<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
  <channel>
    <title>Nordics AI Data Center Feed</title>
    <link>https://aidatacenterindex.com/regions/nordics/feed/</link>
    <description>Chronological feed for Nordics using the best public timeline year available for each tracked facility.</description>
  <item>
    <title>2024: TikTok / ByteDance — Project Clover EU Data Center (Norway)</title>
    <link>https://aidatacenterindex.com/datacenters/tiktok-project-clover-eu-data-center-norway.html</link>
    <guid>https://aidatacenterindex.com/datacenters/tiktok-project-clover-eu-data-center-norway.html</guid>
    <description>Hamar, Hamar, Norway | Under Construction | 50 MW — Project Clover is TikTok&apos;s initiative to store European user data within European borders and segregate it from Chinese government access — responding to regulatory pressure from the European Commission, national data protection authorities</description>
  </item>
  <item>
    <title>2023: NEBIUS AI Cloud — Mäntsälä Finland Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/nebius-ai-cloud-finland-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/nebius-ai-cloud-finland-data-center.html</guid>
    <description>Mäntsälä, Uusimaa, Finland | Operational | 100 MW — NEBIUS (formerly Yandex N.V., renamed after separating international operations from Russian assets) operates a major AI cloud data center in Mäntsälä, Finland — approximately 60 km northeast of Helsinki. The Mäntsälä facility was originall</description>
  </item>
  <item>
    <title>2022: LUMI AI Supercomputer Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/lumi-ai-supercomputer-finland.html</link>
    <guid>https://aidatacenterindex.com/datacenters/lumi-ai-supercomputer-finland.html</guid>
    <description>Kajaani, Kainuu, Finland | Operational | 7.1 MW — LUMI resides in a repurposed paper mill in Kajaani, Finland, where abundant hydroelectric power and direct liquid cooling enable one of the world&apos;s fastest and greenest supercomputers. The HPE Cray EX system packs 10,240 AMD Instinct MI250X</description>
  </item>
  <item>
    <title>2021: Microsoft — Sweden Central AI Infrastructure</title>
    <link>https://aidatacenterindex.com/datacenters/microsoft-sweden-central-ai-infrastructure.html</link>
    <guid>https://aidatacenterindex.com/datacenters/microsoft-sweden-central-ai-infrastructure.html</guid>
    <description>Gävle, Gävle / Sandviken / Staffanstorp, Sweden | Operational | 500 MW — In June 2024, Microsoft announced a $3.2 billion investment to expand its Sweden Central data center region, specifically to accelerate AI transformation. The expansion includes the deployment of 20,000 advanced GPUs to support high-density</description>
  </item>
  <item>
    <title>2020: Google — Fredericia (Taulov) AI Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/google-fredericia-denmark-ai-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/google-fredericia-denmark-ai-data-center.html</guid>
    <description>Fredericia, South Denmark, Denmark | Operational | 200 MW — Google&apos;s Fredericia data center in Taulov is a hyperscale facility that has become a cornerstone of the company&apos;s European AI infrastructure. Originally opened in 2020, the site has undergone multiple expansions, including significant land </description>
  </item>
  <item>
    <title>2020: Google Cloud — Denmark Data Center (Fredericia)</title>
    <link>https://aidatacenterindex.com/datacenters/google-cloud-denmark-fredericia.html</link>
    <guid>https://aidatacenterindex.com/datacenters/google-cloud-denmark-fredericia.html</guid>
    <description>Fredericia, South Denmark, Denmark | Operational | 180 MW — Google&apos;s Fredericia data center in South Denmark is one of Google&apos;s longest-operating European facilities, first opened in 2020 and significantly expanded as AI workloads have grown. Located on the Jutland peninsula at a strategic point nea</description>
  </item>
  <item>
    <title>2019: Meta — Odense AI-Ready Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/meta-odense-denmark-ai-ready-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/meta-odense-denmark-ai-ready-data-center.html</guid>
    <description>Odense, Funen, Denmark | Operational | 300 MW — Meta&apos;s Odense campus is one of the world&apos;s most advanced AI-ready data centers. In 2022, Meta pivoted its design for the facility to prioritize AI workloads, integrating liquid cooling systems and high-density power distribution to support </description>
  </item>
  <item>
    <title>2019: atNorth ICE02 AI Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/atnorth-ice02-ai-data-center-iceland.html</link>
    <guid>https://aidatacenterindex.com/datacenters/atnorth-ice02-ai-data-center-iceland.html</guid>
    <description>Keflavík, Southern Peninsula, Iceland | Operational | 80 MW — atNorth&apos;s ICE02 campus near Keflavík, Iceland, offers more than 13,000 square meters of white space and scalable power beyond 80 megawatts for GPU-intensive tenants. The site pairs Iceland&apos;s 100% renewable hydro and geothermal grid with dir</description>
  </item>
  <item>
    <title>2018: Amazon Web Services — EU-NORTH-1 Stockholm Region</title>
    <link>https://aidatacenterindex.com/datacenters/aws-stockholm-eu-north-1-sweden.html</link>
    <guid>https://aidatacenterindex.com/datacenters/aws-stockholm-eu-north-1-sweden.html</guid>
    <description>Stockholm, Stockholm, Sweden | Operational | 150 MW — Amazon Web Services launched its EU-NORTH-1 region in Stockholm in December 2018, specifically designed to serve customers requiring data residency in northern Europe and access to ultra-low carbon cloud infrastructure. The region operates </description>
