    <title>500 MW to 1 GW AI Data Center Feed</title>
    <link>https://aidatacenterindex.com/capacity/500-mw-1-gw/feed/</link>
    <description>Chronological feed for 500 MW to 1 GW using the best public timeline year available for each tracked facility.</description>
  <item>
    <title>2032: Meta-TerraPower Natrium Power Agreement</title>
    <link>https://aidatacenterindex.com/datacenters/meta-terrapower-natrium-ai-campus-wyoming.html</link>
    <guid>https://aidatacenterindex.com/datacenters/meta-terrapower-natrium-ai-campus-wyoming.html</guid>
    <description>United States, United States | Planned | 690 MW — TerraPower and Meta announced an agreement to develop up to eight Natrium reactor and energy storage system plants in the United States. TerraPower says the initial agreement supports early development activities for two new Natrium units, </description>
  </item>
  <item>
    <title>2029: Duane Arnold Energy Center Google PPA Restart</title>
    <link>https://aidatacenterindex.com/datacenters/nextera-duane-arnold-nuclear-plant-reactivation.html</link>
    <guid>https://aidatacenterindex.com/datacenters/nextera-duane-arnold-nuclear-plant-reactivation.html</guid>
    <description>Palo, Palo / Linn County, Iowa, United States | Planned | 615 MW — NextEra Energy and Google announced a collaboration to restart the Duane Arnold Energy Center in Palo, Iowa and explore new nuclear generation in the United States. NextEra says Duane Arnold is Iowa&apos;s only nuclear facility and is targeted t</description>
  </item>
  <item>
    <title>2026: Prologis / Atlas Project Sail Data Center (Coweta County)</title>
    <link>https://aidatacenterindex.com/datacenters/atlas-development-project-sail-georgia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/atlas-development-project-sail-georgia.html</guid>
    <description>Coweta County, Georgia, United States | Planned | 900 MW — Project Sail is a Prologis / Atlas data-center proposal in Coweta County, Georgia, near Welcome to Sargent Road and Wagers Mill Road. The official project site says the current plan is nine buildings and 4.34 million square feet, with the b</description>
  </item>
  <item>
    <title>2026: Google Pine Island AI Data Center (Minnesota)</title>
    <link>https://aidatacenterindex.com/datacenters/google-pine-island-minnesota-ai-campus.html</link>
    <guid>https://aidatacenterindex.com/datacenters/google-pine-island-minnesota-ai-campus.html</guid>
    <description>Pine Island, Pine Island, Minnesota, United States | Announced | 600 MW — In February 2026, Google announced a major AI-optimized data center campus in Pine Island, Minnesota — a 600 MW facility representing one of the largest single AI compute investments in the US Midwest. The announcement is part of Google&apos;s b</description>
  </item>
  <item>
    <title>2026: Microsoft India South Central Cloud Region Program</title>
    <link>https://aidatacenterindex.com/datacenters/microsoft-india-ai-infrastructure-hyderabad-pune.html</link>
    <guid>https://aidatacenterindex.com/datacenters/microsoft-india-ai-infrastructure-hyderabad-pune.html</guid>
    <description>Hyderabad / India South Central cloud-region program, India | Under Construction | 600 MW — Microsoft India South Central Cloud Region Program tracks the Hyderabad-centered Microsoft cloud and AI infrastructure buildout, not a single mapped Hyderabad/Pune facility. Microsoft&apos;s December 9, 2025 release says the company will invest </description>
  </item>
  <item>
    <title>2026: Aramco Digital &amp; Groq Inference Data Center (Saudi Arabia)</title>
    <link>https://aidatacenterindex.com/datacenters/aramco-digital-groq-inference-data-center-saudi-arabia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/aramco-digital-groq-inference-data-center-saudi-arabia.html</guid>
