{"type":"FeatureCollection","generated_at":"2026-07-12T03:07:33.916Z","license":"CC BY 4.0","taxonomy":{"type":"capacity tier","name":"Over 1 GW","slug":"over-1-gw"},"features":[{"type":"Feature","geometry":{"type":"Point","coordinates":[-118.7947,55.1708]},"properties":{"id":"wonder-valley-off-grid-ai-data-center-park","title":"Wonder Valley Off-Grid AI Data Center Park","url":"https://aidatacenterindex.com/datacenters/wonder-valley-off-grid-ai-data-center-park.html","megawatts":7500,"companies":["O'Leary Ventures","Municipal District of Greenview"],"country":"Canada","status":"planned full-build campus; Phase 1 power infrastructure proposed","energy_type":"Natural Gas (Off-Grid)","ai_focus":"AI data-centre campus for hyperscale AI and cloud workloads; tenants not disclosed"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[54.3773,24.4539]},"properties":{"id":"g42-uae-us-ai-campus-abu-dhabi","title":"G42 “Stargate” UAE–US AI Campus (Abu Dhabi)","url":"https://aidatacenterindex.com/datacenters/g42-uae-us-ai-campus-abu-dhabi.html","megawatts":5000,"companies":["G42","Khazna Data Centers","OpenAI","Oracle","NVIDIA","Cisco","SoftBank Group"],"country":"United Arab Emirates","status":"under construction / first 200 MW Stargate UAE cluster expected in 2026","energy_type":"Abu Dhabi grid and new infrastructure power context; facility-specific procurement mix not disclosed","ai_focus":"Sovereign AI-grade compute, training, inference, and regional AI cloud services"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-91.517,32.417]},"properties":{"id":"meta-hyperion-ai-data-center-louisiana","title":"Meta Hyperion AI Data Center (Louisiana)","url":"https://aidatacenterindex.com/datacenters/meta-hyperion-ai-data-center-louisiana.html","megawatts":5000,"companies":["Meta","Entergy Louisiana"],"country":"United States","status":"under construction; future 5 GW expansion not yet delivered","energy_type":"Gas generation, transmission, storage, renewable matching, nuclear uprates/exploration","ai_focus":"AI training infrastructure for future open-source large language models"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-51.301,-30.003]},"properties":{"id":"scala-ai-city-eldorado-do-sul-brazil","title":"Scala — AI City (Eldorado do Sul)","url":"https://aidatacenterindex.com/datacenters/scala-ai-city-eldorado-do-sul-brazil.html","megawatts":4750,"companies":["Scala Data Centers"],"country":"Brazil","status":"planned campus with 5 GW grid-connection authorization and 54 MW first phase disclosed","energy_type":"100 percent renewable and certified energy strategy with long-term wind and hydro supply arrangements","ai_focus":"Training and Inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-113.773,50.916]},"properties":{"id":"beacon-ai-alberta-hyperscale-campuses","title":"Beacon AI Alberta Hyperscale Campuses","url":"https://aidatacenterindex.com/datacenters/beacon-ai-alberta-hyperscale-campuses.html","megawatts":4500,"companies":["Beacon AI Centers","Nadia Partners"],"country":"Canada","status":"planned multi-site Alberta development with sites targeted to energize as early as 2027","energy_type":"Grid and on-site (natural gas) hybrid","ai_focus":"Hyperscale AI and cloud data-center development; tenant workload mix not disclosed"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-87.872,42.723]},"properties":{"id":"microsoft-project-fairwater-wisconsin","title":"Microsoft Project Fairwater (Mount Pleasant, Wisconsin)","url":"https://aidatacenterindex.com/datacenters/microsoft-project-fairwater-wisconsin.html","megawatts":3300,"companies":["Microsoft","NVIDIA"],"country":"United States","status":"startup activity and equipment bring-up reported in May 2026; full campus buildout not complete","energy_type":"Grid supply with carbon-free energy matching and 250 MW solar support","ai_focus":"AI training datacenter for frontier-model workloads"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[126.471,34.989]},"properties":{"id":"stock-farm-road-ai-data-center-south-korea","title":"Stock Farm Road 3 GW AI Data Center (South Korea)","url":"https://aidatacenterindex.com/datacenters/stock-farm-road-ai-data-center-south-korea.html","megawatts":3000,"companies":["Stock Farm Road, Inc.","Fir Hills","Jeollanam-do Provincial Government"],"country":"South Korea","status":"announced MOU-stage proposal; early-stage and not fully funded","energy_type":"Grid and power supply not yet source-resolved","ai_focus":"Hyperscale AI training campus proposal"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-86.51,41.7]},"properties":{"id":"aws-project-rainier-ai-campus-indiana","title":"AWS Project Rainier (New Carlisle, Indiana)","url":"https://aidatacenterindex.com/datacenters/aws-project-rainier-ai-campus-indiana.html","megawatts":2200,"companies":["Amazon Web Services","Anthropic"],"country":"United States","status":"operational first Project Rainier cluster; full campus buildout ongoing","energy_type":"Grid and NIPSCO framework; generation mix not fully source-resolved","ai_focus":"Training