<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
  <channel>
    <title>Finland AI Data Center Feed</title>
    <link>https://aidatacenterindex.com/countries/finland/feed/</link>
    <description>Chronological feed for Finland using the best public timeline year available for each tracked facility.</description>
  <item>
    <title>2023: NEBIUS AI Cloud — Mäntsälä Finland Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/nebius-ai-cloud-finland-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/nebius-ai-cloud-finland-data-center.html</guid>
    <description>Mäntsälä, Uusimaa, Finland | Operational | 100 MW — NEBIUS (formerly Yandex N.V., renamed after separating international operations from Russian assets) operates a major AI cloud data center in Mäntsälä, Finland — approximately 60 km northeast of Helsinki. The Mäntsälä facility was originall</description>
  </item>
  <item>
    <title>2022: LUMI AI Supercomputer Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/lumi-ai-supercomputer-finland.html</link>
    <guid>https://aidatacenterindex.com/datacenters/lumi-ai-supercomputer-finland.html</guid>
    <description>Kajaani, Kainuu, Finland | Operational | 7.1 MW — LUMI resides in a repurposed paper mill in Kajaani, Finland, where abundant hydroelectric power and direct liquid cooling enable one of the world&apos;s fastest and greenest supercomputers. The HPE Cray EX system packs 10,240 AMD Instinct MI250X</description>
  </item>
  <item>
    <title>2011: Google — Hamina, Finland AI Data Center Campus</title>
    <link>https://aidatacenterindex.com/datacenters/google-hamina-finland-ai-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/google-hamina-finland-ai-data-center.html</guid>
    <description>Hamina, Kymenlaakso, Finland | Operational | 200 MW — Google&apos;s Hamina data center in southeastern Finland is one of the company&apos;s most distinctive and well-known facilities worldwide. Built inside a converted paper mill on the Gulf of Finland, the Hamina campus uses a unique seawater cooling s</description>
  </item>
  <item>
    <title>Magnora — Hämeenlinna AI Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/magnora-hameenlinna-finland-ai-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/magnora-hameenlinna-finland-ai-data-center.html</guid>
    <description>Hämeenlinna, Kanta-Häme, Finland | Planned | 120 MW — Magnora ASA, in partnership with Northern Europe Energy Group (NEEG), is developing a 120 MW AI-ready data center in Hämeenlinna, Finland. Located in the MORE Industrial Park, the 150,000-square-meter site is strategically positioned betwee</description>
  </item>
  <item>
    <title>NVIDIA AI Factory — Helsinki, Finland</title>
    <link>https://aidatacenterindex.com/datacenters/nvidia-ai-factory-finland-helsinki.html</link>
    <guid>https://aidatacenterindex.com/datacenters/nvidia-ai-factory-finland-helsinki.html</guid>
    <description>Helsinki, Uusimaa, Finland | Under Construction | 40 MW — NVIDIA and CSC — Finland&apos;s IT Center for Science — announced a joint AI Factory in Helsinki as part of NVIDIA&apos;s European Sovereign AI initiative. The facility will be powered by 100% hydroelectric power sourced from Nordic renewable energy </description>
  </item>
  </channel>
</rss>