    <description>Riyadh, Saudi Arabia (TBD), Saudi Arabia | Announced | 500 MW — Aramco Digital is partnering with Groq to establish a hyperscale inference complex in Saudi Arabia that will deploy Groq&apos;s Langua ge Processing Units at unprecedented scale. Marketed as the &quot;world&apos;s largest inferencing data center,&quot; the pro</description>
  </item>
  <item>
    <title>2025: Vantage Port Washington Lighthouse Stargate Campus</title>
    <link>https://aidatacenterindex.com/datacenters/microsoft-port-washington-wisconsin-stargate.html</link>
    <guid>https://aidatacenterindex.com/datacenters/microsoft-port-washington-wisconsin-stargate.html</guid>
    <description>Port Washington, Port Washington, Wisconsin, United States | Under Construction | 902 MW — Vantage Data Centers is developing the Port Washington Lighthouse campus in Wisconsin as a Stargate site for OpenAI and Oracle. Vantage&apos;s official location page says the 672-acre campus will include four single-story data centers totaling 9</description>
  </item>
  <item>
    <title>2025: AWS Mattameade / Orrock Data Center Campus</title>
    <link>https://aidatacenterindex.com/datacenters/aws-orrock-tech-campus-virginia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/aws-orrock-tech-campus-virginia.html</guid>
    <description>Caroline and Spotsylvania Counties, Virginia, United States | Planned | 770 MW — Amazon Data Services is seeking permits for the Mattameade Data Center project in Caroline and Spotsylvania Counties, Virginia. The U.S. Army Corps of Engineers public notice identifies the applicant as Amazon Data Services, gives a 1,143-a</description>
  </item>
  <item>
    <title>2025: EDF / OpCore Montereau AI Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/edf-opcore-montereau-ai-data-center-france.html</link>
    <guid>https://aidatacenterindex.com/datacenters/edf-opcore-montereau-ai-data-center-france.html</guid>
    <description>Montereau-Vallee-de-la-Seine, Ile-de-France, France | Planned | 700 MW — EDF and OpCore entered exclusive negotiations for a high-power data center at the former Montereau-Vallee-de-la-Seine thermal power plant southeast of Paris. Data Center Dynamics reports the project as a possible EUR 4 billion hyperscale da</description>
  </item>
  <item>
    <title>2025: Bell AI Fabric Data Center Network (British Columbia)</title>
    <link>https://aidatacenterindex.com/datacenters/bce-national-ai-data-center-initiative-canada.html</link>
    <guid>https://aidatacenterindex.com/datacenters/bce-national-ai-data-center-initiative-canada.html</guid>
    <description>Kamloops &amp; Merritt, British Columbia, Canada | Under Construction | 500 MW — Bell Canada is developing the &quot;Bell AI Fabric,&quot; a network of artificial intelligence data centers in British Columbia aimed at creating Canada&apos;s largest AI compute supercluster. The initiative targets a combined capacity of 500 megawatts (M</description>
  </item>
  <item>
    <title>2025: Naver &amp; NVIDIA Morocco AI Data Center (Tamesna)</title>
    <link>https://aidatacenterindex.com/datacenters/naver-nvidia-morocco-ai-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/naver-nvidia-morocco-ai-data-center.html</guid>
    <description>Tamesna, Northern Africa, Morocco | Planned | 500 MW — South Korea&apos;s Naver is leading a consortium with NVIDIA, Nexus Core Systems, and Lloyd Capital to develop a 500 MW AI campus in Tamesna, Morocco, with TAQA Morocco contracted to supply fully renewable power. The project breaks ground in lat</description>
  </item>
  <item>
    <title>2024: Crane Clean Energy Center (Three Mile Island Reactivation)</title>
    <link>https://aidatacenterindex.com/datacenters/three-mile-island-reactivation.html</link>
    <guid>https://aidatacenterindex.com/datacenters/three-mile-island-reactivation.html</guid>
    <description>Middletown, Londonderry Township / Middletown, Pennsylvania, United States | Planned | 835 MW — Constellation Energy is restarting the undamaged Three Mile Island Unit 1 reactor as the Crane Clean Energy Center under a 20-year power purchase agreement with Microsoft. Constellation says the agreement will restore about 835 MW of carbon</description>
