{"generated_at":"2026-07-12T03:07:34.905Z","license":"CC BY 4.0","taxonomy":{"type":"status","name":"Under Construction","slug":"under-construction","item_count":71,"total_megawatts":36621},"items":[{"id":"g42-uae-us-ai-campus-abu-dhabi","title":"G42 “Stargate” UAE–US AI Campus (Abu Dhabi)","url":"https://aidatacenterindex.com/datacenters/g42-uae-us-ai-campus-abu-dhabi.html","megawatts":5000,"companies":["G42","Khazna Data Centers","OpenAI","Oracle","NVIDIA","Cisco","SoftBank Group"],"country":"United Arab Emirates","region":"Abu Dhabi","city":"Abu Dhabi","status":"under construction / first 200 MW Stargate UAE cluster expected in 2026","energy_type":"Abu Dhabi grid and new infrastructure power context; facility-specific procurement mix not disclosed","ai_focus":"Sovereign AI-grade compute, training, inference, and regional AI cloud services","start_year":2026,"lat":24.4539,"lng":54.3773,"sources":["https://www.g42.ai/resources/news/g42-lead-consortium-us-partners-build-5gw-uae-us-ai-campus","https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae","https://openai.com/index/introducing-stargate-uae/","https://www.uae-embassy.org/news/uae-us-presidents-attend-unveiling-phase-1-new-5gw-ai-campus-abu-dhabi","https://www.datacenterdynamics.com/en/news/us-and-uae-plan-to-build-5gw-ai-data-center-campus-run-by-g42-and-american-hyperscalers/"]},{"id":"meta-hyperion-ai-data-center-louisiana","title":"Meta Hyperion AI Data Center (Louisiana)","url":"https://aidatacenterindex.com/datacenters/meta-hyperion-ai-data-center-louisiana.html","megawatts":5000,"companies":["Meta","Entergy Louisiana"],"country":"United States","region":"Richland Parish, Louisiana","city":"Rayville","status":"under construction; future 5 GW expansion not yet delivered","energy_type":"Gas generation, transmission, storage, renewable matching, nuclear uprates/exploration","ai_focus":"AI training infrastructure for future open-source large language models","start_year":2024,"lat":32.417,"lng":-91.517,"sources":["https://datacenters.atmeta.com/richland-parish-data-center/","https://www.entergy.com/news/entergy-louisiana-announces-a-new-agreement-with-meta-that-will-deliver-an-additional-2b-in-customer-savings","https://www.opportunitylouisiana.gov/news/meta-selects-northeast-louisiana-as-site-of-10-billion-artificial-intelligence-optimized-data-center-governor-jeff-landry-calls-investment-a-new-chapter-for-state","https://techcrunch.com/2025/07/14/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center/"]},{"id":"microsoft-project-fairwater-wisconsin","title":"Microsoft Project Fairwater (Mount Pleasant, Wisconsin)","url":"https://aidatacenterindex.com/datacenters/microsoft-project-fairwater-wisconsin.html","megawatts":3300,"companies":["Microsoft","NVIDIA"],"country":"United States","region":"Mount Pleasant, Wisconsin","city":"Mount Pleasant","status":"startup activity and equipment bring-up reported in May 2026; full campus buildout not complete","energy_type":"Grid supply with carbon-free energy matching and 250 MW solar support","ai_focus":"AI training datacenter for frontier-model workloads","start_year":2024,"lat":42.723,"lng":-87.872,"sources":["https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/","https://epoch.ai/data-insights/fairwater-power-usage","https://www.datacenterdynamics.com/en/news/microsoft-ceo-says-fairwater-data-center-site-is-going-live-ahead-of-schedule/","https://www.wpr.org/news/microsoft-hired-375-people-for-mount-pleasant-data-center"]},{"id":"xai-gigascale-data-center-tennessee-mississippi","title":"xAI Colossus / MACROHARDRR Greater Memphis AI Campus","url":"https://aidatacenterindex.com/datacenters/xai-gigascale-data-center-tennessee-mississippi.html","megawatts":2000,"companies":["xAI"],"country":"United States","region":"Greater Memphis / Southaven xAI region","city":"","status":"Colossus operational; Southaven MACROHARDRR expansion and power context still developing","energy_type":"Gas-fired self-generation and utility/grid power context; regulatory status disputed","ai_focus":"Training compute for xAI models and Grok across the Greater Memphis/Southaven region","start_year":2024,"lat":null,"lng":null,"sources":["https://x.ai/colossus","https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","https://mississippi.org/news/tech-leader-xai-investing-more-than-20-billion-in-southaven/","https://apnews.com/article/musk-xai-data-center-memphis-pollution-naacp-0e981ca0508d7e4144662392d9d66ab2","https://www.selc.org/news/xai-built-an-illegal-power-plant-to-power-its-data-center/"]},{"id":"aws-ai-innovation-campuses-pennsylvania","title":"AWS Pennsylvania AI Innovation Campuses and Susquehanna PPA","url":"https://aidatacenterindex.com/datacenters/aws-ai-innovation-campuses-pennsylvania.html","megawatts":1920,"companies":["Amazon Web Services","Talen Energy"],"country":"United States","region":"Pennsylvania","city":"","status":"under construction at Susquehanna-adjacent campus with additional planned Pennsylvania campuses","energy_type":"Susquehanna nuclear PPA delivered through PJM / front-of-meter grid structure","ai_focus":"AWS cloud computing and AI innovation campuses","start_year":2025,"lat":null,"lng":null,"sources":["https://www.aboutamazon.com/news/aws/amazon-pennsylvania-investment-cloud-infrastructure-ai-innovation","https://dced.pa.gov/newsroom/governor-josh-shapiro-announces-amazon-plans-to-invest-20-billion-in-pennsylvania-for-ai-infrastructure-in-largest-capital-investment-in-commonwealth-history/","https://www.sec.gov/Archives/edgar/data/1622536/000162828025030559/a20250611pressreleasebusin.htm","https://www.talenenergy.com/powering-data/","https://www.utilitydive.com/news/talen-amazon-aws-susquehanna-nuclear-data-centert/750440/"]},{"id":"elea-rio-ai-city-brazil","title":"Elea Rio AI City","url":"https://aidatacenterindex.com/datacenters/elea-rio-ai-city-brazil.html","megawatts":1500,"companies":["Elea Data Centers"],"country":"Brazil","region":"Rio de Janeiro","city":"Rio de Janeiro","status":"RJO1 operational; phased Rio AI City first-phase buildout in progress with RJO2 delivery beginning in 2026","energy_type":"Certified renewable energy capacity for phased Rio AI City buildout","ai_focus":"AI and cloud workloads across a phased Rio data-center