reliability/regions-list","https://azure.microsoft.com/en-us/blog/microsoft-azure-preview-with-azure-availability-zones-now-open-in-france/","https://blogs.microsoft.com/blog/2018/03/14/microsoft-expands-cloud-services-in-europe-and-into-middle-east-to-meet-growing-customer-demand/"]},{"id":"microsoft-lordstown-ohio-stargate","title":"Stargate Lordstown Data Center (Ohio)","url":"https://aidatacenterindex.com/datacenters/microsoft-lordstown-ohio-stargate.html","megawatts":null,"companies":["SoftBank","OpenAI","Oracle"],"country":"United States","region":"Lordstown, Ohio","city":"Lordstown","status":"under construction / preparation work underway","energy_type":"Facility-level power source or procurement not disclosed","ai_focus":"Stargate high-performance AI compute; facility-specific workload split not disclosed","start_year":2025,"lat":41.171,"lng":-80.763,"sources":["https://openai.com/index/five-new-stargate-sites/","https://businessjournaldaily.com/preparation-work-begins-on-lordstown-data-center/"]},{"id":"microsoft-northern-virginia-ai-data-centers","title":"Microsoft Azure Virginia AI Data Centers","url":"https://aidatacenterindex.com/datacenters/microsoft-northern-virginia-ai-data-centers.html","megawatts":null,"companies":["Microsoft"],"country":"United States","region":"Virginia","city":"","status":"operational and under construction regional portfolio","energy_type":"Grid with Microsoft renewable-energy procurement commitments","ai_focus":"Azure cloud and AI infrastructure","start_year":null,"lat":null,"lng":null,"sources":["https://local.microsoft.com/communities/americas/northern-virginia/","https://local.microsoft.com/wp-content/uploads/2025/10/Microsoft-datacenters-in-Virginia.pdf","https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-loudoun-county/"]},{"id":"microsoft-openai-stargate-new-mexico","title":"Project Jupiter Dona Ana County AI Data Center","url":"https://aidatacenterindex.com/datacenters/microsoft-openai-stargate-new-mexico.html","megawatts":null,"companies":["Oracle","OpenAI","Stack Infrastructure","BorderPlex Digital Assets"],"country":"United States","region":"Dona Ana County, New Mexico","city":"","status":"under construction; April 2026 project update reports 1M+ hours worked","energy_type":"On-site Bloom Energy fuel-cell microgrid; fuel/feedstock not selected","ai_focus":"Oracle Cloud / OpenAI Stargate AI infrastructure; workload split not disclosed","start_year":2025,"lat":null,"lng":null,"sources":["https://openai.com/index/five-new-stargate-sites/","https://projectjupitertogether.com/","https://www.oracle.com/data-centers/dona-ana-county/","https://www.datacenterdynamics.com/en/news/oracle-revealed-as-tenant-of-project-jupiter-data-center-campus-in-new-mexico/"]},{"id":"neom-oxagon-ai-data-center-campus","title":"NEOM/DataVolt Oxagon AI Factory Campus Overlap","url":"https://aidatacenterindex.com/datacenters/neom-oxagon-ai-data-center-campus.html","megawatts":null,"companies":["NEOM","DataVolt"],"country":"Saudi Arabia","region":"Oxagon, NEOM","city":"Oxagon","status":"overlapping NEOM/DataVolt Oxagon AI factory campus record; selected MW tracked on canonical record","energy_type":"Overlapping NEOM/DataVolt Oxagon renewable-backed AI factory campus record","ai_focus":"AI factory / HPC campus","start_year":2025,"lat":null,"lng":null,"sources":["https://www.neom.com/en-us/newsroom/datavolt-signs-agreement-with-neom","https://www.datacenterdynamics.com/en/news/datavolt-plans-15gw-data-center-campus-in-neoms-oxagon/"]},{"id":"nscc-aspire2a-supercomputer-singapore","title":"NSCC ASPIRE-2A Supercomputer (Singapore)","url":"https://aidatacenterindex.com/datacenters/nscc-aspire2a-supercomputer-singapore.html","megawatts":null,"companies":["National Supercomputing Centre (NSCC) Singapore","National Research Foundation Singapore"],"country":"Singapore","region":"Singapore","city":"Singapore","status":"operational","energy_type":"Grid (high-efficiency cooling)","ai_focus":"National AI and HPC services","start_year":2022,"lat":1.295,"lng":103.773,"sources":["https://www.nscc.sg/aspire-2a/","https://www.nscc.sg/aspire-2a-plus/","https://www.pmo.gov.sg/newsroom/dpm-heng-swee-keat-at-the-launch-of-the-national-supercomputing-centre-singapore/","https://top500.org/site/50631/"]},{"id":"nvidia-israel-1-ai-supercomputer-israel","title":"NVIDIA Israel-1 AI Supercomputer (Israel)","url":"https://aidatacenterindex.com/datacenters/nvidia-israel-1-ai-supercomputer-israel.html","megawatts":null,"companies":["NVIDIA","Dell Technologies"],"country":"Israel","region":"Israel (undisclosed NVIDIA data center)","city":"","status":"operational","energy_type":"Grid (energy procurement not disclosed)","ai_focus":"AI supercomputing for research and selected