and inference for Anthropic Claude on Project Rainier"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-43.172,-22.906]},"properties":{"id":"elea-rio-ai-city-brazil","title":"Elea Rio AI City","url":"https://aidatacenterindex.com/datacenters/elea-rio-ai-city-brazil.html","megawatts":1500,"companies":["Elea Data Centers"],"country":"Brazil","status":"RJO1 operational; phased Rio AI City first-phase buildout in progress with RJO2 delivery beginning in 2026","energy_type":"Certified renewable energy capacity for phased Rio AI City buildout","ai_focus":"AI and cloud workloads across a phased Rio data-center district"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[35.027,27.569]},"properties":{"id":"neom-oxagon-net-zero-ai-data-center","title":"NEOM/DataVolt Oxagon AI Factory Campus","url":"https://aidatacenterindex.com/datacenters/neom-oxagon-net-zero-ai-data-center.html","megawatts":1500,"companies":["DataVolt","NEOM"],"country":"Saudi Arabia","status":"agreement signed; phased Oxagon AI factory campus with first phase expected operational by 2028","energy_type":"NEOM wind/solar-backed net-zero AI factory campus power plan","ai_focus":"AI factory / HPC and training campus"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-99.733,32.449]},"properties":{"id":"openai-stargate-data-center-texas","title":"Stargate Abilene AI Data Center Campus","url":"https://aidatacenterindex.com/datacenters/openai-stargate-data-center-texas.html","megawatts":1200,"companies":["OpenAI","Oracle","Crusoe","Lancium","NVIDIA"],"country":"United States","status":"first phase live; full 1.2 GW campus under construction","energy_type":"Grid interconnection with battery, solar, wind, backup gas turbines, and closed-loop cooling","ai_focus":"AI training and inference workloads on Oracle Cloud Infrastructure"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[83.218,17.687]},"properties":{"id":"adani-google-vizag-india-ai-campus","title":"Google / AdaniConneX Visakhapatnam AI Hub","url":"https://aidatacenterindex.com/datacenters/adani-google-vizag-india-ai-campus.html","megawatts":1000,"companies":["Google","Google Cloud","AdaniConneX","Adani Enterprises","Nxtra by Airtel"],"country":"India","status":"under construction; Google broke ground on April 28, 2026","energy_type":"Long-term clean-energy strategy and new clean-energy supply to the grid; not a delivered facility mix yet","ai_focus":"Gigawatt-scale AI hub for advanced AI services, large-scale cloud infrastructure, and India AI ecosystem growth"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[75.313,51.724]},"properties":{"id":"ekibastuz-ai-data-center-valley-kazakhstan","title":"Data Center Valley Ekibastuz AI Campus","url":"https://aidatacenterindex.com/datacenters/ekibastuz-ai-data-center-valley-kazakhstan.html","megawatts":1000,"companies":["Kazakhstan Ministry of AI and Digital Development","Kazakhtelecom"],"country":"Kazakhstan","status":"officially described as in active implementation phase","energy_type":"State-backed energy-capacity program in Ekibastuz; exact generation mix not publicly selected.","ai_focus":"Kazakhstan state-backed AI and data-center valley program"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-106.485,31.761]},"properties":{"id":"meta-el-paso-ai-mega-campus-texas","title":"Meta El Paso AI Data Center","url":"https://aidatacenterindex.com/datacenters/meta-el-paso-ai-mega-campus-texas.html","megawatts":1000,"companies":["Meta"],"country":"United States","status":"under construction; Meta says the site broke ground in 2025","energy_type":"Meta says data-center electricity use will be matched with 100% clean and renewable energy and that it has more than 5,000 MW of clean-energy projects under contract in Texas.","ai_focus":"Meta AI-optimized data center campus for current and future AI workloads"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-86.471,40.052]},"properties":{"id":"meta-lebanon-indiana-ai-campus","title":"Meta Lebanon AI Data Center","url":"https://aidatacenterindex.com/datacenters/meta-lebanon-indiana-ai-campus.html","megawatts":1000,"companies":["Meta"],"country":"United States","status":"breaking ground announced February 2026","energy_type":"Meta says it will match 100% of the new data center's energy use with clean energy and use a closed-loop liquid-cooling system.","ai_focus":"Meta AI-optimized data center campus for current and future AI workloads"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-82.808,40.081]},"properties":{"id":"meta-project-prometheus-ohio-ai-campus","title":"Meta Prometheus AI Supercluster (New Albany, Ohio)","url":"https://aidatacenterindex.com/datacenters/meta-project-prometheus-ohio-ai-campus.html","megawatts":1000,"companies":["Meta"],"country":"United States","status":"New Albany campus active and expanding; Prometheus described as a gigawatt-scale 2026 AI supercluster buildout","energy_type":"On-site gas generation reporting plus Meta renewable matching; campus-specific nuclear supply not isolated","ai_focus":"AI training supercluster"}}]}