<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
  <channel>
    <title>AMD AI Data Center Feed</title>
    <link>https://aidatacenterindex.com/operators/amd/feed/</link>
    <description>Chronological feed for AMD using the best public timeline year available for each tracked facility.</description>
  <item>
    <title>2026: Humain AI Data Centers (Saudi Arabia)</title>
    <link>https://aidatacenterindex.com/datacenters/humain-ai-data-centers-saudi-arabia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/humain-ai-data-centers-saudi-arabia.html</guid>
    <description>Riyadh, Riyadh &amp; Dammam, Saudi Arabia | Under Construction | 200 MW — Saudi Arabia&apos;s Public Investment Fund (PIF) created Humain in 2025 as the kingdom&apos;s national AI infrastructure company, tasked with building sovereign AI compute at a scale that positions Saudi Arabia as a global AI leader. Construction bro</description>
  </item>
  <item>
    <title>2024: El Capitan Supercomputer — Lawrence Livermore National Laboratory</title>
    <link>https://aidatacenterindex.com/datacenters/el-capitan-supercomputer-llnl-california.html</link>
    <guid>https://aidatacenterindex.com/datacenters/el-capitan-supercomputer-llnl-california.html</guid>
    <description>Livermore, California, United States | Operational | 29.68 MW — El Capitan is an exascale supercomputer at Lawrence Livermore National Laboratory for the National Nuclear Security Administration mission. LLNL describes the system as deployed in 2024, and NNSA announced official verification on November </description>
  </item>
  <item>
    <title>2022: Frontier Supercomputer — Oak Ridge National Laboratory</title>
    <link>https://aidatacenterindex.com/datacenters/frontier-supercomputer-oak-ridge-tennessee.html</link>
    <guid>https://aidatacenterindex.com/datacenters/frontier-supercomputer-oak-ridge-tennessee.html</guid>
    <description>Oak Ridge, Tennessee, United States | Operational | 24.61 MW — Frontier is an exascale supercomputer at Oak Ridge National Laboratory&apos;s Oak Ridge Leadership Computing Facility. OLCF describes Frontier as delivered in 2021, entering early operations in 2022, and built as an HPE Cray EX system with AMD E</description>
  </item>
  </channel>
</rss>
