{"type":"FeatureCollection","generated_at":"2026-07-12T03:07:34.905Z","license":"CC BY 4.0","taxonomy":{"type":"status","name":"Under Construction","slug":"under-construction"},"features":[{"type":"Feature","geometry":{"type":"Point","coordinates":[54.3773,24.4539]},"properties":{"id":"g42-uae-us-ai-campus-abu-dhabi","title":"G42 “Stargate” UAE–US AI Campus (Abu Dhabi)","url":"https://aidatacenterindex.com/datacenters/g42-uae-us-ai-campus-abu-dhabi.html","megawatts":5000,"companies":["G42","Khazna Data Centers","OpenAI","Oracle","NVIDIA","Cisco","SoftBank Group"],"country":"United Arab Emirates","status":"under construction / first 200 MW Stargate UAE cluster expected in 2026","energy_type":"Abu Dhabi grid and new infrastructure power context; facility-specific procurement mix not disclosed","ai_focus":"Sovereign AI-grade compute, training, inference, and regional AI cloud services"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-91.517,32.417]},"properties":{"id":"meta-hyperion-ai-data-center-louisiana","title":"Meta Hyperion AI Data Center (Louisiana)","url":"https://aidatacenterindex.com/datacenters/meta-hyperion-ai-data-center-louisiana.html","megawatts":5000,"companies":["Meta","Entergy Louisiana"],"country":"United States","status":"under construction; future 5 GW expansion not yet delivered","energy_type":"Gas generation, transmission, storage, renewable matching, nuclear uprates/exploration","ai_focus":"AI training infrastructure for future open-source large language models"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-87.872,42.723]},"properties":{"id":"microsoft-project-fairwater-wisconsin","title":"Microsoft Project Fairwater (Mount Pleasant, Wisconsin)","url":"https://aidatacenterindex.com/datacenters/microsoft-project-fairwater-wisconsin.html","megawatts":3300,"companies":["Microsoft","NVIDIA"],"country":"United States","status":"startup activity and equipment bring-up reported in May 2026; full campus buildout not complete","energy_type":"Grid supply with carbon-free energy matching and 250 MW solar support","ai_focus":"AI training datacenter for frontier-model workloads"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-43.172,-22.906]},"properties":{"id":"elea-rio-ai-city-brazil","title":"Elea Rio AI City","url":"https://aidatacenterindex.com/datacenters/elea-rio-ai-city-brazil.html","megawatts":1500,"companies":["Elea Data Centers"],"country":"Brazil","status":"RJO1 operational; phased Rio AI City first-phase buildout in progress with RJO2 delivery beginning in 2026","energy_type":"Certified renewable energy capacity for phased Rio AI City buildout","ai_focus":"AI and cloud workloads across a phased Rio data-center district"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-99.733,32.449]},"properties":{"id":"openai-stargate-data-center-texas","title":"Stargate Abilene AI Data Center Campus","url":"https://aidatacenterindex.com/datacenters/openai-stargate-data-center-texas.html","megawatts":1200,"companies":["OpenAI","Oracle","Crusoe","Lancium","NVIDIA"],"country":"United States","status":"first phase live; full 1.2 GW campus under construction","energy_type":"Grid interconnection with battery, solar, wind, backup gas turbines, and closed-loop cooling","ai_focus":"AI training and inference workloads on Oracle Cloud Infrastructure"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[83.218,17.687]},"properties":{"id":"adani-google-vizag-india-ai-campus","title":"Google / AdaniConneX Visakhapatnam AI Hub","url":"https://aidatacenterindex.com/datacenters/adani-google-vizag-india-ai-campus.html","megawatts":1000,"companies":["Google","Google Cloud","AdaniConneX","Adani Enterprises","Nxtra by Airtel"],"country":"India","status":"under construction; Google broke ground on April 28, 2026","energy_type":"Long-term clean-energy strategy and new clean-energy supply to the grid; not a delivered facility mix yet","ai_focus":"Gigawatt-scale AI hub for advanced AI services, large-scale cloud infrastructure, and India AI ecosystem growth"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[75.313,51.724]},"properties":{"id":"ekibastuz-ai-data-center-valley-kazakhstan","title":"Data Center Valley Ekibastuz AI