district","start_year":2025,"lat":-22.906,"lng":-43.172,"sources":["https://eleadatacenters.com/en/rio-ai-city/","https://www.prnewswire.com/news-releases/elea-announces-rio-ai-city-a-landmark-brazilian-data-center-project-with-capacity-up-to-3-2-gw-of-renewable-energy-supporting-ai-growth-302449289.html","https://eleadatacenters.com/en/"]},{"id":"vantage-texas-mega-campus-shackelford","title":"Vantage Frontier Shackelford County AI Campus","url":"https://aidatacenterindex.com/datacenters/vantage-texas-mega-campus-shackelford.html","megawatts":1400,"companies":["Vantage Data Centers"],"country":"United States","region":"Shackelford County, Texas","city":"","status":"construction began before August 2025 announcement; first building scheduled for H2 2026","energy_type":"Power feeds and any site-specific behind-the-meter generation mix not fully isolated in opened Frontier sources","ai_focus":"AI training and GPU compute workloads","start_year":2025,"lat":null,"lng":null,"sources":["https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/","https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx","https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/","https://vantage-dc.com/news/vantage-data-centers-and-voltagrid-establish-partnership-to-deploy-more-than-one-gigawatt-of-power-generation/"]},{"id":"openai-stargate-data-center-texas","title":"Stargate Abilene AI Data Center Campus","url":"https://aidatacenterindex.com/datacenters/openai-stargate-data-center-texas.html","megawatts":1200,"companies":["OpenAI","Oracle","Crusoe","Lancium","NVIDIA"],"country":"United States","region":"Abilene, Texas","city":"Abilene","status":"first phase live; full 1.2 GW campus under construction","energy_type":"Grid interconnection with battery, solar, wind, backup gas turbines, and closed-loop cooling","ai_focus":"AI training and inference workloads on Oracle Cloud Infrastructure","start_year":2025,"lat":32.449,"lng":-99.733,"sources":["https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live","https://openai.com/index/five-new-stargate-sites/","https://www.oracle.com/se/news/announcement/ai-world-oracle-unveils-next-generation-oci-zettascale10-cluster-for-ai-2025-10-14/"]},{"id":"adani-google-vizag-india-ai-campus","title":"Google / AdaniConneX Visakhapatnam AI Hub","url":"https://aidatacenterindex.com/datacenters/adani-google-vizag-india-ai-campus.html","megawatts":1000,"companies":["Google","Google Cloud","AdaniConneX","Adani Enterprises","Nxtra by Airtel"],"country":"India","region":"Andhra Pradesh / Visakhapatnam","city":"Visakhapatnam","status":"under construction; Google broke ground on April 28, 2026","energy_type":"Long-term clean-energy strategy and new clean-energy supply to the grid; not a delivered facility mix yet","ai_focus":"Gigawatt-scale AI hub for advanced AI services, large-scale cloud infrastructure, and India AI ecosystem growth","start_year":2026,"lat":17.687,"lng":83.218,"sources":["https://www.googlecloudpresscorner.com/2026-04-28-Google-Breaks-Ground-on-India-AI-Hub%2C-Launching-a-National-Industrial-Ecosystem-Alongside-Indias-Digital-Infrastructure-Milestone","https://blog.google/intl/en-in/google-ai-hub-scaling-indias-ai-infrastructure-and-community-impact/","https://www.adani.com/newsroom/media-releases/adani-and-google-partner-to-build-indias-largest-data-centre-campus-in-visakhapatnam"]},{"id":"ekibastuz-ai-data-center-valley-kazakhstan","title":"Data Center Valley Ekibastuz AI Campus","url":"https://aidatacenterindex.com/datacenters/ekibastuz-ai-data-center-valley-kazakhstan.html","megawatts":1000,"companies":["Kazakhstan Ministry of AI and Digital Development","Kazakhtelecom"],"country":"Kazakhstan","region":"Pavlodar Region","city":"Ekibastuz","status":"officially described as in active implementation phase","energy_type":"State-backed energy-capacity program in Ekibastuz; exact generation mix not publicly selected.","ai_focus":"Kazakhstan state-backed AI and data-center valley program","start_year":2026,"lat":51.724,"lng":75.313,"sources":["https://primeminister.kz/en/news/olzhas-bektenov-holds-meeting-on-implementation-of-presidential-instructions-within-the-data-center-valley-project-31118","https://astanatimes.com/2026/02/kazakhstan-advances-1-gw-data-center-valley-project-in-ekibastuz/"]},{"id":"meta-el-paso-ai-mega-campus-texas","title":"Meta El Paso AI Data Center","url":"https://aidatacenterindex.com/datacenters/meta-el-paso-ai-mega-campus-texas.html","megawatts":1000,"companies":["Meta"],"country":"United States","region":"El Paso, Texas","city":"El Paso","status":"under construction; Meta says the site broke ground in 2025","energy_type":"Meta says data-center electricity use will be matched with 100% clean and renewable energy and that it has more than 5,000 MW of clean-energy projects under contract in Texas.","ai_focus":"Meta AI-optimized data center campus for current and future AI workloads","start_year":2025,"lat":31.761,"lng":-106.485,"sources":["https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/","https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/","https://datacenters.atmeta.com/2025/10/hello-el-paso/"]},{"id":"meta-lebanon-indiana-ai-campus","title":"Meta Lebanon AI Data Center","url":"https://aidatacenterindex.com/datacenters/meta-lebanon-indiana-ai-campus.html","megawatts":1000,"companies":["Meta"],"country":"United States","region":"Lebanon, Indiana","city":"Lebanon","status":"breaking ground announced February 2026","energy_type":"Meta says it will match 100% of the new data center's energy use with clean energy and use a closed-loop liquid-cooling system.","ai_focus":"Meta AI-optimized data center campus for current and future AI workloads","start_year":2026,"lat":40.052,"lng":-86.471,"sources":["https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/"]},{"id":"meta-project-prometheus-ohio-ai-campus","title":"Meta Prometheus AI Supercluster (New Albany, Ohio)","url":"https://aidatacenterindex.com/datacenters/meta-project-prometheus-ohio-ai-campus.html","megawatts":1000,"companies":["Meta"],"country":"United States","region":"New Albany, Ohio","city":"New Albany","status":"New Albany campus active and expanding; Prometheus described as a gigawatt-scale 2026 AI supercluster buildout","energy_type":"On-site gas generation reporting plus Meta renewable matching; campus-specific nuclear supply not isolated","ai_focus":"AI training