{"type":"FeatureCollection","generated_at":"2026-07-12T03:07:34.610Z","license":"CC BY 4.0","taxonomy":{"type":"operator","name":"Khazna Data Centers","slug":"khazna-data-centers"},"features":[{"type":"Feature","geometry":{"type":"Point","coordinates":[54.3773,24.4539]},"properties":{"id":"g42-uae-us-ai-campus-abu-dhabi","title":"G42 “Stargate” UAE–US AI Campus (Abu Dhabi)","url":"https://aidatacenterindex.com/datacenters/g42-uae-us-ai-campus-abu-dhabi.html","megawatts":5000,"companies":["G42","Khazna Data Centers","OpenAI","Oracle","NVIDIA","Cisco","SoftBank Group"],"country":"United Arab Emirates","status":"under construction / first 200 MW Stargate UAE cluster expected in 2026","energy_type":"Abu Dhabi grid and new infrastructure power context; facility-specific procurement mix not disclosed","ai_focus":"Sovereign AI-grade compute, training, inference, and regional AI cloud services"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[55.514,25.405]},"properties":{"id":"khazna-ajman-ai-data-center-uae","title":"Khazna Ajman AI Data Center (UAE)","url":"https://aidatacenterindex.com/datacenters/khazna-ajman-ai-data-center-uae.html","megawatts":100,"companies":["Khazna Data Centers"],"country":"United Arab Emirates","status":"under_construction","energy_type":"Grid (Etihad Water & Electricity)","ai_focus":"General-Purpose (AI cloud & hyperscale)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[55.435,25.411]},"properties":{"id":"khazna-qaj1-ajman-ai-data-center","title":"Khazna QAJ1 — Ajman AI Data Center","url":"https://aidatacenterindex.com/datacenters/khazna-qaj1-ajman-ai-data-center.html","megawatts":100,"companies":["Khazna Data Centers"],"country":"United Arab Emirates","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[54.3773,24.4539]},"properties":{"id":"openai-g42-abu-dhabi-ai-megacluster","title":"OpenAI / G42 Stargate UAE Cluster","url":"https://aidatacenterindex.com/datacenters/openai-g42-abu-dhabi-ai-megacluster.html","megawatts":null,"companies":["OpenAI","G42","Khazna Data Centers","Oracle","NVIDIA","Cisco","SoftBank Group"],"country":"United Arab Emirates","status":"under construction / first 200 MW expected in 2026","energy_type":"Unknown facility-specific energy procurement; cluster sits within the UAE-US AI Campus power envelope","ai_focus":"Training and inference cluster for OpenAI workloads and UAE sovereign AI capability"}}]}