<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
  <channel>
    <title>Hydroelectric AI Data Center Feed</title>
    <link>https://aidatacenterindex.com/energy/hydroelectric/feed/</link>
    <description>Chronological feed for Hydroelectric using the best public timeline year available for each tracked facility.</description>
  <item>
    <title>2026: Digital Realty UK AI Mega-Campus</title>
    <link>https://aidatacenterindex.com/datacenters/digital-realty-uk-mega-campus-ai.html</link>
    <guid>https://aidatacenterindex.com/datacenters/digital-realty-uk-mega-campus-ai.html</guid>
    <description>Slough, London/Slough, United Kingdom | Planned | 300 MW — Digital Realty is significantly expanding its UK footprint with a $2 billion &quot;Mega-Campus&quot; project designed to meet the high-density power demands of AI and hyperscale workloads. The campus is projected to reach a total capacity exceeding 3</description>
  </item>
  <item>
    <title>2026: Vantage Data Centers Quebec Expansion (Montreal &amp; Quebec City)</title>
    <link>https://aidatacenterindex.com/datacenters/vantage-quebec-ai-data-center-expansion.html</link>
    <guid>https://aidatacenterindex.com/datacenters/vantage-quebec-ai-data-center-expansion.html</guid>
    <description>Montreal, Quebec, Canada | Operational | 178 MW — Vantage Data Centers has significantly expanded its Canadian footprint in early 2026, reaching a projected total capacity of 178 megawatts (MW) across its Quebec portfolio. This expansion is centered in Montreal and Quebec City, with the co</description>
  </item>
  <item>
    <title>2025: Bell AI Fabric Data Center Network (British Columbia)</title>
    <link>https://aidatacenterindex.com/datacenters/bce-national-ai-data-center-initiative-canada.html</link>
    <guid>https://aidatacenterindex.com/datacenters/bce-national-ai-data-center-initiative-canada.html</guid>
    <description>Kamloops &amp; Merritt, British Columbia, Canada | Under Construction | 500 MW — Bell Canada is developing the &quot;Bell AI Fabric,&quot; a network of artificial intelligence data centers in British Columbia aimed at creating Canada&apos;s largest AI compute supercluster. The initiative targets a combined capacity of 500 megawatts (M</description>
  </item>
  <item>
    <title>2022: LUMI AI Supercomputer Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/lumi-ai-supercomputer-finland.html</link>
    <guid>https://aidatacenterindex.com/datacenters/lumi-ai-supercomputer-finland.html</guid>
    <description>Kajaani, Kainuu, Finland | Operational | 7.1 MW — LUMI resides in a repurposed paper mill in Kajaani, Finland, where abundant hydroelectric power and direct liquid cooling enable one of the world&apos;s fastest and greenest supercomputers. The HPE Cray EX system packs 10,240 AMD Instinct MI250X</description>
  </item>
  <item>
    <title>2021: Huawei Cloud — Guizhou AI Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/huawei-cloud-guizhou-ai-data-center-china.html</link>
    <guid>https://aidatacenterindex.com/datacenters/huawei-cloud-guizhou-ai-data-center-china.html</guid>
    <description>Guiyang, Guizhou, China | Operational | 400 MW — Huawei Cloud&apos;s Guizhou data center cluster in Guiyang, the provincial capital of Guizhou, is a major hub for training the Pangu (盘古) large model family, which includes language, vision, and scientific AI models. Guizhou was designated China</description>
  </item>
  <item>
    <title>2019: atNorth ICE02 AI Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/atnorth-ice02-ai-data-center-iceland.html</link>
    <guid>https://aidatacenterindex.com/datacenters/atnorth-ice02-ai-data-center-iceland.html</guid>
    <description>Keflavík, Southern Peninsula, Iceland | Operational | 80 MW — atNorth&apos;s ICE02 campus near Keflavík, Iceland, offers more than 13,000 square meters of white space and scalable power beyond 80 megawatts for GPU-intensive tenants. The site pairs Iceland&apos;s 100% renewable hydro and geothermal grid with dir</description>
  </item>
  <item>
    <title>2018: Amazon Web Services — EU-NORTH-1 Stockholm Region</title>
    <link>https://aidatacenterindex.com/datacenters/aws-stockholm-eu-north-1-sweden.html</link>
    <guid>https://aidatacenterindex.com/datacenters/aws-stockholm-eu-north-1-sweden.html</guid>