Campus","url":"https://aidatacenterindex.com/datacenters/ekibastuz-ai-data-center-valley-kazakhstan.html","megawatts":1000,"companies":["Kazakhstan Ministry of AI and Digital Development","Kazakhtelecom"],"country":"Kazakhstan","status":"officially described as in active implementation phase","energy_type":"State-backed energy-capacity program in Ekibastuz; exact generation mix not publicly selected.","ai_focus":"Kazakhstan state-backed AI and data-center valley program"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-106.485,31.761]},"properties":{"id":"meta-el-paso-ai-mega-campus-texas","title":"Meta El Paso AI Data Center","url":"https://aidatacenterindex.com/datacenters/meta-el-paso-ai-mega-campus-texas.html","megawatts":1000,"companies":["Meta"],"country":"United States","status":"under construction; Meta says the site broke ground in 2025","energy_type":"Meta says data-center electricity use will be matched with 100% clean and renewable energy and that it has more than 5,000 MW of clean-energy projects under contract in Texas.","ai_focus":"Meta AI-optimized data center campus for current and future AI workloads"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-86.471,40.052]},"properties":{"id":"meta-lebanon-indiana-ai-campus","title":"Meta Lebanon AI Data Center","url":"https://aidatacenterindex.com/datacenters/meta-lebanon-indiana-ai-campus.html","megawatts":1000,"companies":["Meta"],"country":"United States","status":"breaking ground announced February 2026","energy_type":"Meta says it will match 100% of the new data center's energy use with clean energy and use a closed-loop liquid-cooling system.","ai_focus":"Meta AI-optimized data center campus for current and future AI workloads"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-82.808,40.081]},"properties":{"id":"meta-project-prometheus-ohio-ai-campus","title":"Meta Prometheus AI Supercluster (New Albany, Ohio)","url":"https://aidatacenterindex.com/datacenters/meta-project-prometheus-ohio-ai-campus.html","megawatts":1000,"companies":["Meta"],"country":"United States","status":"New Albany campus active and expanding; Prometheus described as a gigawatt-scale 2026 AI supercluster buildout","energy_type":"On-site gas generation reporting plus Meta renewable matching; campus-specific nuclear supply not isolated","ai_focus":"AI training supercluster"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-87.876,43.387]},"properties":{"id":"microsoft-port-washington-wisconsin-stargate","title":"Vantage Port Washington Lighthouse Stargate Campus","url":"https://aidatacenterindex.com/datacenters/microsoft-port-washington-wisconsin-stargate.html","megawatts":902,"companies":["Vantage Data Centers","OpenAI","Oracle"],"country":"United States","status":"groundbreaking reported December 2025; scheduled for completion in 2028","energy_type":"Vantage says 70% of the campus power will come from zero-emission resources including solar, wind, and battery storage, with the remaining energy matched annually with renewable purchases.","ai_focus":"Stargate AI capacity for OpenAI and Oracle workloads"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-120.319,50.667]},"properties":{"id":"bce-national-ai-data-center-initiative-canada","title":"Bell AI Fabric Data Center Network (British Columbia)","url":"https://aidatacenterindex.com/datacenters/bce-national-ai-data-center-initiative-canada.html","megawatts":500,"companies":["Bell Canada (BCE)"],"country":"Canada","status":"under_construction","energy_type":"Grid (Hydroelectric)","ai_focus":"AI Inference & Training"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[103.61,1.65]},"properties":{"id":"bytedance-johor-ai-data-center-malaysia","title":"ByteDance — Johor AI Data Center","url":"https://aidatacenterindex.com/datacenters/bytedance-johor-ai-data-center-malaysia.html","megawatts":500,"companies":["ByteDance (TikTok)"],"country":"Malaysia","status":"under_construction","energy_type":"Unknown","ai_focus":"Training"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[106.982,-6.235]},"properties":{"id":"digital-edge-cgk-ai-mega-campus-indonesia","title":"Digital Edge — CGK AI Mega