<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
  <channel>
    <title>Saudi Arabia AI Data Center Feed</title>
    <link>https://aidatacenterindex.com/countries/saudi-arabia/feed/</link>
    <description>Chronological feed for Saudi Arabia using the best public timeline year available for each tracked facility.</description>
  <item>
    <title>2028: NEOM/DataVolt Oxagon AI Factory Campus</title>
    <link>https://aidatacenterindex.com/datacenters/neom-oxagon-net-zero-ai-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/neom-oxagon-net-zero-ai-data-center.html</guid>
    <description>Oxagon, Oxagon, NEOM, Saudi Arabia | Planned | 1.5 GW — NEOM and DataVolt signed an agreement for an AI factory in Oxagon backed by an initial USD 5 billion phase. NEOM&apos;s official release describes a 1.5 GW factory/campus using a phased approach and expected to be operational by 2028. Data Cente</description>
  </item>
  <item>
    <title>2026: Aramco Digital &amp; Groq Inference Data Center (Saudi Arabia)</title>
    <link>https://aidatacenterindex.com/datacenters/aramco-digital-groq-inference-data-center-saudi-arabia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/aramco-digital-groq-inference-data-center-saudi-arabia.html</guid>
    <description>Riyadh, Saudi Arabia (TBD), Saudi Arabia | Announced | 500 MW — Aramco Digital is partnering with Groq to establish a hyperscale inference complex in Saudi Arabia that will deploy Groq&apos;s Langua ge Processing Units at unprecedented scale. Marketed as the &quot;world&apos;s largest inferencing data center,&quot; the pro</description>
  </item>
  <item>
    <title>2026: Humain AI Data Centers (Saudi Arabia)</title>
    <link>https://aidatacenterindex.com/datacenters/humain-ai-data-centers-saudi-arabia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/humain-ai-data-centers-saudi-arabia.html</guid>
    <description>Riyadh, Riyadh &amp; Dammam, Saudi Arabia | Under Construction | 200 MW — Saudi Arabia&apos;s Public Investment Fund (PIF) created Humain in 2025 as the kingdom&apos;s national AI infrastructure company, tasked with building sovereign AI compute at a scale that positions Saudi Arabia as a global AI leader. Construction bro</description>
  </item>
  <item>
    <title>2025: NEOM/DataVolt Oxagon AI Factory Campus Overlap</title>
    <link>https://aidatacenterindex.com/datacenters/neom-oxagon-ai-data-center-campus.html</link>
    <guid>https://aidatacenterindex.com/datacenters/neom-oxagon-ai-data-center-campus.html</guid>
    <description>Oxagon, Oxagon, NEOM, Saudi Arabia | Planned — This record is an overlapping representation of the NEOM/DataVolt Oxagon AI factory campus also tracked by `neom-oxagon-net-zero-ai-data-center`. Opened NEOM and Data Center Dynamics sources support one source-backed 1.5 GW DataVolt/NEOM Ox</description>
  </item>
  <item>
    <title>2024: KAUST — Shaheen III Supercomputer</title>
    <link>https://aidatacenterindex.com/datacenters/kaust-supercomputing-saudi-arabia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/kaust-supercomputing-saudi-arabia.html</guid>
    <description>Thuwal, Makkah, Saudi Arabia | Operational | 35 MW — KAUST&apos;s Shaheen III supercomputer, ranked among the world&apos;s top 10 most powerful supercomputers at launch in 2024, is powered by HPE Cray EX hardware and uses AMD EPYC processors alongside NVIDIA GPUs. Shaheen III delivers approximately 44.</description>
  </item>
  <item>
    <title>2022: stc Cloud — Saudi Arabia AI Data Centers</title>
    <link>https://aidatacenterindex.com/datacenters/stc-cloud-saudi-ai-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/stc-cloud-saudi-ai-data-center.html</guid>
    <description>Riyadh, Riyadh, Saudi Arabia | Operational | 200 MW — Saudi Telecom Company&apos;s cloud arm, stc Cloud, operates Saudi Arabia&apos;s largest national cloud infrastructure, serving as the backbone for the Kingdom&apos;s Vision 2030 digital transformation. The Riyadh data centers house AI workloads for Saudi </description>
  </item>
  <item>
    <title>Hexagon Data Center — Riyadh</title>
    <link>https://aidatacenterindex.com/datacenters/hexagon-data-center-riyadh.html</link>
    <guid>https://aidatacenterindex.com/datacenters/hexagon-data-center-riyadh.html</guid>
    <description>Riyadh, Riyadh, Saudi Arabia | Under Construction | 480 MW — The Hexagon Data Center in Riyadh is described as the world’s largest government-owned AI data center facility. Breaking ground in January 2026, the 480 MW campus is operated by the Saudi Data &amp; AI Authority (SDAIA). It is a Tier IV designe</description>
  </item>
  <item>
    <title>Microsoft Azure — Saudi Arabia East (Dammam)</title>
    <link>https://aidatacenterindex.com/datacenters/microsoft-azure-saudi-arabia-east-dammam.html</link>
    <guid>https://aidatacenterindex.com/datacenters/microsoft-azure-saudi-arabia-east-dammam.html</guid>
    <description>Dammam, Eastern Province, Saudi Arabia | Planned | 100 MW — Microsoft’s Saudi Arabia East Azure region is a flagship hyperscale cloud development located in Dammam, scheduled to go live in Q4 2026. The region consists of three independent Availability Zones designed for high resilience and sovereign</description>
  </item>
  </channel>
</rss>