  </item>
  <item>
    <title>2013: Meta — Luleå, Sweden AI Data Center Campus</title>
    <link>https://aidatacenterindex.com/datacenters/meta-lulea-ai-data-center-sweden.html</link>
    <guid>https://aidatacenterindex.com/datacenters/meta-lulea-ai-data-center-sweden.html</guid>
    <description>Luleå, Norrbotten, Sweden | Operational | 300 MW — Meta&apos;s Luleå data center campus in northern Sweden is one of the company&apos;s largest and most celebrated facilities globally. Opened in 2013, it was the first Facebook/Meta data center built outside the United States and has grown into a mult</description>
  </item>
  <item>
    <title>2011: Google — Hamina, Finland AI Data Center Campus</title>
    <link>https://aidatacenterindex.com/datacenters/google-hamina-finland-ai-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/google-hamina-finland-ai-data-center.html</guid>
    <description>Hamina, Kymenlaakso, Finland | Operational | 200 MW — Google&apos;s Hamina data center in southeastern Finland is one of the company&apos;s most distinctive and well-known facilities worldwide. Built inside a converted paper mill on the Gulf of Finland, the Hamina campus uses a unique seawater cooling s</description>
  </item>
  <item>
    <title>Bulk Data Centers — N01 AI Campus</title>
    <link>https://aidatacenterindex.com/datacenters/bulk-data-centers-n01-ai-campus-norway.html</link>
    <guid>https://aidatacenterindex.com/datacenters/bulk-data-centers-n01-ai-campus-norway.html</guid>
    <description>Kristiansand, Agder, Norway | Under Construction | 300 MW — The N01 Campus in Kristiansand, operated by Bulk Data Centers (Bulk Infrastructure Group), is one of Europe’s most strategically positioned hyperscale AI campuses — a purpose-built facility on the southwestern Norwegian coast that combines </description>
  </item>
  <item>
    <title>EcoDataCenter — Borlänge AI Mega Campus</title>
    <link>https://aidatacenterindex.com/datacenters/ecodatacenter-borlange-ai-mega-campus-sweden.html</link>
    <guid>https://aidatacenterindex.com/datacenters/ecodatacenter-borlange-ai-mega-campus-sweden.html</guid>
    <description>Borlänge, Dalarna, Sweden | Under Construction | 250 MW — EcoDataCenter 2, located in Borlänge, Sweden, is a flagship AI expansion project built on the site of a former paper mill. With an initial capacity of 250 MW and scalability up to 600 MW, it is one of the largest AI-ready campuses in the No</description>
  </item>
  <item>
    <title>Google — Skien AI Campus</title>
    <link>https://aidatacenterindex.com/datacenters/google-skien-ai-campus-norway.html</link>
    <guid>https://aidatacenterindex.com/datacenters/google-skien-ai-campus-norway.html</guid>
    <description>Skien, Telemark, Norway | Under Construction | 240 MW — Google is developing a €600 million data center campus in Skien, Norway — the company&apos;s first major hyperscale investment in Norway and a significant expansion of Google&apos;s Northern European AI infrastructure footprint. The 240 MW facility i</description>
  </item>
  <item>
    <title>Stargate Norway — Narvik AI Gigafactory</title>
    <link>https://aidatacenterindex.com/datacenters/stargate-norway-narvik-ai-gigafactory.html</link>
    <guid>https://aidatacenterindex.com/datacenters/stargate-norway-narvik-ai-gigafactory.html</guid>
    <description>Narvik, Nordland, Norway | Under Construction | 230 MW — &quot;Stargate Norway&quot; is a $1 billion &quot;AI Gigafactory&quot; located in Kvandal, near Narvik. A strategic collaboration between OpenAI, Nscale, and Aker, the facility is designed to host 100,000 NVIDIA GPUs by late 2026. The site leverages Narvik&apos;s A</description>
  </item>
  <item>
    <title>Magnora — Hämeenlinna AI Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/magnora-hameenlinna-finland-ai-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/magnora-hameenlinna-finland-ai-data-center.html</guid>
    <description>Hämeenlinna, Kanta-Häme, Finland | Planned | 120 MW — Magnora ASA, in partnership with Northern Europe Energy Group (NEEG), is developing a 120 MW AI-ready data center in Hämeenlinna, Finland. Located in the MORE Industrial Park, the 150,000-square-meter site is strategically positioned betwee</description>
  </item>
  <item>
    <title>Green Mountain AI Data Center (Rjukan)</title>
    <link>https://aidatacenterindex.com/datacenters/green-mountain-rjukan-ai-campus-norway.html</link>
    <guid>https://aidatacenterindex.com/datacenters/green-mountain-rjukan-ai-campus-norway.html</guid>
    <description>Rjukan, Vestfold og Telemark, Norway | Operational | 50 MW — Green Mountain operates a high-security AI and HPC campus inside a former NATO facility in Rjukan, Norway. The modular halls are built in 2 megawatt blocks that scale to roughly 50 megawatts of IT load, all powered by nearby hydroelectric s</description>
  </item>
  <item>
    <title>NVIDIA AI Factory — Helsinki, Finland</title>
    <link>https://aidatacenterindex.com/datacenters/nvidia-ai-factory-finland-helsinki.html</link>
    <guid>https://aidatacenterindex.com/datacenters/nvidia-ai-factory-finland-helsinki.html</guid>
    <description>Helsinki, Uusimaa, Finland | Under Construction | 40 MW — NVIDIA and CSC — Finland&apos;s IT Center for Science — announced a joint AI Factory in Helsinki as part of NVIDIA&apos;s European Sovereign AI initiative. The facility will be powered by 100% hydroelectric power sourced from Nordic renewable energy </description>
  </item>
  </channel>
</rss>