  </item>
  <item>
    <title>2024: Microsoft — Japan AI Data Centers (Tokyo &amp; Osaka)</title>
    <link>https://aidatacenterindex.com/datacenters/microsoft-japan-ai-data-centers.html</link>
    <guid>https://aidatacenterindex.com/datacenters/microsoft-japan-ai-data-centers.html</guid>
    <description>Tokyo, Tokyo &amp; Osaka, Japan | Operational | 500 MW — Microsoft announced a $2.9 billion (¥440 billion) investment in April 2024 to significantly expand its cloud and AI infrastructure in Japan, its largest-ever investment in the country. This expansion doubles the company’s existing computing</description>
  </item>
  <item>
    <title>2024: Microsoft — São Paulo AI Infrastructure (Expansion)</title>
    <link>https://aidatacenterindex.com/datacenters/microsoft-brazil-sao-paulo-expansion.html</link>
    <guid>https://aidatacenterindex.com/datacenters/microsoft-brazil-sao-paulo-expansion.html</guid>
    <description>São Paulo, São Paulo, Brazil | Operational | 500 MW — In September 2024, Microsoft announced its largest single investment in Brazil, committing R$14.7 billion ($2.7 billion USD) over three years (2024–2027) to expand its cloud and artificial intelligence infrastructure. This expansion focuses</description>
  </item>
  <item>
    <title>2024: Oracle — Malaysia Public Cloud Region</title>
    <link>https://aidatacenterindex.com/datacenters/oracle-malaysia-public-cloud-region.html</link>
    <guid>https://aidatacenterindex.com/datacenters/oracle-malaysia-public-cloud-region.html</guid>
    <description>Kuala Lumpur, Greater Kuala Lumpur, Malaysia | Planned | 500 MW — In October 2024, Oracle announced a $6.5 billion (RM27 billion) investment to establish its first public cloud region in Malaysia, marking one of the largest tech investments in the country&apos;s history. The region will feature the OCI Supercl</description>
  </item>
  <item>
    <title>2023: Meta — Eagle Mountain, Utah AI Data Center Campus</title>
    <link>https://aidatacenterindex.com/datacenters/meta-eagle-mountain-utah-ai-campus.html</link>
    <guid>https://aidatacenterindex.com/datacenters/meta-eagle-mountain-utah-ai-campus.html</guid>
    <description>Eagle Mountain, Utah, United States | Under Construction | 500 MW — Meta&apos;s Eagle Mountain, Utah data center campus is a large-scale facility under development in Utah Valley, approximately 35 miles south of Salt Lake City. The site was selected for its access to renewable energy, land availability, and Utah</description>
  </item>
  <item>
    <title>2023: Microsoft Azure — Poland Central (Warsaw)</title>
    <link>https://aidatacenterindex.com/datacenters/microsoft-azure-poland-central-warsaw.html</link>
    <guid>https://aidatacenterindex.com/datacenters/microsoft-azure-poland-central-warsaw.html</guid>
    <description>Warsaw, Masovian, Poland | Operational | 500 MW — Microsoft launched the Poland Central region in January 2023 as part of a $1 billion investment in Polish digital infrastructure — its largest single-market investment in Central and Eastern Europe at the time of announcement. The region sp</description>
  </item>
  <item>
    <title>2023: Tesla Dojo Supercomputer — Buffalo New York</title>
    <link>https://aidatacenterindex.com/datacenters/tesla-dojo-supercomputer-new-york.html</link>
    <guid>https://aidatacenterindex.com/datacenters/tesla-dojo-supercomputer-new-york.html</guid>
    <description>Buffalo, New York, United States | Operational | 500 MW — Tesla&apos;s Dojo supercomputer at the Gigafactory New York (formerly SolarCity factory) in Buffalo is a purpose-built AI training system designed specifically for training Tesla&apos;s Autopilot and Full Self-Driving (FSD) neural networks on video d</description>
  </item>
  <item>
    <title>2021: Microsoft — Sweden Central AI Infrastructure</title>