supercluster","start_year":2025,"lat":40.081,"lng":-82.808,"sources":["https://datacenters.atmeta.com/ohio-new-albany/","https://www.datacenterdynamics.com/en/news/meta-to-invest-hundreds-of-billions-of-dollars-into-compute-to-build-superintelligence-with-several-multi-gw-data-center-clusters/","https://www.businessinsider.com/meta-mark-zuckerberg-building-ai-data-centers-tents-catch-up-2025-7","https://newsletter.semianalysis.com/p/meta-superintelligence-leadership-compute-talent-and-data","https://spectrumnews1.com/oh/columbus/news/2025/11/13/meta-gigawatt-data-center-new-albany-"]},{"id":"microsoft-port-washington-wisconsin-stargate","title":"Vantage Port Washington Lighthouse Stargate Campus","url":"https://aidatacenterindex.com/datacenters/microsoft-port-washington-wisconsin-stargate.html","megawatts":902,"companies":["Vantage Data Centers","OpenAI","Oracle"],"country":"United States","region":"Port Washington, Wisconsin","city":"Port Washington","status":"groundbreaking reported December 2025; scheduled for completion in 2028","energy_type":"Vantage says 70% of the campus power will come from zero-emission resources including solar, wind, and battery storage, with the remaining energy matched annually with renewable purchases.","ai_focus":"Stargate AI capacity for OpenAI and Oracle workloads","start_year":2025,"lat":43.387,"lng":-87.876,"sources":["https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin","https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/","https://www.datacenterknowledge.com/data-center-construction/vantage-breaks-ground-on-15b-stargate-campus-in-wisconsin"]},{"id":"microsoft-india-ai-infrastructure-hyderabad-pune","title":"Microsoft India South Central Cloud Region Program","url":"https://aidatacenterindex.com/datacenters/microsoft-india-ai-infrastructure-hyderabad-pune.html","megawatts":600,"companies":["Microsoft"],"country":"India","region":"Hyderabad / India South Central cloud-region program","city":"","status":"under construction / planned cloud-region program; Microsoft says India South Central is set to go live in mid-2026","energy_type":"Unknown facility-specific energy mix; renewable claims not selected for this program record","ai_focus":"Sovereign-ready Microsoft cloud and AI infrastructure, Azure regions, AI platforms, and hyperscale infrastructure","start_year":2026,"lat":null,"lng":null,"sources":["https://news.microsoft.com/source/asia/2025/12/09/microsoft-invests-us17-5-billion-in-india-to-drive-ai-diffusion-at-population-scale/","https://news.microsoft.com/en-in/microsoft-india-hyderabad-data-center-region-intent/","https://www.datacenterdynamics.com/en/news/microsoft-and-aws-to-increase-data-center-presence-in-telangana/"]},{"id":"bce-national-ai-data-center-initiative-canada","title":"Bell AI Fabric Data Center Network (British Columbia)","url":"https://aidatacenterindex.com/datacenters/bce-national-ai-data-center-initiative-canada.html","megawatts":500,"companies":["Bell Canada (BCE)"],"country":"Canada","region":"British Columbia","city":"Kamloops & Merritt","status":"under_construction","energy_type":"Grid (Hydroelectric)","ai_focus":"AI Inference & Training","start_year":2025,"lat":50.667,"lng":-120.319,"sources":["https://www.bell.ca/Corporate/Media_Centre/News_Releases/Bell-invests-in-AI-infrastructure-to-create-Canadas-largest-AI-supercluster-in-Kamloops","https://datacenternews.ca/news/bell-canada-unveils-ambitious-500mw-ai-fabric-data-center-network"]},{"id":"bytedance-johor-ai-data-center-malaysia","title":"ByteDance — Johor AI Data Center","url":"https://aidatacenterindex.com/datacenters/bytedance-johor-ai-data-center-malaysia.html","megawatts":500,"companies":["ByteDance (TikTok)"],"country":"Malaysia","region":"Johor","city":"Kulai","status":"under_construction","energy_type":"Unknown","ai_focus":"Training","start_year":null,"lat":1.65,"lng":103.61,"sources":["https://www.techinasia.com/bytedance-to-invest-2-billion-in-malaysia-ai-hub"]},{"id":"digital-edge-cgk-ai-mega-campus-indonesia","title":"Digital Edge — CGK AI Mega Campus","url":"https://aidatacenterindex.com/datacenters/digital-edge-cgk-ai-mega-campus-indonesia.html","megawatts":500,"companies":["Digital Edge"],"country":"Indonesia","region":"West Java","city":"Bekasi","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":-6.235,"lng":106.982,"sources":["https://www.digitaledgedc.com/digital-edge-announces-massive-ai-ready-campus-in-jakarta/"]},{"id":"meta-eagle-mountain-utah-ai-campus","title":"Meta — Eagle Mountain, Utah AI Data Center Campus","url":"https://aidatacenterindex.com/datacenters/meta-eagle-mountain-utah-ai-campus.html","megawatts":500,"companies":["Meta"],"country":"United States","region":"Utah","city":"Eagle Mountain","status":"under_construction","energy_type":"Renewable","ai_focus":"Training (Llama, Meta AI)","start_year":2023,"lat":40.313,"lng":-111.999,"sources":["https://about.fb.com/news/2024/02/meta-data-center-utah/","https://www.sltrib.com/news/2023/04/19/meta-eyes-eagle-mountain-utah/"]},{"id":"hexagon-data-center-riyadh","title":"Hexagon Data Center — Riyadh","url":"https://aidatacenterindex.com/datacenters/hexagon-data-center-riyadh.html","megawatts":480,"companies":["SDAIA (Saudi Data & AI Authority)"],"country":"Saudi Arabia","region":"Riyadh","city":"Riyadh","status":"under_construction","energy_type":"Unknown","ai_focus":"Unknown","start_year":null,"lat":24.713,"lng":46.675,"sources":["https://www.arabianbusiness.com/industries/technology/saudi-arabia-breaks-ground-on-worlds-largest-government-owned-data-center"]},{"id":"applied-digital-ellendale-north-dakota-gpu-cloud","title":"Applied Digital Polaris Forge 1 - Ellendale AI Factory","url":"https://aidatacenterindex.com/datacenters/applied-digital-ellendale-north-dakota-gpu-cloud.html","megawatts":400,"companies":["Applied Digital","CoreWeave"],"country":"United States","region":"North Dakota","city":"Ellendale","status":"staged campus under construction","energy_type":"Renewable-power design intent and cool-climate efficiency","ai_focus":"AI and HPC infrastructure for CoreWeave","start_year":2025,"lat":46.001,"lng":-98.525,"sources":["https://ir.applieddigital.com/news-events/press-releases/detail/123/applied-digital-announces-250mw-ai-data-center-lease-with","https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-finalizes-additional-150mw-lease-with"]},{"id":"bytedance-thailand-ai-data-hub","title":"ByteDance — Thailand AI Data