<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
  <channel>
    <title>Vantage Data Centers AI Data Center Feed</title>
    <link>https://aidatacenterindex.com/operators/vantage-data-centers/feed/</link>
    <description>Chronological feed for Vantage Data Centers using the best public timeline year available for each tracked facility.</description>
  <item>
    <title>2026: Vantage Data Centers Quebec Expansion (Montreal &amp; Quebec City)</title>
    <link>https://aidatacenterindex.com/datacenters/vantage-quebec-ai-data-center-expansion.html</link>
    <guid>https://aidatacenterindex.com/datacenters/vantage-quebec-ai-data-center-expansion.html</guid>
    <description>Montreal, Quebec, Canada | Operational | 178 MW — Vantage Data Centers has significantly expanded its Canadian footprint in early 2026, reaching a projected total capacity of 178 megawatts (MW) across its Quebec portfolio. This expansion is centered in Montreal and Quebec City, with the co</description>
  </item>
  <item>
    <title>2025: Vantage Frontier Shackelford County AI Campus</title>
    <link>https://aidatacenterindex.com/datacenters/vantage-texas-mega-campus-shackelford.html</link>
    <guid>https://aidatacenterindex.com/datacenters/vantage-texas-mega-campus-shackelford.html</guid>
    <description>Shackelford County, Texas, United States | Under Construction | 1.4 GW — Vantage Data Centers announced Frontier in August 2025 as a more than $25 billion mega-scale AI campus in Shackelford County, Texas. Vantage says the campus will provide 1.4 GW of GPU compute capacity, sit on 1,200 acres, include 10 data ce</description>
  </item>
  <item>
    <title>2025: Vantage Port Washington Lighthouse Stargate Campus</title>
    <link>https://aidatacenterindex.com/datacenters/microsoft-port-washington-wisconsin-stargate.html</link>
    <guid>https://aidatacenterindex.com/datacenters/microsoft-port-washington-wisconsin-stargate.html</guid>
    <description>Port Washington, Port Washington, Wisconsin, United States | Under Construction | 902 MW — Vantage Data Centers is developing the Port Washington Lighthouse campus in Wisconsin as a Stargate site for OpenAI and Oracle. Vantage&apos;s official location page says the 672-acre campus will include four single-story data centers totaling 9</description>
  </item>
  <item>
    <title>2025: Vantage Nevada AI Data Center (NV1)</title>
    <link>https://aidatacenterindex.com/datacenters/vantage-nevada-ai-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/vantage-nevada-ai-data-center.html</guid>
    <description>Henderson, Clark County, Nevada, United States | Under Construction | 224 MW — Vantage Data Centers is developing its first hyperscale campus in Nevada, known as NV1, located in Henderson (Clark County). The 224-megawatt (MW) campus spans multiple buildings and is designed to meet the high-density power requirements o</description>
  </item>
  <item>
    <title>2010: Vantage Data Centers — US West AI Campus (Santa Clara/Phoenix)</title>
    <link>https://aidatacenterindex.com/datacenters/vantage-data-centers-us-west-ai-campus.html</link>
    <guid>https://aidatacenterindex.com/datacenters/vantage-data-centers-us-west-ai-campus.html</guid>
    <description>Santa Clara, California, United States | Operational | 200 MW — Vantage Data Centers is a major hyperscale colocation operator with a significant presence in Silicon Valley (Santa Clara, San Jose), Phoenix, Arizona, and other US markets. The company specializes in purpose-built hyperscale facilities tha</description>
  </item>
  </channel>
</rss>