    <link>https://aidatacenterindex.com/datacenters/microsoft-sweden-central-ai-infrastructure.html</link>
    <guid>https://aidatacenterindex.com/datacenters/microsoft-sweden-central-ai-infrastructure.html</guid>
    <description>Gävle, Gävle / Sandviken / Staffanstorp, Sweden | Operational | 500 MW — In June 2024, Microsoft announced a $3.2 billion investment to expand its Sweden Central data center region, specifically to accelerate AI transformation. The expansion includes the deployment of 20,000 advanced GPUs to support high-density</description>
  </item>
  <item>
    <title>2020: Alibaba Cloud — Zhangbei Super Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/alibaba-cloud-zhangbei-ai-data-center-china.html</link>
    <guid>https://aidatacenterindex.com/datacenters/alibaba-cloud-zhangbei-ai-data-center-china.html</guid>
    <description>Zhangbei, Hebei, China | Operational | 500 MW — Alibaba Cloud&apos;s Zhangbei Super Data Center sits on the windswept Bashang Plateau in Hebei Province, 260 kilometers northwest of Beijing. The campus is specifically designed for AI training workloads powering the Tongyi Qianwen (通义千问) large </description>
  </item>
  <item>
    <title>2016: Amazon Web Services — Ohio Region AI Campus (us-east-2)</title>
    <link>https://aidatacenterindex.com/datacenters/amazon-aws-ohio-us-east-2-new-albany.html</link>
    <guid>https://aidatacenterindex.com/datacenters/amazon-aws-ohio-us-east-2-new-albany.html</guid>
    <description>New Albany, Ohio, United States | Operational | 500 MW — Amazon Web Services&apos; Ohio region (us-east-2) is anchored in New Albany, just northeast of Columbus. AWS launched the region in 2016 and has continuously expanded, making the Columbus metro area one of the largest AWS infrastructure concentr</description>
  </item>
  <item>
    <title>2016: Microsoft Azure — Goodyear, Arizona AI Campus</title>
    <link>https://aidatacenterindex.com/datacenters/microsoft-goodyear-arizona-ai-campus.html</link>
    <guid>https://aidatacenterindex.com/datacenters/microsoft-goodyear-arizona-ai-campus.html</guid>
    <description>Goodyear, Arizona, United States | Operational | 500 MW — Microsoft&apos;s data center campus in Goodyear, Arizona — in the western Phoenix metro area — is a key node of Azure&apos;s West US 3 region and a growing hub for AI inference workloads supporting Microsoft Copilot and the Azure OpenAI Service. Micr</description>
  </item>
  <item>
    <title>2016: Microsoft Azure — UK South Region (London)</title>
    <link>https://aidatacenterindex.com/datacenters/microsoft-azure-uk-south-london.html</link>
    <guid>https://aidatacenterindex.com/datacenters/microsoft-azure-uk-south-london.html</guid>
    <description>London, Greater London, United Kingdom | Operational | 500 MW — Microsoft Azure UK South — the London region — is Microsoft&apos;s primary UK cloud and AI data center, launched in 2016 alongside the paired UK West (Cardiff) region. The London facilities span multiple data centers in the Thames Valley and Gre</description>
  </item>
  <item>
    <title>2011: Amazon Web Services — AP-NORTHEAST-1 Tokyo Region</title>
    <link>https://aidatacenterindex.com/datacenters/aws-tokyo-ap-northeast-1-japan.html</link>
    <guid>https://aidatacenterindex.com/datacenters/aws-tokyo-ap-northeast-1-japan.html</guid>
    <description>Tokyo, Tokyo, Japan | Operational | 500 MW — Amazon Web Services AP-NORTHEAST-1 — the Tokyo region — is AWS&apos;s flagship Asia-Pacific AI cloud region, launched in March 2011 and one of the largest and most sophisticated AWS deployments globally. Operating across four availability zones </description>
  </item>
  <item>
    <title>2007: Google — Pryor Creek, Oklahoma AI Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/google-pryor-oklahoma-ai-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/google-pryor-oklahoma-ai-data-center.html</guid>