Hub","url":"https://aidatacenterindex.com/datacenters/bytedance-thailand-ai-data-hub.html","megawatts":400,"companies":["ByteDance","TikTok"],"country":"Thailand","region":"Bangkok / Chonburi","city":"Bangkok","status":"under_construction","energy_type":"Mixed","ai_focus":"Inference (TikTok AI, Content Recommendation)","start_year":2025,"lat":13.7563,"lng":100.5018,"sources":["https://www.reuters.com/technology/tiktok-invest-38-bln-thailand-data-centers-2024-06-12/","https://www.scmp.com/tech/big-tech/article/3266345/bytedance-plans-massive-investment-thailand-data-center-hub"]},{"id":"airtrunk-tok1-ai-expansion-tokyo","title":"AirTrunk — TOK1 AI Expansion (Tokyo)","url":"https://aidatacenterindex.com/datacenters/airtrunk-tok1-ai-expansion-tokyo.html","megawatts":300,"companies":["AirTrunk"],"country":"Japan","region":"Chiba","city":"Inzai","status":"under_construction","energy_type":"Renewable","ai_focus":"General Cloud","start_year":null,"lat":35.833,"lng":140.133,"sources":["https://airtrunk.com/airtrunk-secures-landmark-green-loan-for-japan-expansion/"]},{"id":"bulk-data-centers-n01-ai-campus-norway","title":"Bulk Data Centers — N01 AI Campus","url":"https://aidatacenterindex.com/datacenters/bulk-data-centers-n01-ai-campus-norway.html","megawatts":300,"companies":["Bulk Data Centers"],"country":"Norway","region":"Agder","city":"Kristiansand","status":"under_construction","energy_type":"Hydroelectric","ai_focus":"Training","start_year":null,"lat":58.147,"lng":7.995,"sources":["https://bulkinfrastructure.com/news/bulk-data-centers-unveils-300mw-expansion-at-n01-campus"]},{"id":"microsoft-aragon-ai-campus-spain","title":"Microsoft — Aragón AI Campus","url":"https://aidatacenterindex.com/datacenters/microsoft-aragon-ai-campus-spain.html","megawatts":300,"companies":["Microsoft"],"country":"Spain","region":"Aragón","city":"Zaragoza","status":"under_construction","energy_type":"Renewable","ai_focus":"Unknown","start_year":null,"lat":41.656,"lng":-0.877,"sources":["https://www.mordorintelligence.com/industry-reports/spain-data-center-market"]},{"id":"softbank-tomakomai-ai-data-center-japan","title":"SoftBank Tomakomai AI Data Center (Japan)","url":"https://aidatacenterindex.com/datacenters/softbank-tomakomai-ai-data-center-japan.html","megawatts":300,"companies":["SoftBank Corp.","NVIDIA"],"country":"Japan","region":"Tomakomai, Hokkaido","city":"Tomakomai","status":"under_construction","energy_type":"100% renewable (local wind/cool climate)","ai_focus":"Sovereign AI (NVIDIA Blackwell, AI-RAN)","start_year":2026,"lat":42.636,"lng":141.603,"sources":["https://nvidianews.nvidia.com/news/softbank-nvidia-sovereign-ai-japan","https://www.softbank.jp/en/corp/news/press/sbkk/2024/20241113_01/"]},{"id":"ecodatacenter-borlange-ai-mega-campus-sweden","title":"EcoDataCenter — Borlänge AI Mega Campus","url":"https://aidatacenterindex.com/datacenters/ecodatacenter-borlange-ai-mega-campus-sweden.html","megawatts":250,"companies":["EcoDataCenter"],"country":"Sweden","region":"Dalarna","city":"Borlänge","status":"under_construction","energy_type":"Renewable","ai_focus":"Training","start_year":null,"lat":60.484,"lng":15.434,"sources":["https://ecodatacenter.tech/ecodatacenter-starts-construction-of-one-of-the-largest-data-center-campuses-in-the-nordics/"]},{"id":"google-skien-ai-campus-norway","title":"Google — Skien AI Campus","url":"https://aidatacenterindex.com/datacenters/google-skien-ai-campus-norway.html","megawatts":240,"companies":["Google"],"country":"Norway","region":"Telemark","city":"Skien","status":"under_construction","energy_type":"Hydroelectric","ai_focus":"Training and Inference","start_year":null,"lat":59.209,"lng":9.608,"sources":["https://www.mordorintelligence.com/industry-reports/norway-data-center-market"]},{"id":"stargate-norway-narvik-ai-gigafactory","title":"Stargate Norway — Narvik AI Gigafactory","url":"https://aidatacenterindex.com/datacenters/stargate-norway-narvik-ai-gigafactory.html","megawatts":230,"companies":["OpenAI, Nscale & Aker"],"country":"Norway","region":"Nordland","city":"Narvik","status":"under_construction","energy_type":"Hydroelectric","ai_focus":"Training","start_year":null,"lat":68.438,"lng":17.427,"sources":["https://www.telecoms.com/cloud-computing/openai-nscale-and-aker-to-build-230mw-ai-data-centre-in-norway"]},{"id":"meta-montgomery-ai-expansion-alabama","title":"Meta — Montgomery AI Expansion","url":"https://aidatacenterindex.com/datacenters/meta-montgomery-ai-expansion-alabama.html","megawatts":227,"companies":["Meta"],"country":"United States","region":"Alabama","city":"Montgomery","status":"under_construction","energy_type":"Renewable","ai_focus":"Training and Inference","start_year":null,"lat":32.366,"lng":-86.299,"sources":["https://www.madeinalabama.com/2024/05/meta-plans-800-million-expansion-at-montgomery-data-center/"]},{"id":"vantage-nevada-ai-data-center","title":"Vantage Nevada AI Data Center (NV1)","url":"https://aidatacenterindex.com/datacenters/vantage-nevada-ai-data-center.html","megawatts":224,"companies":["Vantage Data Centers"],"country":"United States","region":"Clark County, Nevada","city":"Henderson","status":"under_construction","energy_type":"Solar (Utility PPA)","ai_focus":"Hyperscale Training and Inference","start_year":2025,"lat":36.039,"lng":-114.982,"sources":["https://vantage-dc.com/news/vantage-breaks-ground-on-nevada-campus"]},{"id":"google-cloud-malaysia-ai-data-center","title":"Google Cloud Malaysia AI Data Center (Johor Bahru)","url":"https://aidatacenterindex.com/datacenters/google-cloud-malaysia-ai-data-center.html","megawatts":220,"companies":["Google"],"country":"Malaysia","region":"Johor Bahru, Malaysia","city":"Johor Bahru","status":"under_construction","energy_type":"Grid with renewable energy targets","ai_focus":"Inference (Gemini API, Vertex AI) and cloud workloads","start_year":2024,"lat":1.4927,"lng":103.7414,"sources":["https://cloud.google.com/blog/topics/infrastructure/google-cloud-to-invest-2-billion-in-malaysia"]},{"id":"dc-blox-conyers-ai-campus-georgia","title":"DC BLOX — Conyers AI Campus","url":"https://aidatacenterindex.com/datacenters/dc-blox-conyers-ai-campus-georgia.html","megawatts":216,"companies":["DC BLOX"],"country":"United States","region":"Georgia","city":"Conyers","status":"under_construction","energy_type":"Unknown","ai_focus":"Inference","start_year":null,"lat":33.667,"lng":-84.017,"sources":["https://www.dcblox.com/news/dc-blox-announces-216mw-campus-in-conyers-georgia/"]},{"id":"humain-ai-data-centers-saudi-arabia","title":"Humain