    <title>2027: AWS Project Spectrum / Comanche Peak Nuclear Data Center Campus</title>
    <link>https://aidatacenterindex.com/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html</link>
    <guid>https://aidatacenterindex.com/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html</guid>
    <description>Hood and Somervell Counties, Texas, United States | Planned | 1.2 GW — AWS Project Spectrum and the Comanche Peak nuclear power agreement form one of the clearest power-linked AI infrastructure signals in Texas. Vistra disclosed in a September 2025 SEC filing that it signed a 20-year power purchase agreement w</description>
  </item>
  <item>
    <title>2026: Google Wilbarger County Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/google-wilbarger-county-texas-ai-campus.html</link>
    <guid>https://aidatacenterindex.com/datacenters/google-wilbarger-county-texas-ai-campus.html</guid>
    <description>Wilbarger County, Texas, United States | Under Construction — Google announced a new data center under construction in Wilbarger County, Texas. Google&apos;s official Wilbarger County announcement says the facility will use advanced air-cooling technology, limiting water consumption to critical campus oper</description>
  </item>
  <item>
    <title>2025: Vantage Frontier Shackelford County AI Campus</title>
    <link>https://aidatacenterindex.com/datacenters/vantage-texas-mega-campus-shackelford.html</link>
    <guid>https://aidatacenterindex.com/datacenters/vantage-texas-mega-campus-shackelford.html</guid>
    <description>Shackelford County, Texas, United States | Under Construction | 1.4 GW — Vantage Data Centers announced Frontier in August 2025 as a more than $25 billion mega-scale AI campus in Shackelford County, Texas. Vantage says the campus will provide 1.4 GW of GPU compute capacity, sit on 1,200 acres, include 10 data ce</description>
  </item>
  <item>
    <title>2025: Stargate Abilene AI Data Center Campus</title>
    <link>https://aidatacenterindex.com/datacenters/openai-stargate-data-center-texas.html</link>
    <guid>https://aidatacenterindex.com/datacenters/openai-stargate-data-center-texas.html</guid>
    <description>Abilene, Abilene, Texas, United States | Under Construction | 1.2 GW — Stargate Abilene is the flagship Stargate AI data center campus at the Lancium Clean Campus in Abilene, Texas. Crusoe says construction began in June 2024 and that the initial two-building, 200+ MW phase was expected to be energized in the </description>
  </item>
  <item>
    <title>2025: Meta El Paso AI Data Center</title>
    <link>https://aidatacenterindex.com/datacenters/meta-el-paso-ai-mega-campus-texas.html</link>
    <guid>https://aidatacenterindex.com/datacenters/meta-el-paso-ai-mega-campus-texas.html</guid>
    <description>El Paso, El Paso, Texas, United States | Under Construction | 1.0 GW — Meta announced El Paso, Texas as an AI-focused data center in October 2025 and updated the project in March 2026. Meta says the data center can scale to 1 GW and now will officially grow to 1 GW. The company increased the initial $1.5 billi</description>
  </item>
  <item>
    <title>2023: Cerebras Systems — Condor Galaxy AI Supercomputer</title>
    <link>https://aidatacenterindex.com/datacenters/cerebras-systems-ai-wafer-cluster-us.html</link>
    <guid>https://aidatacenterindex.com/datacenters/cerebras-systems-ai-wafer-cluster-us.html</guid>
    <description>Dallas, Texas, United States | Operational | 30 MW — The Condor Galaxy AI supercomputer is a joint venture between Cerebras Systems and Abu Dhabi-based G42, designed to provide an alternative to GPU-based AI training. Condor Galaxy uses Cerebras&apos;s Wafer Scale Engine (WSE-2) chips — the world&apos;</description>
  </item>
  <item>
    <title>2017: Meta — Fort Worth, Texas AI Training Campus</title>
    <link>https://aidatacenterindex.com/datacenters/meta-fort-worth-texas-ai-campus.html</link>
    <guid>https://aidatacenterindex.com/datacenters/meta-fort-worth-texas-ai-campus.html</guid>
    <description>Fort Worth, Texas, United States | Operational | 350 MW — Meta&apos;s Fort Worth, Texas data center campus is one of the company&apos;s primary AI training sites in the United States. The campus, which has expanded multiple times since opening in 2017, hosts dense GPU clusters used to train and fine-tune Me</description>
  </item>
  <item>
    <title>2007: Microsoft — San Antonio, Texas AI Data Center Campus</title>
    <link>https://aidatacenterindex.com/datacenters/microsoft-san-antonio-texas-ai-data-center.html</link>
    <guid>https://aidatacenterindex.com/datacenters/microsoft-san-antonio-texas-ai-data-center.html</guid>
    <description>San Antonio, Texas, United States | Operational | 300 MW — Microsoft has operated data centers in San Antonio, Texas since 2007, making this one of the company&apos;s oldest and most mature US infrastructure investments. The San Antonio cluster, located in the north and northwest quadrants of the city, </description>