<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
  <channel>
    <title>Pure Data Centre Group AI Data Center Feed</title>
    <link>https://aidatacenterindex.com/operators/pure-data-centre-group/feed/</link>
    <description>Chronological feed for Pure Data Centre Group using the best public timeline year available for each tracked facility.</description>
  <item>
    <title>Pure Data Centre — Dublin AI Microgrid</title>
    <link>https://aidatacenterindex.com/datacenters/pure-data-centre-dublin-ai-microgrid.html</link>
    <guid>https://aidatacenterindex.com/datacenters/pure-data-centre-dublin-ai-microgrid.html</guid>
    <description>Dublin, Leinster, Ireland | Operational | 110 MW — Launched in early 2026, the Pure Data Centre Dublin facility is Europe’s first &quot;islanded&quot; microgrid data center, designed to bypass grid connection delays. The 110 MW campus was specifically built to handle high-density AI workloads, repres</description>
  </item>
  </channel>
</rss>