AI Data Centers (Saudi Arabia)","url":"https://aidatacenterindex.com/datacenters/humain-ai-data-centers-saudi-arabia.html","megawatts":200,"companies":["Humain","Amazon Web Services","AMD"],"country":"Saudi Arabia","region":"Riyadh & Dammam","city":"Riyadh","status":"under_construction","energy_type":"Grid (KSA utility power)","ai_focus":"Training & Inference (national AI cloud)","start_year":2026,"lat":24.7,"lng":46.72,"sources":["https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/"]},{"id":"microsoft-kemps-creek-sydney-hyperscale-campus","title":"Microsoft — Kemps Creek AI Campus (Sydney)","url":"https://aidatacenterindex.com/datacenters/microsoft-kemps-creek-sydney-hyperscale-campus.html","megawatts":190,"companies":["Microsoft"],"country":"Australia","region":"New South Wales","city":"Sydney","status":"under_construction","energy_type":"Unknown","ai_focus":"Unknown","start_year":null,"lat":-33.847,"lng":150.781,"sources":["https://www.itnews.com.au/news/microsoft-plans-190mw-data-centre-for-western-sydney-600321"]},{"id":"sines-4-0-sin02-ai-gigafactory-portugal","title":"SINES 4.0 — SIN02 AI Gigafactory","url":"https://aidatacenterindex.com/datacenters/sines-4-0-sin02-ai-gigafactory-portugal.html","megawatts":180,"companies":["Start Campus"],"country":"Portugal","region":"Alentejo","city":"Sines","status":"under_construction","energy_type":"Renewable","ai_focus":"Training","start_year":null,"lat":37.956,"lng":-8.874,"sources":["https://www.capacitymedia.com/article/start-campus-sines-4-0-ai-expansion"]},{"id":"nextdc-m4-melbourne-ai-factory","title":"NEXTDC — M4 Melbourne 'AI Factory'","url":"https://aidatacenterindex.com/datacenters/nextdc-m4-melbourne-ai-factory.html","megawatts":160,"companies":["NEXTDC"],"country":"Australia","region":"Victoria","city":"Melbourne","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":-37.828,"lng":144.912,"sources":["https://www.nextdc.com/blog/nextdc-unveils-m4-melbourne-ai-factory"]},{"id":"odata-qr03-queretaro-ai-campus-mexico","title":"ODATA — QR03 Querétaro AI Campus","url":"https://aidatacenterindex.com/datacenters/odata-qr03-queretaro-ai-campus-mexico.html","megawatts":150,"companies":["ODATA (Aligned Data Centers)"],"country":"Mexico","region":"Querétaro","city":"El Marqués","status":"under_construction","energy_type":"Unknown","ai_focus":"General Cloud","start_year":null,"lat":20.561,"lng":-100.317,"sources":["https://www.capacitymedia.com/article/odata-announces-largest-single-campus-in-mexico"]},{"id":"softbank-sakai-ai-data-center-osaka","title":"SoftBank — Sakai AI Data Center","url":"https://aidatacenterindex.com/datacenters/softbank-sakai-ai-data-center-osaka.html","megawatts":150,"companies":["SoftBank"],"country":"Japan","region":"Osaka","city":"Sakai","status":"under_construction","energy_type":"Unknown","ai_focus":"General Cloud","start_year":null,"lat":34.573,"lng":135.483,"sources":["https://group.softbank/en/news/press/20240510"]},{"id":"edgnex-jakarta-ai-data-center-indonesia","title":"EDGNEX — Jakarta AI Data Center","url":"https://aidatacenterindex.com/datacenters/edgnex-jakarta-ai-data-center-indonesia.html","megawatts":144,"companies":["EDGNEX by DAMAC"],"country":"Indonesia","region":"Jakarta","city":"Jakarta","status":"under_construction","energy_type":"Unknown","ai_focus":"General Cloud","start_year":null,"lat":-6.208,"lng":106.845,"sources":["https://www.rcrwireless.com/20240122/edgnex-by-damac-to-build-144mw-data-center-in-jakarta"]},{"id":"viettel-tan-phu-trung-ai-data-center-vietnam","title":"Viettel — Tan Phu Trung AI Data Center","url":"https://aidatacenterindex.com/datacenters/viettel-tan-phu-trung-ai-data-center-vietnam.html","megawatts":140,"companies":["Viettel Group"],"country":"Vietnam","region":"Ho Chi Minh City","city":"Ho Chi Minh City","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":10.912,"lng":106.529,"sources":["https://www.vir.com.vn/viettel-to-build-140mw-data-center-in-tan-phu-trung-industrial-park-110432.html"]},{"id":"odata-bg03-bogota-ai-campus-colombia","title":"ODATA — BG03 Bogotá AI Campus","url":"https://aidatacenterindex.com/datacenters/odata-bg03-bogota-ai-campus-colombia.html","megawatts":120,"companies":["ODATA (Aligned Data Centers)"],"country":"Colombia","region":"Cundinamarca","city":"Bogotá","status":"under_construction","energy_type":"Unknown","ai_focus":"HPC / Supercomputing","start_year":null,"lat":4.609,"lng":-74.081,"sources":["https://www.dataxconnect.com/odata-announces-massive-expansion-in-colombia"]},{"id":"microsoft-markham-ai-megaproject-canada","title":"Microsoft — Markham AI Megaproject","url":"https://aidatacenterindex.com/datacenters/microsoft-markham-ai-megaproject-canada.html","megawatts":112,"companies":["Microsoft"],"country":"Canada","region":"Ontario","city":"Markham","status":"under_construction","energy_type":"Unknown","ai_focus":"Training","start_year":null,"lat":43.856,"lng":-79.337,"sources":["https://www.goranbrelih.com/toronto-data-center-market-report-2025/"]},{"id":"sk-aws-ulsan-ai-data-center-south-korea","title":"SK Group-AWS Ulsan AI Data Center","url":"https://aidatacenterindex.com/datacenters/sk-aws-ulsan-ai-data-center-south-korea.html","megawatts":103,"companies":["SK Group","SK Telecom","SK Broadband","SK Ecoplant","Amazon Web Services"],"country":"South Korea","region":"Ulsan","city":"Ulsan","status":"groundbreaking held August 2025; operations expected from 2027","energy_type":"SK and trade sources describe Ulsan as selected for access to large-scale electricity and SK Gas / SK multi utility LNG combined heat and power infrastructure.","ai_focus":"SK Group and AWS AI Zone data center in Ulsan","start_year":2025,"lat":35.5384,"lng":129.3114,"sources":["https://eng.sk.com/news/sk-group-and-aws-team-up-to-build-cloud-computing-infrastructure-to-support-ai-innovation","https://news.sktelecom.com/214708","https://www.datacenterdynamics.com/en/news/sk-group-and-aws-to-build-ai-data-center-in-ulsan-south-korea/"]},{"id":"khazna-ajman-ai-data-center-uae","title":"Khazna Ajman AI Data Center (UAE)","url":"https://aidatacenterindex.com/datacenters/khazna-ajman-ai-data-center-uae.html","megawatts":100,"companies":["Khazna Data Centers"],"country":"United Arab Emirates","region":"Ajman","city":"Ajman","status":"under_construction","energy_type":"Grid (Etihad Water & Electricity)","ai_focus":"General-Purpose (AI cloud & hyperscale)","start_year":2025,"lat":25.405,"lng":55.514,"sources":["https://www.zawya.com/en/press-release/companies-news/uaes-first-ai-optimized-data-center-and-the-largest-in-its-portfolio-powering-the-nations-drive-toward-ai-leadership-i5ewz49h"]},{"id":"khazna-qaj1-ajman-ai-data-center","title":"Khazna QAJ1 — Ajman AI Data Center","url":"https://aidatacenterindex.com/datacenters/khazna-qaj1-ajman-ai-data-center.html","megawatts":100,"companies":["Khazna Data Centers"],"country":"United Arab Emirates","region":"Ajman","city":"Ajman","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":25.411,"lng":55.435,"sources":["https://khaznadatacenters.com/press-release/khazna-announces-the-uaes-first-ai-optimized-data-center-and-the-largest-in-its-portfolio-powering-the-nations-drive-toward-ai-leadership/","https://khaznadatacenters.com/ar/press-release/khazna-expands-infrastructure-to-accelerate-uaes-leadership-in-artificial-intelligence/","https://uptimeinstitute.com/about-ui/press-releases/khazna-awarded-uptime-tier-iii-certification-of-design-documents-for-ajman-uae-facility"]},{"id":"microsoft-poland-ai-expansion-warsaw","title":"Microsoft — Poland AI Expansion (Warsaw)","url":"https://aidatacenterindex.com/datacenters/microsoft-poland-ai-expansion-warsaw.html","megawatts":100,"companies":["Microsoft"],"country":"Poland","region":"Masovian","city":"Warsaw","status":"under_construction","energy_type":"Unknown","ai_focus":"HPC / Supercomputing","start_year":null,"lat":52.229,"lng":21.012,"sources":["https://techplustrends.com/microsoft-to-expand-poland-cloud-region-with-700m-ai-surge"]},{"id":"nvidia-foxconn-kaohsiung-ai-factory-taiwan","title":"Nvidia & Foxconn — Kaohsiung AI Factory","url":"https://aidatacenterindex.com/datacenters/nvidia-foxconn-kaohsiung-ai-factory-taiwan.html","megawatts":100,"companies":["Foxconn (Hon Hai Technology Group) & NVIDIA"],"country":"Taiwan","region":"Kaohsiung","city":"Kaohsiung","status":"under_construction","energy_type":"Unknown","ai_focus":"HPC / Supercomputing","start_year":null,"lat":22.627,"lng":120.301,"sources":["https://www.businesstimes.com.sg/international/nvidia-foxconn-partner-build-taiwans-largest-ai-supercomputing-centre"]},{"id":"volcengine-bytedance-ai-training-china","title":"Volcengine Inner Mongolia Horinger Computing Center","url":"https://aidatacenterindex.com/datacenters/volcengine-bytedance-ai-training-china.html","megawatts":100,"companies":["ByteDance","Volcengine"],"country":"China","region":"Inner Mongolia","city":"Horinger","status":"construction started in November 2024, with Phase 1 planned for delivery from December 2025","energy_type":"Horinger New Area is positioned as a green computing and AI industry cluster; delivered project energy mix is not fully disclosed.","ai_focus":"Volcengine computing-center infrastructure for large-scale data analysis, storage, and cloud/AI services","start_year":2024,"lat":null,"lng":null,"sources":["https://www.dtdata.cn/news/show/2643.html","https://tjj.huhhot.gov.cn/zwgk/zwgksj/202503/t20250318_1864135.html","https://static.0471tv.org.cn/rb/pc/con/202411/06/content_74222.html","https://www.news.cn/politics/20250530/e5da7c9099b04454a53b00502b5c6fca/c.html"]},{"id":"estruxture-cal-3-hyperscale-data-center-calgary","title":"eStruxture's CAL-3 Hyperscale Data Center (Calgary)","url":"https://aidatacenterindex.com/datacenters/estruxture-cal-3-hyperscale-data-center-calgary.html","megawatts":90,"companies":["eStruxture Data Centres"],"country":"Canada","region":"Western Canada","city":"Balzac","status":"under_construction","energy_type":"Natural Gas (Grid)","ai_focus":"Unknown","start_year":null,"lat":51.213,"lng":-114.008,"sources":["https://www.estruxture.com/press-releases/estruxture-announces-albertas-largest-data-center-introducing-the-groundbreaking-cal-3-facility","https://www.mltaikins.com/insights/alberta-announces-ai-data-centres-strategy-a-100-billion-vision-for-the-future/"]},{"id":"nebius-mega-or-israel-ai-hub","title":"Nebius & Mega Or — Israel AI Hub","url":"https://aidatacenterindex.com/datacenters/nebius-mega-or-israel-ai-hub.html","megawatts":80,"companies":["Nebius & Mega Or"],"country":"Israel","region":"Central District","city":"Beit Shemesh","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":31.747,"lng":34.988,"sources":["https://thetechcapital.com/nebius-mega-or-to-build-80mw-ai-data-center-in-israel"]},{"id":"yotta-d2-greater-noida-ai-supercluster","title":"Yotta D2 / NVIDIA Blackwell AI Supercluster (Greater Noida)","url":"https://aidatacenterindex.com/datacenters/yotta-d2-greater-noida-ai-supercluster.html","megawatts":60,"companies":["Yotta Data Services","NVIDIA"],"country":"India","region":"Uttar Pradesh / Greater Noida","city":"Greater Noida","status":"under construction / planned AI supercluster; expected go-live by August 2026","energy_type":"Unknown facility-specific delivered energy mix; opened sources emphasize high-density AI infrastructure but do not disclose procurement terms for D2","ai_focus":"Blackwell Ultra GPU supercluster, NVIDIA DGX Cloud, Shakti Cloud, sovereign AI training and inference","start_year":2026,"lat":28.474,"lng":77.503,"sources":["https://yotta.com/press-releases/yotta-to-deploy-20000-nvidia-blackwell-ultra-gpus/","https://www.nvidia.com/en-us/case-studies/yotta-built-india-sovereign-ai-infrastructure-shakti-cloud/","https://www.datacenterdynamics.com/en/news/yotta-data-services-to-invest-2bn-in-20000-nvidia-blackwell-deployment-in-noida-india/"]},{"id":"sberbank-balakovo-ai-data-center-russia","title":"Sberbank — Balakovo AI Data Center","url":"https://aidatacenterindex.com/datacenters/sberbank-balakovo-ai-data-center-russia.html","megawatts":50,"companies":["Sberbank (Sber)"],"country":"Russia","region":"Saratov Oblast","city":"Balakovo","status":"under_construction","energy_type":"Unknown","ai_focus":"Unknown","start_year":null,"lat":52.03,"lng":47.8,"sources":["https://www.developingtelecoms.com/it-services/data-centres/16543-sberbank-to-open-massive-data-centre-in-balakovo.html"]},{"id":"tiktok-project-clover-eu-data-center-norway","title":"TikTok / ByteDance — Project Clover EU Data Center (Norway)","url":"https://aidatacenterindex.com/datacenters/tiktok-project-clover-eu-data-center-norway.html","megawatts":50,"companies":["ByteDance","TikTok"],"country":"Norway","region":"Hamar","city":"Hamar","status":"under_construction","energy_type":"Renewable","ai_focus":"Inference (TikTok content delivery, EU user data storage)","start_year":2024,"lat":60.795,"lng":11.068,"sources":["https://newsroom.tiktok.com/en-eu/project-clover-update","https://www.ft.com/content/tiktok-project-clover-europe-data-center"]},{"id":"equinix-da12-dallas-texas","title":"Equinix DA12 Dallas (Texas)","url":"https://aidatacenterindex.com/datacenters/equinix-da12-dallas-texas.html","megawatts":40,"companies":["Equinix"],"country":"United States","region":"Dallas","city":"Dallas","status":"under_construction","energy_type":"Renewable (Utility PPA)","ai_focus":"High-Density AI and Machine Learning","start_year":2026,"lat":32.818,"lng":-96.84,"sources":["https://www.equinix.com/newsroom/press-releases/2026/02/equinix-dallas-da12-data-center-investment"]},{"id":"nvidia-ai-factory-finland-helsinki","title":"NVIDIA AI Factory — Helsinki, Finland","url":"https://aidatacenterindex.com/datacenters/nvidia-ai-factory-finland-helsinki.html","megawatts":40,"companies":["NVIDIA","CSC (Finnish IT Center for Science)"],"country":"Finland","region":"Uusimaa","city":"Helsinki","status":"under_construction","energy_type":"Hydroelectric (100% renewable)","ai_focus":"Sovereign AI, Nordic AI research, government AI","start_year":null,"lat":60.1699,"lng":24.9384,"sources":["https://nvidianews.nvidia.com/news/nvidia-ai-factory-finland","https://www.csc.fi/en/web/csc/nvidia-ai-factory-finland"]},{"id":"yandex-vladimir-ai-data-center-russia","title":"Yandex — Vladimir AI Data Center","url":"https://aidatacenterindex.com/datacenters/yandex-vladimir-ai-data-center-russia.html","megawatts":40,"companies":["Yandex"],"country":"Russia","region":"Vladimir Oblast","city":"Vladimir","status":"under_construction","energy_type":"Unknown","ai_focus":"Training and Inference","start_year":null,"lat":56.129,"lng":40.407,"sources":["https://www.mordorintelligence.com/industry-reports/russia-data-center-market"]},{"id":"yondr-toronto-ai-data-center-canada","title":"Yondr — Toronto AI Data Center","url":"https://aidatacenterindex.com/datacenters/yondr-toronto-ai-data-center-canada.html","megawatts":27,"companies":["Yondr Group"],"country":"Canada","region":"Ontario","city":"Toronto","status":"under_construction","energy_type":"Unknown","ai_focus":"Unknown","start_year":null,"lat":43.653,"lng":-79.383,"sources":["https://www.blackridgeresearch.com/project/yondr-group-toronto-data-center-canada"]},{"id":"nebius-megaor-national-ai-data-center-israel","title":"Nebius–Mega Or National AI Data Center (Israel)","url":"https://aidatacenterindex.com/datacenters/nebius-megaor-national-ai-data-center-israel.html","megawatts":25,"companies":["Nebius","Mega Or"],"country":"Israel","region":"Modi'in","city":"Modi'in","status":"under_construction","energy_type":"Grid (Israel Electric Corporation)","ai_focus":"Training & HPC (national AI infrastructure)","start_year":2025,"lat":31.898,"lng":35.0104,"sources":["https://www.datacenterdynamics.com/en/news/nebius-to-build-140m-israeli-national-ai-supercomputer/","https://www.jpost.com/business-and-innovation/tech-and-start-ups/article-803123"]},{"id":"equinix-sg6-singapore-ai-data-center","title":"Equinix — SG6 Singapore AI Data Center","url":"https://aidatacenterindex.com/datacenters/equinix-sg6-singapore-ai-data-center.html","megawatts":20,"companies":["Equinix"],"country":"Singapore","region":"Jurong","city":"Singapore","status":"under_construction","energy_type":"Renewable","ai_focus":"Unknown","start_year":null,"lat":1.321,"lng":103.706,"sources":["https://www.straitstimes.com/business/equinix-to-invest-348m-in-new-ai-ready-data-centre-in-singapore"]},{"id":"microsoft-greece-ai-region-athens","title":"Microsoft — Greece AI Region (Athens)","url":"https://aidatacenterindex.com/datacenters/microsoft-greece-ai-region-athens.html","megawatts":20,"companies":["Microsoft"],"country":"Greece","region":"Attica","city":"Spata","status":"under_construction","energy_type":"Unknown","ai_focus":"General Cloud","start_year":null,"lat":37.962,"lng":23.915,"sources":["https://news.microsoft.com/en-gr/2024/04/10/microsoft-announces-the-beginning-of-construction-for-the-data-center-region-in-greece/"]},{"id":"datavolt-tashkent-ai-data-center-uzbekistan","title":"DataVolt — Tashkent AI Data Center","url":"https://aidatacenterindex.com/datacenters/datavolt-tashkent-ai-data-center-uzbekistan.html","megawatts":12,"companies":["DataVolt (Saudi Arabia)"],"country":"Uzbekistan","region":"Tashkent","city":"Tashkent","status":"under_construction","energy_type":"Unknown","ai_focus":"Unknown","start_year":null,"lat":41.299,"lng":69.24,"sources":["https://mosaic-financial.uz/en/news/datavolt-to-build-green-data-center-in-uzbekistan"]},{"id":"mtn-ai-data-center-nigeria","title":"MTN AI Data Center (Nigeria)","url":"https://aidatacenterindex.com/datacenters/mtn-ai-data-center-nigeria.html","megawatts":9,"companies":["MTN Group","Genova (MTN AI infrastructure)"],"country":"Nigeria","region":"Western Africa","city":"Ikeja","status":"under_construction","energy_type":"Grid with on-site backup generation","ai_focus":"AI cloud & co-location services","start_year":2025,"lat":6.6059,"lng":3.3491,"sources":["https://digitalinfranetwork.com/news/mtn-pours-240m-into-lagos-data-hub-eyes-ai-and-cloud-growth/","https://www.mobileworldlive.com/latest-stories/mtn-eyes-ai-data-centre-expansion-across-africa/"]},{"id":"aws-mississippi-ai-data-center","title":"AWS Madison County Mississippi Data Center Complexes","url":"https://aidatacenterindex.com/datacenters/aws-mississippi-ai-data-center.html","megawatts":null,"companies":["Amazon Web Services"],"country":"United States","region":"Madison County, Mississippi","city":"","status":"Canton operating and Ridgeland in early construction as of June 2026; combined Madison County AWS data-center complexes still developing","energy_type":"AWS renewable matching and Entergy grid infrastructure; selected 1.3 GW energy-project capacity removed from data-center capacity","ai_focus":"Cloud computing, training, and inference