    <description>Stockholm, Stockholm, Sweden | Operational | 150 MW — Amazon Web Services launched its EU-NORTH-1 region in Stockholm in December 2018, specifically designed to serve customers requiring data residency in northern Europe and access to ultra-low carbon cloud infrastructure. The region operates </description>
  </item>
  <item>
    <title>2006: Google — The Dalles Oregon Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/google-the-dalles-oregon-ai-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/google-the-dalles-oregon-ai-data-center.html</guid>
    <description>The Dalles, Oregon, United States | Operational | 400 MW — Google&apos;s data center campus in The Dalles, Oregon is one of the company&apos;s oldest and largest US facilities. Located on the Columbia River, the campus benefits from cheap hydroelectric power from the Bonneville Power Administration and excel</description>
  </item>
  <item>
    <title>Bulk Data Centers — N01 AI Campus</title>
    <link>https://aidatacenterindex.com/datacenters/bulk-data-centers-n01-ai-campus-norway.html</link>
    <guid>https://aidatacenterindex.com/datacenters/bulk-data-centers-n01-ai-campus-norway.html</guid>
    <description>Kristiansand, Agder, Norway | Under Construction | 300 MW — The N01 Campus in Kristiansand, operated by Bulk Data Centers (Bulk Infrastructure Group), is one of Europe’s most strategically positioned hyperscale AI campuses — a purpose-built facility on the southwestern Norwegian coast that combines </description>
  </item>
  <item>
    <title>Google — Skien AI Campus</title>
    <link>https://aidatacenterindex.com/datacenters/google-skien-ai-campus-norway.html</link>
    <guid>https://aidatacenterindex.com/datacenters/google-skien-ai-campus-norway.html</guid>
    <description>Skien, Telemark, Norway | Under Construction | 240 MW — Google is developing a €600 million data center campus in Skien, Norway — the company&apos;s first major hyperscale investment in Norway and a significant expansion of Google&apos;s Northern European AI infrastructure footprint. The 240 MW facility i</description>
  </item>
  <item>
    <title>Stargate Norway — Narvik AI Gigafactory</title>
    <link>https://aidatacenterindex.com/datacenters/stargate-norway-narvik-ai-gigafactory.html</link>
    <guid>https://aidatacenterindex.com/datacenters/stargate-norway-narvik-ai-gigafactory.html</guid>
    <description>Narvik, Nordland, Norway | Under Construction | 230 MW — &quot;Stargate Norway&quot; is a $1 billion &quot;AI Gigafactory&quot; located in Kvandal, near Narvik. A strategic collaboration between OpenAI, Nscale, and Aker, the facility is designed to host 100,000 NVIDIA GPUs by late 2026. The site leverages Narvik&apos;s A</description>
  </item>
  <item>
    <title>Ethiopia — National AI Factory</title>
    <link>https://aidatacenterindex.com/datacenters/ethiopia-national-ai-factory.html</link>
    <guid>https://aidatacenterindex.com/datacenters/ethiopia-national-ai-factory.html</guid>
    <description>Addis Ababa, Addis Ababa, Ethiopia | Planned | 100 MW — Ethiopia&apos;s reported National AI Factory is a planned sovereign-AI infrastructure project centered on Addis Ababa and framed as part of the country&apos;s broader digital-industrial modernization agenda. Public reporting describes the initiative </description>
  </item>
  <item>
    <title>Green Mountain AI Data Center (Rjukan)</title>
    <link>https://aidatacenterindex.com/datacenters/green-mountain-rjukan-ai-campus-norway.html</link>
    <guid>https://aidatacenterindex.com/datacenters/green-mountain-rjukan-ai-campus-norway.html</guid>
    <description>Rjukan, Vestfold og Telemark, Norway | Operational | 50 MW — Green Mountain operates a high-security AI and HPC campus inside a former NATO facility in Rjukan, Norway. The modular halls are built in 2 megawatt blocks that scale to roughly 50 megawatts of IT load, all powered by nearby hydroelectric s</description>
  </item>
  <item>
    <title>NVIDIA AI Factory — Helsinki, Finland</title>
    <link>https://aidatacenterindex.com/datacenters/nvidia-ai-factory-finland-helsinki.html</link>
    <guid>https://aidatacenterindex.com/datacenters/nvidia-ai-factory-finland-helsinki.html</guid>
    <description>Helsinki, Uusimaa, Finland | Under Construction | 40 MW — NVIDIA and CSC — Finland&apos;s IT Center for Science — announced a joint AI Factory in Helsinki as part of NVIDIA&apos;s European Sovereign AI initiative. The facility will be powered by 100% hydroelectric power sourced from Nordic renewable energy </description>
  </item>
  </channel>
</rss>
