<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
  <channel>
    <title>Fossil AI Data Center Feed</title>
    <link>https://aidatacenterindex.com/energy/fossil/feed/</link>
    <description>Chronological feed for Fossil using the best public timeline year available for each tracked facility.</description>
  <item>
    <title>2026: Google Nebraska Reported Mega-Campus Proposal</title>
    <link>https://aidatacenterindex.com/datacenters/google-nebraska-mega-campus-private-gas-power.html</link>
    <guid>https://aidatacenterindex.com/datacenters/google-nebraska-mega-campus-private-gas-power.html</guid>
    <description>Nebraska, United States | Announced — Flatwater Free Press and Grist reported in 2026 that Google was considering a Nebraska data-center proposal powered by a privately built combined-cycle natural-gas plant with carbon capture. The documents they reviewed named Google, Tenaska</description>
  </item>
  <item>
    <title>2024: Wonder Valley Off-Grid AI Data Center Park</title>
    <link>https://aidatacenterindex.com/datacenters/wonder-valley-off-grid-ai-data-center-park.html</link>
    <guid>https://aidatacenterindex.com/datacenters/wonder-valley-off-grid-ai-data-center-park.html</guid>
    <description>Grande Prairie, Western Canada, Canada | Planned | 7.5 GW — Wonder Valley is O&apos;Leary Ventures&apos; proposed off-grid AI data-center park near Grande Prairie in the Greenview Industrial Gateway. Gensler describes the Alberta campus as a nearly 8,000-acre AI data-centre campus with more than 50 facilities</description>
  </item>
  <item>
    <title>2024: xAI Colossus / MACROHARDRR Greater Memphis AI Campus</title>
    <link>https://aidatacenterindex.com/datacenters/xai-gigascale-data-center-tennessee-mississippi.html</link>
    <guid>https://aidatacenterindex.com/datacenters/xai-gigascale-data-center-tennessee-mississippi.html</guid>
    <description>Greater Memphis / Southaven xAI region, United States | Under Construction | 2.0 GW — xAI describes Colossus as its gigafactory of compute, built rapidly and doubled to a 200,000 H100 GPU interconnected cluster, with a roadmap to 1 million GPUs. Mississippi state sources announced in January 2026 that xAI is locating the MAC</description>
  </item>
  <item>
    <title>2024: ExxonMobil Data-Center Power Generation Initiative</title>
    <link>https://aidatacenterindex.com/datacenters/exxonmobil-1-5gw-data-center-power-plant-initiative.html</link>
    <guid>https://aidatacenterindex.com/datacenters/exxonmobil-1-5gw-data-center-power-plant-initiative.html</guid>
    <description>United States, United States | Planned | 1.5 GW — ExxonMobil announced a U.S. data-center power generation initiative using natural gas generation paired with carbon capture and storage. ExxonMobil&apos;s opened official page says the company is in FEED for a facility that would generate more t</description>
  </item>
  <item>
    <title>Pure Data Centre — Dublin AI Microgrid</title>
    <link>https://aidatacenterindex.com/datacenters/pure-data-centre-dublin-ai-microgrid.html</link>
    <guid>https://aidatacenterindex.com/datacenters/pure-data-centre-dublin-ai-microgrid.html</guid>
    <description>Dublin, Leinster, Ireland | Operational | 110 MW — Launched in early 2026, the Pure Data Centre Dublin facility is Europe’s first &quot;islanded&quot; microgrid data center, designed to bypass grid connection delays. The 110 MW campus was specifically built to handle high-density AI workloads, repres</description>
  </item>
  <item>
    <title>eStruxture&apos;s CAL-3 Hyperscale Data Center (Calgary)</title>
    <link>https://aidatacenterindex.com/datacenters/estruxture-cal-3-hyperscale-data-center-calgary.html</link>
    <guid>https://aidatacenterindex.com/datacenters/estruxture-cal-3-hyperscale-data-center-calgary.html</guid>
    <description>Balzac, Western Canada, Canada | Under Construction | 90 MW — In October 2024, Montreal-based eStruxture Data Centres announced plans for CAL-3, a 90 MW hyperscale data center north of Calgary in Rocky View County. Slated to go live in the second half of 2026, CAL-3 will be Alberta&apos;s largest and most </description>
  </item>
  </channel>
</rss>