infrastructure","start_year":2024,"lat":null,"lng":null,"sources":["https://www.aboutamazon.com/news/aws/aws-10-billion-investment-mississippi","https://www.aboutamazon.com/news/aws/aws-training-programs-sustainability-projects-mississippi","https://mississippi.org/news/amazon-web-services-to-invest-record-shattering-10-billion/","https://mississippitoday.org/2026/06/09/amazon-data-centers-mississippi/","https://www.entergy.com/blog/amazon-expands-and-entergy-mississippi-stands-ready-to-deliver-benefits-for-all-our-customers"]},{"id":"aws-richmond-county-north-carolina-ai-campus","title":"AWS Richmond County AI and Cloud Infrastructure Campus","url":"https://aidatacenterindex.com/datacenters/aws-richmond-county-north-carolina-ai-campus.html","megawatts":null,"companies":["Amazon Web Services"],"country":"United States","region":"Richmond County, North Carolina","city":"","status":"under construction; October 2025 groundbreaking reported","energy_type":"Facility-level power source or procurement not disclosed","ai_focus":"AWS AI and cloud computing infrastructure","start_year":2025,"lat":null,"lng":null,"sources":["https://www.aboutamazon.com/news/aws/aws-investment-north-carolina-ai-cloud-infrastructure","https://governor.nc.gov/news/press-releases/2025/06/04/governor-stein-announces-amazon-plans-invest-10-billion-north-carolina-ai-infrastructure","https://www.richmondnc.com/m/newsflash/Home/Detail/168","https://www.datacenterdynamics.com/en/news/amazon-breaks-ground-on-10bn-data-center-complex-in-richmond-county-north-carolina/"]},{"id":"cassava-ai-data-center-south-africa","title":"Cassava AI Data Center (South Africa)","url":"https://aidatacenterindex.com/datacenters/cassava-ai-data-center-south-africa.html","megawatts":null,"companies":["Cassava Technologies","Africa Data Centres","NVIDIA"],"country":"South Africa","region":"Southern Africa","city":"Johannesburg","status":"under_construction","energy_type":"Grid (with renewable mix)","ai_focus":"AI training & inference \"factory\"","start_year":2025,"lat":-26.2041,"lng":28.0473,"sources":["https://www.datacenterdynamics.com/en/news/cassava-technologies-brings-nvidia-powered-ai-supercomputer-to-south-africa/","https://www.techinafrica.com/nvidia-partners-with-cassava-to-build-ai-ready-data-centres-across-africa/"]},{"id":"google-wilbarger-county-texas-ai-campus","title":"Google Wilbarger County Data Center","url":"https://aidatacenterindex.com/datacenters/google-wilbarger-county-texas-ai-campus.html","megawatts":null,"companies":["Google","AES"],"country":"United States","region":"Wilbarger County, Texas","city":"","status":"Google says the Wilbarger County data center is under construction.","energy_type":"Google says the Wilbarger County data center will be co-located with, or built alongside, new clean power developed by AES.","ai_focus":"Google data-center infrastructure; facility-level AI workload class not disclosed","start_year":2026,"lat":null,"lng":null,"sources":["https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-wilbarger-county/","https://datacenters.google/locations/texas/"]},{"id":"microsoft-lordstown-ohio-stargate","title":"Stargate Lordstown Data Center (Ohio)","url":"https://aidatacenterindex.com/datacenters/microsoft-lordstown-ohio-stargate.html","megawatts":null,"companies":["SoftBank","OpenAI","Oracle"],"country":"United States","region":"Lordstown, Ohio","city":"Lordstown","status":"under construction / preparation work underway","energy_type":"Facility-level power source or procurement not disclosed","ai_focus":"Stargate high-performance AI compute; facility-specific workload split not disclosed","start_year":2025,"lat":41.171,"lng":-80.763,"sources":["https://openai.com/index/five-new-stargate-sites/","https://businessjournaldaily.com/preparation-work-begins-on-lordstown-data-center/"]},{"id":"microsoft-openai-stargate-new-mexico","title":"Project Jupiter Dona Ana County AI Data Center","url":"https://aidatacenterindex.com/datacenters/microsoft-openai-stargate-new-mexico.html","megawatts":null,"companies":["Oracle","OpenAI","Stack Infrastructure","BorderPlex Digital Assets"],"country":"United States","region":"Dona Ana County, New Mexico","city":"","status":"under construction; April 2026 project update reports 1M+ hours worked","energy_type":"On-site Bloom Energy fuel-cell microgrid; fuel/feedstock not selected","ai_focus":"Oracle Cloud / OpenAI Stargate AI infrastructure; workload split not disclosed","start_year":2025,"lat":null,"lng":null,"sources":["https://openai.com/index/five-new-stargate-sites/","https://projectjupitertogether.com/","https://www.oracle.com/data-centers/dona-ana-county/","https://www.datacenterdynamics.com/en/news/oracle-revealed-as-tenant-of-project-jupiter-data-center-campus-in-new-mexico/"]},{"id":"openai-g42-abu-dhabi-ai-megacluster","title":"OpenAI / G42 Stargate UAE Cluster","url":"https://aidatacenterindex.com/datacenters/openai-g42-abu-dhabi-ai-megacluster.html","megawatts":null,"companies":["OpenAI","G42","Khazna Data Centers","Oracle","NVIDIA","Cisco","SoftBank Group"],"country":"United Arab Emirates","region":"Abu Dhabi","city":"Abu Dhabi","status":"under construction / first 200 MW expected in 2026","energy_type":"Unknown facility-specific energy procurement; cluster sits within the UAE-US AI Campus power envelope","ai_focus":"Training and inference cluster for OpenAI workloads and UAE sovereign AI capability","start_year":2026,"lat":24.4539,"lng":54.3773,"sources":["https://openai.com/index/introducing-stargate-uae/","https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae","https://www.prnewswire.com/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html","https://www.datacenterknowledge.com/deals/openai-announces-stargate-data-center-expansion-in-abu-dhabi"]},{"id":"stargate-uae-abu-dhabi-ai-cluster","title":"Stargate UAE Abu Dhabi AI Cluster Reference","url":"https://aidatacenterindex.com/datacenters/stargate-uae-abu-dhabi-ai-cluster.html","megawatts":null,"companies":["G42","Khazna Data Centers","OpenAI","Oracle","NVIDIA","Cisco","SoftBank Group"],"country":"United Arab Emirates","region":"Abu Dhabi","city":"Abu Dhabi","status":"first 200 MW expected to go live in 2026","energy_type":"G42 says the full UAE-US AI Campus will be powered by nuclear, solar, and natural gas.","ai_focus":"Stargate UAE child cluster inside the UAE-US AI Campus","start_year":2025,"lat":null,"lng":null,"sources":["https://openai.com/index/introducing-stargate-uae/","https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae","https://www.prnewswire.com/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html"]}]}