partners","start_year":2023,"lat":31.0461,"lng":34.8516,"sources":["https://nvidianews.nvidia.com/news/nvidia-launches-accelerated-ethernet-platform-for-hyperscale-generative-ai","https://nvidianews.nvidia.com/news/nvidias-new-ethernet-networking-platform-for-ai-available-soon-from-dell-technologies-hewlett-packard-enterprise-lenovo","https://www.dell.com/en-us/blog/a-state-of-the-art-data-center-for-large-scale-ai/","https://www.datacenterdynamics.com/en/news/nvidias-israel-1-supercomputer-starts-operations/","https://www.calcalistech.com/ctechnews/article/hylduatvt"]},{"id":"openai-g42-abu-dhabi-ai-megacluster","title":"OpenAI / G42 Stargate UAE Cluster","url":"https://aidatacenterindex.com/datacenters/openai-g42-abu-dhabi-ai-megacluster.html","megawatts":null,"companies":["OpenAI","G42","Khazna Data Centers","Oracle","NVIDIA","Cisco","SoftBank Group"],"country":"United Arab Emirates","region":"Abu Dhabi","city":"Abu Dhabi","status":"under construction / first 200 MW expected in 2026","energy_type":"Unknown facility-specific energy procurement; cluster sits within the UAE-US AI Campus power envelope","ai_focus":"Training and inference cluster for OpenAI workloads and UAE sovereign AI capability","start_year":2026,"lat":24.4539,"lng":54.3773,"sources":["https://openai.com/index/introducing-stargate-uae/","https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae","https://www.prnewswire.com/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html","https://www.datacenterknowledge.com/deals/openai-announces-stargate-data-center-expansion-in-abu-dhabi"]},{"id":"oracle-ai-cloud-infrastructure-us","title":"Oracle AI Cloud Infrastructure (US Portfolio)","url":"https://aidatacenterindex.com/datacenters/oracle-ai-cloud-infrastructure-us.html","megawatts":null,"companies":["Oracle","NVIDIA","OpenAI"],"country":"United States","region":"United States OCI AI infrastructure and Stargate pipeline context","city":"","status":"operational platform and development pipeline","energy_type":"Energy procurement not disclosed at facility level","ai_focus":"OCI AI infrastructure and Stargate training/inference capacity","start_year":null,"lat":null,"lng":null,"sources":["https://www.oracle.com/ai-infrastructure/","https://blogs.oracle.com/cloud-infrastructure/worlds-largest-ai-supercomputer-in-the-cloud","https://investor.oracle.com/investor-news/news-details/2025/Oracle-Announces-Fiscal-2025-Fourth-Quarter-and-Fiscal-Full-Year-Financial-Results/default.aspx","https://openai.com/index/stargate-advances-with-partnership-with-oracle/"]},{"id":"oracle-generation-2-cloud-us-ashburn","title":"Oracle Cloud Infrastructure - US East (Ashburn)","url":"https://aidatacenterindex.com/datacenters/oracle-generation-2-cloud-us-ashburn.html","megawatts":null,"companies":["Oracle"],"country":"United States","region":"Northern Virginia","city":"Ashburn","status":"operational OCI public cloud region","energy_type":"Facility-level delivered energy mix not disclosed for US East (Ashburn)","ai_focus":"OCI region with Generative AI availability and AI infrastructure context","start_year":2017,"lat":39.0438,"lng":-77.4874,"sources":["https://www.oracle.com/cloud/public-cloud-regions/","https://docs.oracle.com/en-us/iaas/Content/General/Concepts/regions.htm","https://blogs.oracle.com/cloud-infrastructure/oracle-bare-metal-cloud-launches-in-the-us-east-region","https://docs.oracle.com/en-us/iaas/releasenotes/generative-ai/new-region-ashburn.htm","https://www.oracle.com/ai-infrastructure/"]},{"id":"stargate-ai-supercomputer","title":"OpenAI Stargate U.S. Infrastructure Program","url":"https://aidatacenterindex.com/datacenters/stargate-ai-supercomputer.html","megawatts":null,"companies":["OpenAI","SoftBank","Oracle","MGX","NVIDIA","Arm","Microsoft"],"country":"United States","region":"United States Stargate program","city":"","status":"planned / multi-site U.S. AI infrastructure program with initial sites under development","energy_type":"Unknown; energy and power arrangements vary by Stargate site","ai_focus":"OpenAI training and inference infrastructure across multiple U.S. Stargate sites","start_year":2025,"lat":null,"lng":null,"sources":["https://openai.com/index/announcing-the-stargate-project/","https://openai.com/index/five-new-stargate-sites/","https://openai.com/index/building-the-compute-infrastructure-for-the-intelligence-age/","https://www.theinformation.com/articles/microsoft-and-openai-plot-100-billion-stargate-ai-supercomputer","https://www.reuters.com/technology/microsoft-openai-planning-100-billion-data-center-project-information-reports-2024-03-29/"]},{"id":"tencent-tianjin-ai-data-center-china","title":"Tencent Tianjin AI Data Center (China)","url":"https://aidatacenterindex.com/datacenters/tencent-tianjin-ai-data-center-china.html","megawatts":null,"companies":["Tencent Holdings"],"country":"China","region":"Tianjin","city":"Tianjin","status":"operational","energy_type":"Grid with on-site solar microgrid and efficiency features","ai_focus":"Cloud, AI, big data, blockchain, and IoT services","start_year":2022,"lat":39.3434,"lng":117.3616,"sources":["https://www.idcnova.com/html/1/59/153/1222.html","https://www.tencent.com/en-us/articles/2201784.html","https://www.tencentcloud.com/global-infrastructure/sustainability","https://www.tencent.com/en-us/esg/environment.html"]}]}