Campus","url":"https://aidatacenterindex.com/datacenters/digital-edge-cgk-ai-mega-campus-indonesia.html","megawatts":500,"companies":["Digital Edge"],"country":"Indonesia","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-111.999,40.313]},"properties":{"id":"meta-eagle-mountain-utah-ai-campus","title":"Meta — Eagle Mountain, Utah AI Data Center Campus","url":"https://aidatacenterindex.com/datacenters/meta-eagle-mountain-utah-ai-campus.html","megawatts":500,"companies":["Meta"],"country":"United States","status":"under_construction","energy_type":"Renewable","ai_focus":"Training (Llama, Meta AI)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[46.675,24.713]},"properties":{"id":"hexagon-data-center-riyadh","title":"Hexagon Data Center — Riyadh","url":"https://aidatacenterindex.com/datacenters/hexagon-data-center-riyadh.html","megawatts":480,"companies":["SDAIA (Saudi Data & AI Authority)"],"country":"Saudi Arabia","status":"under_construction","energy_type":"Unknown","ai_focus":"Unknown"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-98.525,46.001]},"properties":{"id":"applied-digital-ellendale-north-dakota-gpu-cloud","title":"Applied Digital Polaris Forge 1 - Ellendale AI Factory","url":"https://aidatacenterindex.com/datacenters/applied-digital-ellendale-north-dakota-gpu-cloud.html","megawatts":400,"companies":["Applied Digital","CoreWeave"],"country":"United States","status":"staged campus under construction","energy_type":"Renewable-power design intent and cool-climate efficiency","ai_focus":"AI and HPC infrastructure for CoreWeave"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[100.5018,13.7563]},"properties":{"id":"bytedance-thailand-ai-data-hub","title":"ByteDance — Thailand AI Data Hub","url":"https://aidatacenterindex.com/datacenters/bytedance-thailand-ai-data-hub.html","megawatts":400,"companies":["ByteDance","TikTok"],"country":"Thailand","status":"under_construction","energy_type":"Mixed","ai_focus":"Inference (TikTok AI, Content Recommendation)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[140.133,35.833]},"properties":{"id":"airtrunk-tok1-ai-expansion-tokyo","title":"AirTrunk — TOK1 AI Expansion (Tokyo)","url":"https://aidatacenterindex.com/datacenters/airtrunk-tok1-ai-expansion-tokyo.html","megawatts":300,"companies":["AirTrunk"],"country":"Japan","status":"under_construction","energy_type":"Renewable","ai_focus":"General Cloud"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[7.995,58.147]},"properties":{"id":"bulk-data-centers-n01-ai-campus-norway","title":"Bulk Data Centers — N01 AI Campus","url":"https://aidatacenterindex.com/datacenters/bulk-data-centers-n01-ai-campus-norway.html","megawatts":300,"companies":["Bulk Data Centers"],"country":"Norway","status":"under_construction","energy_type":"Hydroelectric","ai_focus":"Training"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-0.877,41.656]},"properties":{"id":"microsoft-aragon-ai-campus-spain","title":"Microsoft — Aragón AI Campus","url":"https://aidatacenterindex.com/datacenters/microsoft-aragon-ai-campus-spain.html","megawatts":300,"companies":["Microsoft"],"country":"Spain","status":"under_construction","energy_type":"Renewable","ai_focus":"Unknown"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[141.603,42.636]},"properties":{"id":"softbank-tomakomai-ai-data-center-japan","title":"SoftBank Tomakomai AI Data Center (Japan)","url":"https://aidatacenterindex.com/datacenters/softbank-tomakomai-ai-data-center-japan.html","megawatts":300,"companies":["SoftBank Corp.","NVIDIA"],"country":"Japan","status":"under_construction","energy_type":"100% renewable (local wind/cool climate)","ai_focus":"Sovereign AI (NVIDIA Blackwell, AI-RAN)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[15.434,60.484]},"properties":{"id":"ecodatacenter-borlange-ai-mega-campus-sweden","title":"EcoDataCenter — Borlänge AI Mega Campus","url":"https://aidatacenterindex.com/datacenters/ecodatacenter-borlange-ai-mega-campus-sweden.html","megawatts":250,"companies":["EcoDataCenter"],"country":"Sweden","status":"under_construction","energy_type":"Renewable","ai_focus":"Training"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[9.608,59.209]},"properties":{"id":"google-skien-ai-campus-norway","title":"Google — Skien AI