    <description>Pryor, Oklahoma, United States | Operational | 600 MW — Google&apos;s data center campus in Pryor Creek, Oklahoma — located in Mayes County roughly 45 miles east of Tulsa — is one of the company&apos;s oldest and largest US inland facilities. Google broke ground in 2007, attracted by cheap hydroelectric p</description>
  </item>
  <item>
    <title>2007: Google — Council Bluffs, Iowa AI Data Center Campus</title>
    <link>https://aidatacenterindex.com/datacenters/google-iowa-council-bluffs-ai-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/google-iowa-council-bluffs-ai-data-center.html</guid>
    <description>Council Bluffs, Iowa, United States | Operational | 500 MW — Google&apos;s Council Bluffs, Iowa data center campus is one of the company&apos;s oldest and most significant US facilities, opened in 2007. The campus has undergone continuous expansion over nearly two decades and now represents a major component o</description>
  </item>
  <item>
    <title>2007: Microsoft — Quincy, Washington AI Data Center Campus</title>
    <link>https://aidatacenterindex.com/datacenters/microsoft-quincy-washington-ai-campus.html</link>
    <guid>https://aidatacenterindex.com/datacenters/microsoft-quincy-washington-ai-campus.html</guid>
    <description>Quincy, Washington State, United States | Operational | 500 MW — Microsoft&apos;s Quincy, Washington campus is one of the company&apos;s oldest and largest data center investments in the United States. Located in Grant County in eastern Washington State, the campus has been operational since 2007 and has grown int</description>
  </item>
  <item>
    <title>ByteDance — Johor AI Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/bytedance-johor-ai-data-center-malaysia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/bytedance-johor-ai-data-center-malaysia.html</guid>
    <description>Kulai, Johor, Malaysia | Under Construction | 500 MW — ByteDance is developing a massive 500 MW data center campus in Kulai, Johor, to support its global AI research and TikTok workloads outside China. This project, part of a multi-billion dollar regional investment, is specifically engineered </description>
  </item>
  <item>
    <title>Digital Edge — CGK AI Mega Campus</title>
    <link>https://aidatacenterindex.com/datacenters/digital-edge-cgk-ai-mega-campus-indonesia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/digital-edge-cgk-ai-mega-campus-indonesia.html</guid>
    <description>Bekasi, West Java, Indonesia | Under Construction | 500 MW — Digital Edge&apos;s CGK campus in Bekasi, Greater Jakarta, is a flagship 500 MW AI-ready infrastructure project, representing a $4.5 billion investment. The facility is designed to support the next generation of high-density AI workloads, featur</description>
  </item>
  <item>
    <title>Google-Kairos Power AI Data Center Initiative</title>
    <link>https://aidatacenterindex.com/datacenters/google-kairos-power-ai-data-center-initiative.html</link>
    <guid>https://aidatacenterindex.com/datacenters/google-kairos-power-ai-data-center-initiative.html</guid>
    <description>Oak Ridge, United States, United States | Announced | 500 MW — Google has entered into a pioneering agreement with Kairos Power to harness nuclear reactors to supply energy for its AI data centers. Announced Monday, via a blog post, Google said the deal would mark the first corporate deal of its kind a</description>
  </item>
  <item>
    <title>YTL &amp; NVIDIA — Johor AI Cloud</title>
    <link>https://aidatacenterindex.com/datacenters/ytl-nvidia-johor-ai-cloud-malaysia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/ytl-nvidia-johor-ai-cloud-malaysia.html</guid>
    <description>Kulai, Johor, Malaysia | Operational | 500 MW — The YTL-NVIDIA AI Cloud in Johor is a landmark 500 MW hyperscale project designed to anchor Malaysia’s position as a global AI hub. Powered by NVIDIA GB200 Grace Blackwell GPUs, the facility is one of the world’s most advanced AI training c</description>
  </item>