<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
  <channel>
    <title>Russia AI Data Center Feed</title>
    <link>https://aidatacenterindex.com/countries/russia/feed/</link>
    <description>Chronological feed for Russia using the best public timeline year available for each tracked facility.</description>
  <item>
    <title>2020: Yandex Cloud — AI Training Data Centers</title>
    <link>https://aidatacenterindex.com/datacenters/yandex-cloud-ai-data-centers-russia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/yandex-cloud-ai-data-centers-russia.html</guid>
    <description>Mäntyselkä (Moscow region), Moscow Oblast, Russia | Operational | 150 MW — Yandex, Russia&apos;s dominant search engine and internet company, operates AI training infrastructure across multiple data centers in the Moscow region and Siberia. The facilities power YandexGPT — Russia&apos;s largest language model — and Alice (А</description>
  </item>
  <item>
    <title>Sberbank — Balakovo AI Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/sberbank-balakovo-ai-data-center-russia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/sberbank-balakovo-ai-data-center-russia.html</guid>
    <description>Balakovo, Saratov Oblast, Russia | Under Construction | 50 MW — Sberbank’s Balakovo facility is a massive regional AI data center located in the Saratov region. Featuring 7 modules and 3,500 server racks, the site has an estimated capacity of approximately 50 MW. Each rack is engineered to support high-</description>
  </item>
  <item>
    <title>Yandex — Vladimir AI Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/yandex-vladimir-ai-data-center-russia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/yandex-vladimir-ai-data-center-russia.html</guid>
    <description>Vladimir, Vladimir Oblast, Russia | Under Construction | 40 MW — Yandex is developing its sixth data center in Vladimir Oblast, approximately 190 km east of Moscow, with capacity exceeding 40 MW and targeted for 2026 completion. The facility forms part of Yandex’s continuous data center expansion program</description>
  </item>
  </channel>
</rss>