Campus","url":"https://aidatacenterindex.com/datacenters/google-skien-ai-campus-norway.html","megawatts":240,"companies":["Google"],"country":"Norway","status":"under_construction","energy_type":"Hydroelectric","ai_focus":"Training and Inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[17.427,68.438]},"properties":{"id":"stargate-norway-narvik-ai-gigafactory","title":"Stargate Norway — Narvik AI Gigafactory","url":"https://aidatacenterindex.com/datacenters/stargate-norway-narvik-ai-gigafactory.html","megawatts":230,"companies":["OpenAI, Nscale & Aker"],"country":"Norway","status":"under_construction","energy_type":"Hydroelectric","ai_focus":"Training"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-86.299,32.366]},"properties":{"id":"meta-montgomery-ai-expansion-alabama","title":"Meta — Montgomery AI Expansion","url":"https://aidatacenterindex.com/datacenters/meta-montgomery-ai-expansion-alabama.html","megawatts":227,"companies":["Meta"],"country":"United States","status":"under_construction","energy_type":"Renewable","ai_focus":"Training and Inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-114.982,36.039]},"properties":{"id":"vantage-nevada-ai-data-center","title":"Vantage Nevada AI Data Center (NV1)","url":"https://aidatacenterindex.com/datacenters/vantage-nevada-ai-data-center.html","megawatts":224,"companies":["Vantage Data Centers"],"country":"United States","status":"under_construction","energy_type":"Solar (Utility PPA)","ai_focus":"Hyperscale Training and Inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[103.7414,1.4927]},"properties":{"id":"google-cloud-malaysia-ai-data-center","title":"Google Cloud Malaysia AI Data Center (Johor Bahru)","url":"https://aidatacenterindex.com/datacenters/google-cloud-malaysia-ai-data-center.html","megawatts":220,"companies":["Google"],"country":"Malaysia","status":"under_construction","energy_type":"Grid with renewable energy targets","ai_focus":"Inference (Gemini API, Vertex AI) and cloud workloads"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-84.017,33.667]},"properties":{"id":"dc-blox-conyers-ai-campus-georgia","title":"DC BLOX — Conyers AI Campus","url":"https://aidatacenterindex.com/datacenters/dc-blox-conyers-ai-campus-georgia.html","megawatts":216,"companies":["DC BLOX"],"country":"United States","status":"under_construction","energy_type":"Unknown","ai_focus":"Inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[46.72,24.7]},"properties":{"id":"humain-ai-data-centers-saudi-arabia","title":"Humain AI Data Centers (Saudi Arabia)","url":"https://aidatacenterindex.com/datacenters/humain-ai-data-centers-saudi-arabia.html","megawatts":200,"companies":["Humain","Amazon Web Services","AMD"],"country":"Saudi Arabia","status":"under_construction","energy_type":"Grid (KSA utility power)","ai_focus":"Training & Inference (national AI cloud)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[150.781,-33.847]},"properties":{"id":"microsoft-kemps-creek-sydney-hyperscale-campus","title":"Microsoft — Kemps Creek AI Campus (Sydney)","url":"https://aidatacenterindex.com/datacenters/microsoft-kemps-creek-sydney-hyperscale-campus.html","megawatts":190,"companies":["Microsoft"],"country":"Australia","status":"under_construction","energy_type":"Unknown","ai_focus":"Unknown"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-8.874,37.956]},"properties":{"id":"sines-4-0-sin02-ai-gigafactory-portugal","title":"SINES 4.0 — SIN02 AI Gigafactory","url":"https://aidatacenterindex.com/datacenters/sines-4-0-sin02-ai-gigafactory-portugal.html","megawatts":180,"companies":["Start Campus"],"country":"Portugal","status":"under_construction","energy_type":"Renewable","ai_focus":"Training"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[144.912,-37.828]},"properties":{"id":"nextdc-m4-melbourne-ai-factory","title":"NEXTDC — M4 Melbourne 'AI Factory'","url":"https://aidatacenterindex.com/datacenters/nextdc-m4-melbourne-ai-factory.html","megawatts":160,"companies":["NEXTDC"],"country":"Australia","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-100.317,20.561]},"properties":{"id":"odata-qr03-queretaro-ai-campus-mexico","title":"ODATA — QR03 Querétaro AI Campus","url":"https://aidatacenterindex.com/datacenters/odata-qr03-queretaro-ai-campus-mexico.html","megawatts":150,"companies":["ODATA (Aligned Data Centers)"],"country":"Mexico","status":"under_construction","energy_type":"Unknown","ai_focus":"General Cloud"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[135.483,34.573]},"properties":{"id":"softbank-sakai-ai-data-center-osaka","title":"SoftBank — Sakai AI Data Center","url":"https://aidatacenterindex.com/datacenters/softbank-sakai-ai-data-center-osaka.html","megawatts":150,"companies":["SoftBank"],"country":"Japan","status":"under_construction","energy_type":"Unknown","ai_focus":"General Cloud"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[106.845,-6.208]},"properties":{"id":"edgnex-jakarta-ai-data-center-indonesia","title":"EDGNEX — Jakarta AI Data Center","url":"https://aidatacenterindex.com/datacenters/edgnex-jakarta-ai-data-center-indonesia.html","megawatts":144,"companies":["EDGNEX by DAMAC"],"country":"Indonesia","status":"under_construction","energy_type":"Unknown","ai_focus":"General Cloud"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[106.529,10.912]},"properties":{"id":"viettel-tan-phu-trung-ai-data-center-vietnam","title":"Viettel — Tan Phu Trung AI Data Center","url":"https://aidatacenterindex.com/datacenters/viettel-tan-phu-trung-ai-data-center-vietnam.html","megawatts":140,"companies":["Viettel Group"],"country":"Vietnam","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-74.081,4.609]},"properties":{"id":"odata-bg03-bogota-ai-campus-colombia","title":"ODATA — BG03 Bogotá AI Campus","url":"https://aidatacenterindex.com/datacenters/odata-bg03-bogota-ai-campus-colombia.html","megawatts":120,"companies":["ODATA (Aligned Data Centers)"],"country":"Colombia","status":"under_construction","energy_type":"Unknown","ai_focus":"HPC / Supercomputing"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-79.337,43.856]},"properties":{"id":"microsoft-markham-ai-megaproject-canada","title":"Microsoft — Markham AI Megaproject","url":"https://aidatacenterindex.com/datacenters/microsoft-markham-ai-megaproject-canada.html","megawatts":112,"companies":["Microsoft"],"country":"Canada","status":"under_construction","energy_type":"Unknown","ai_focus":"Training"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[129.3114,35.5384]},"properties":{"id":"sk-aws-ulsan-ai-data-center-south-korea","title":"SK Group-AWS Ulsan AI Data Center","url":"https://aidatacenterindex.com/datacenters/sk-aws-ulsan-ai-data-center-south-korea.html","megawatts":103,"companies":["SK Group","SK Telecom","SK Broadband","SK Ecoplant","Amazon Web Services"],"country":"South Korea","status":"groundbreaking held August 2025; operations expected from 2027","energy_type":"SK and trade sources describe Ulsan as selected for access to large-scale electricity and SK Gas / SK multi utility LNG combined heat and power infrastructure.","ai_focus":"SK Group and AWS AI Zone data center in Ulsan"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[55.514,25.405]},"properties":{"id":"khazna-ajman-ai-data-center-uae","title":"Khazna Ajman AI Data Center (UAE)","url":"https://aidatacenterindex.com/datacenters/khazna-ajman-ai-data-center-uae.html","megawatts":100,"companies":["Khazna Data Centers"],"country":"United Arab Emirates","status":"under_construction","energy_type":"Grid (Etihad Water & Electricity)","ai_focus":"General-Purpose (AI cloud & hyperscale)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[55.435,25.411]},"properties":{"id":"khazna-qaj1-ajman-ai-data-center","title":"Khazna QAJ1 — Ajman AI Data Center","url":"https://aidatacenterindex.com/datacenters/khazna-qaj1-ajman-ai-data-center.html","megawatts":100,"companies":["Khazna Data Centers"],"country":"United Arab Emirates","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[21.012,52.229]},"properties":{"id":"microsoft-poland-ai-expansion-warsaw","title":"Microsoft — Poland AI Expansion (Warsaw)","url":"https://aidatacenterindex.com/datacenters/microsoft-poland-ai-expansion-warsaw.html","megawatts":100,"companies":["Microsoft"],"country":"Poland","status":"under_construction","energy_type":"Unknown","ai_focus":"HPC / Supercomputing"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[120.301,22.627]},"properties":{"id":"nvidia-foxconn-kaohsiung-ai-factory-taiwan","title":"Nvidia & Foxconn — Kaohsiung AI Factory","url":"https://aidatacenterindex.com/datacenters/nvidia-foxconn-kaohsiung-ai-factory-taiwan.html","megawatts":100,"companies":["Foxconn (Hon Hai Technology Group) & NVIDIA"],"country":"Taiwan","status":"under_construction","energy_type":"Unknown","ai_focus":"HPC / Supercomputing"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-114.008,51.213]},"properties":{"id":"estruxture-cal-3-hyperscale-data-center-calgary","title":"eStruxture's CAL-3 Hyperscale Data Center (Calgary)","url":"https://aidatacenterindex.com/datacenters/estruxture-cal-3-hyperscale-data-center-calgary.html","megawatts":90,"companies":["eStruxture Data Centres"],"country":"Canada","status":"under_construction","energy_type":"Natural Gas (Grid)","ai_focus":"Unknown"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[34.988,31.747]},"properties":{"id":"nebius-mega-or-israel-ai-hub","title":"Nebius & Mega Or — Israel AI Hub","url":"https://aidatacenterindex.com/datacenters/nebius-mega-or-israel-ai-hub.html","megawatts":80,"companies":["Nebius & Mega Or"],"country":"Israel","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[77.503,28.474]},"properties":{"id":"yotta-d2-greater-noida-ai-supercluster","title":"Yotta D2 / NVIDIA Blackwell AI Supercluster (Greater Noida)","url":"https://aidatacenterindex.com/datacenters/yotta-d2-greater-noida-ai-supercluster.html","megawatts":60,"companies":["Yotta Data Services","NVIDIA"],"country":"India","status":"under construction / planned AI supercluster; expected go-live by August 2026","energy_type":"Unknown facility-specific delivered energy mix; opened sources emphasize high-density AI infrastructure but do not disclose procurement terms for D2","ai_focus":"Blackwell Ultra GPU supercluster, NVIDIA DGX Cloud, Shakti Cloud, sovereign AI training and inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[47.8,52.03]},"properties":{"id":"sberbank-balakovo-ai-data-center-russia","title":"Sberbank — Balakovo AI Data Center","url":"https://aidatacenterindex.com/datacenters/sberbank-balakovo-ai-data-center-russia.html","megawatts":50,"companies":["Sberbank (Sber)"],"country":"Russia","status":"under_construction","energy_type":"Unknown","ai_focus":"Unknown"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[11.068,60.795]},"properties":{"id":"tiktok-project-clover-eu-data-center-norway","title":"TikTok / ByteDance — Project Clover EU Data Center (Norway)","url":"https://aidatacenterindex.com/datacenters/tiktok-project-clover-eu-data-center-norway.html","megawatts":50,"companies":["ByteDance","TikTok"],"country":"Norway","status":"under_construction","energy_type":"Renewable","ai_focus":"Inference (TikTok content delivery, EU user data storage)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-96.84,32.818]},"properties":{"id":"equinix-da12-dallas-texas","title":"Equinix DA12 Dallas (Texas)","url":"https://aidatacenterindex.com/datacenters/equinix-da12-dallas-texas.html","megawatts":40,"companies":["Equinix"],"country":"United States","status":"under_construction","energy_type":"Renewable (Utility PPA)","ai_focus":"High-Density AI and Machine Learning"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[24.9384,60.1699]},"properties":{"id":"nvidia-ai-factory-finland-helsinki","title":"NVIDIA AI Factory — Helsinki, Finland","url":"https://aidatacenterindex.com/datacenters/nvidia-ai-factory-finland-helsinki.html","megawatts":40,"companies":["NVIDIA","CSC (Finnish IT Center for Science)"],"country":"Finland","status":"under_construction","energy_type":"Hydroelectric (100% renewable)","ai_focus":"Sovereign AI, Nordic AI research, government AI"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[40.407,56.129]},"properties":{"id":"yandex-vladimir-ai-data-center-russia","title":"Yandex — Vladimir AI Data Center","url":"https://aidatacenterindex.com/datacenters/yandex-vladimir-ai-data-center-russia.html","megawatts":40,"companies":["Yandex"],"country":"Russia","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-79.383,43.653]},"properties":{"id":"yondr-toronto-ai-data-center-canada","title":"Yondr — Toronto AI Data Center","url":"https://aidatacenterindex.com/datacenters/yondr-toronto-ai-data-center-canada.html","megawatts":27,"companies":["Yondr Group"],"country":"Canada","status":"under_construction","energy_type":"Unknown","ai_focus":"Unknown"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[35.0104,31.898]},"properties":{"id":"nebius-megaor-national-ai-data-center-israel","title":"Nebius–Mega Or National AI Data Center (Israel)","url":"https://aidatacenterindex.com/datacenters/nebius-megaor-national-ai-data-center-israel.html","megawatts":25,"companies":["Nebius","Mega Or"],"country":"Israel","status":"under_construction","energy_type":"Grid (Israel Electric Corporation)","ai_focus":"Training & HPC (national AI infrastructure)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[103.706,1.321]},"properties":{"id":"equinix-sg6-singapore-ai-data-center","title":"Equinix — SG6 Singapore AI Data Center","url":"https://aidatacenterindex.com/datacenters/equinix-sg6-singapore-ai-data-center.html","megawatts":20,"companies":["Equinix"],"country":"Singapore","status":"under_construction","energy_type":"Renewable","ai_focus":"Unknown"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[23.915,37.962]},"properties":{"id":"microsoft-greece-ai-region-athens","title":"Microsoft — Greece AI Region (Athens)","url":"https://aidatacenterindex.com/datacenters/microsoft-greece-ai-region-athens.html","megawatts":20,"companies":["Microsoft"],"country":"Greece","status":"under_construction","energy_type":"Unknown","ai_focus":"General Cloud"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[69.24,41.299]},"properties":{"id":"datavolt-tashkent-ai-data-center-uzbekistan","title":"DataVolt — Tashkent AI Data Center","url":"https://aidatacenterindex.com/datacenters/datavolt-tashkent-ai-data-center-uzbekistan.html","megawatts":12,"companies":["DataVolt (Saudi Arabia)"],"country":"Uzbekistan","status":"under_construction","energy_type":"Unknown","ai_focus":"Unknown"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[3.3491,6.6059]},"properties":{"id":"mtn-ai-data-center-nigeria","title":"MTN AI Data Center (Nigeria)","url":"https://aidatacenterindex.com/datacenters/mtn-ai-data-center-nigeria.html","megawatts":9,"companies":["MTN Group","Genova (MTN AI infrastructure)"],"country":"Nigeria","status":"under_construction","energy_type":"Grid with on-site backup generation","ai_focus":"AI cloud & co-location services"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[28.0473,-26.2041]},"properties":{"id":"cassava-ai-data-center-south-africa","title":"Cassava AI Data Center (South Africa)","url":"https://aidatacenterindex.com/datacenters/cassava-ai-data-center-south-africa.html","megawatts":null,"companies":["Cassava Technologies","Africa Data Centres","NVIDIA"],"country":"South Africa","status":"under_construction","energy_type":"Grid (with renewable mix)","ai_focus":"AI training & inference \"factory\""}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-80.763,41.171]},"properties":{"id":"microsoft-lordstown-ohio-stargate","title":"Stargate Lordstown Data Center (Ohio)","url":"https://aidatacenterindex.com/datacenters/microsoft-lordstown-ohio-stargate.html","megawatts":null,"companies":["SoftBank","OpenAI","Oracle"],"country":"United States","status":"under construction / preparation work underway","energy_type":"Facility-level power source or procurement not disclosed","ai_focus":"Stargate high-performance AI compute; facility-specific workload split not disclosed"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[54.3773,24.4539]},"properties":{"id":"openai-g42-abu-dhabi-ai-megacluster","title":"OpenAI / G42 Stargate UAE Cluster","url":"https://aidatacenterindex.com/datacenters/openai-g42-abu-dhabi-ai-megacluster.html","megawatts":null,"companies":["OpenAI","G42","Khazna Data Centers","Oracle","NVIDIA","Cisco","SoftBank Group"],"country":"United Arab Emirates","status":"under construction / first 200 MW expected in 2026","energy_type":"Unknown facility-specific energy procurement; cluster sits within the UAE-US AI Campus power envelope","ai_focus":"Training and inference cluster for OpenAI workloads and UAE sovereign AI capability"}}]}