{"type":"FeatureCollection","generated_at":"2026-07-12T03:07:34.945Z","license":"CC BY 4.0","taxonomy":{"type":"year","name":"2026","slug":"2026"},"features":[{"type":"Feature","geometry":{"type":"Point","coordinates":[54.3773,24.4539]},"properties":{"id":"g42-uae-us-ai-campus-abu-dhabi","title":"G42 “Stargate” UAE–US AI Campus (Abu Dhabi)","url":"https://aidatacenterindex.com/datacenters/g42-uae-us-ai-campus-abu-dhabi.html","megawatts":5000,"companies":["G42","Khazna Data Centers","OpenAI","Oracle","NVIDIA","Cisco","SoftBank Group"],"country":"United Arab Emirates","status":"under construction / first 200 MW Stargate UAE cluster expected in 2026","energy_type":"Abu Dhabi grid and new infrastructure power context; facility-specific procurement mix not disclosed","ai_focus":"Sovereign AI-grade compute, training, inference, and regional AI cloud services"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[83.218,17.687]},"properties":{"id":"adani-google-vizag-india-ai-campus","title":"Google / AdaniConneX Visakhapatnam AI Hub","url":"https://aidatacenterindex.com/datacenters/adani-google-vizag-india-ai-campus.html","megawatts":1000,"companies":["Google","Google Cloud","AdaniConneX","Adani Enterprises","Nxtra by Airtel"],"country":"India","status":"under construction; Google broke ground on April 28, 2026","energy_type":"Long-term clean-energy strategy and new clean-energy supply to the grid; not a delivered facility mix yet","ai_focus":"Gigawatt-scale AI hub for advanced AI services, large-scale cloud infrastructure, and India AI ecosystem growth"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[75.313,51.724]},"properties":{"id":"ekibastuz-ai-data-center-valley-kazakhstan","title":"Data Center Valley Ekibastuz AI Campus","url":"https://aidatacenterindex.com/datacenters/ekibastuz-ai-data-center-valley-kazakhstan.html","megawatts":1000,"companies":["Kazakhstan Ministry of AI and Digital Development","Kazakhtelecom"],"country":"Kazakhstan","status":"officially described as in active implementation phase","energy_type":"State-backed energy-capacity program in Ekibastuz; exact generation mix not publicly selected.","ai_focus":"Kazakhstan state-backed AI and data-center valley program"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-86.471,40.052]},"properties":{"id":"meta-lebanon-indiana-ai-campus","title":"Meta Lebanon AI Data Center","url":"https://aidatacenterindex.com/datacenters/meta-lebanon-indiana-ai-campus.html","megawatts":1000,"companies":["Meta"],"country":"United States","status":"breaking ground announced February 2026","energy_type":"Meta says it will match 100% of the new data center's energy use with clean energy and use a closed-loop liquid-cooling system.","ai_focus":"Meta AI-optimized data center campus for current and future AI workloads"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-84.799,33.352]},"properties":{"id":"atlas-development-project-sail-georgia","title":"Prologis / Atlas Project Sail Data Center (Coweta County)","url":"https://aidatacenterindex.com/datacenters/atlas-development-project-sail-georgia.html","megawatts":900,"companies":["Prologis","Atlas Development"],"country":"United States","status":"rezoning approved; construction start and tenant not confirmed","energy_type":"Power supported in Georgia Power planning; specific energy procurement not disclosed.","ai_focus":"Planned hyperscale data-center campus in Coweta County, Georgia"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-92.646,44.202]},"properties":{"id":"google-pine-island-minnesota-ai-campus","title":"Google Pine Island AI Data Center (Minnesota)","url":"https://aidatacenterindex.com/datacenters/google-pine-island-minnesota-ai-campus.html","megawatts":600,"companies":["Google"],"country":"United States","status":"announced","energy_type":"Wind/Solar PPA (Xcel Energy)","ai_focus":"Training and Inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[46.6753,24.7136]},"properties":{"id":"aramco-digital-groq-inference-data-center-saudi-arabia","title":"Aramco Digital & Groq Inference Data Center (Saudi Arabia)","url":"https://aidatacenterindex.com/datacenters/aramco-digital-groq-inference-data-center-saudi-arabia.html","megawatts":500,"companies":["Aramco Digital","Groq"],"country":"Saudi Arabia","status":"announced","energy_type":"Grid (Saudi national power mix)","ai_focus":"Inference (large-scale LLM serving)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-0.603,51.507]},"properties":{"id":"digital-realty-uk-mega-campus-ai","title":"Digital Realty UK AI Mega-Campus","url":"https://aidatacenterindex.com/datacenters/digital-realty-uk-mega-campus-ai.html","megawatts":300,"companies":["Digital Realty"],"country":"United Kingdom","status":"planned","energy_type":"Renewable (Grid) + Hydrogen Fuel Cell Pilot","ai_focus":"Hyperscale Training and \"AI Factory\""}},{"type":"Feature","geometry":{"type":"Point","coordinates":[141.603,42.636]},"properties":{"id":"softbank-tomakomai-ai-data-center-japan","title":"SoftBank Tomakomai AI Data Center (Japan)","url":"https://aidatacenterindex.com/datacenters/softbank-tomakomai-ai-data-center-japan.html","megawatts":300,"companies":["SoftBank Corp.","NVIDIA"],"country":"Japan","status":"under_construction","energy_type":"100% renewable (local wind/cool climate)","ai_focus":"Sovereign AI (NVIDIA Blackwell, AI-RAN)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[46.72,24.7]},"properties":{"id":"humain-ai-data-centers-saudi-arabia","title":"Humain AI Data Centers (Saudi Arabia)","url":"https://aidatacenterindex.com/datacenters/humain-ai-data-centers-saudi-arabia.html","megawatts":200,"companies":["Humain","Amazon Web Services","AMD"],"country":"Saudi Arabia","status":"under_construction","energy_type":"Grid (KSA utility power)","ai_focus":"Training & Inference (national AI cloud)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[121.567,25.033]},"properties":{"id":"microsoft-taiwan-north-ai-cloud-region","title":"Microsoft Taiwan North AI Cloud Region","url":"https://aidatacenterindex.com/datacenters/microsoft-taiwan-north-ai-cloud-region.html","megawatts":200,"companies":["Microsoft"],"country":"Taiwan","status":"planned","energy_type":"Renewable (Utility PPA)","ai_focus":"AI Inference and Real-Time AI"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-73.567,45.501]},"properties":{"id":"vantage-quebec-ai-data-center-expansion","title":"Vantage Data Centers Quebec Expansion (Montreal & Quebec City)","url":"https://aidatacenterindex.com/datacenters/vantage-quebec-ai-data-center-expansion.html","megawatts":178,"companies":["Vantage Data Centers"],"country":"Canada","status":"operational","energy_type":"Hydroelectric (Hydro-Québec)","ai_focus":"Hyperscale and AI Training"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[70.057,22.471]},"properties":{"id":"reliance-jio-jamnagar-ai-mega-campus-india","title":"Reliance / Meta Jamnagar AI Data Center","url":"https://aidatacenterindex.com/datacenters/reliance-jio-jamnagar-ai-mega-campus-india.html","megawatts":168,"companies":["Reliance Industries","Jio","Meta"],"country":"India","status":"planned built-to-suit AI data center; RIL says 168 MW to be delivered within two years from June 2026","energy_type":"Renewable energy with desalinated seawater cooling according to RIL's June 2026 release","ai_focus":"AI-enabled hyperscale data center leased by Meta for global infrastructure, core business, and AI compute needs"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-121.785,37.234]},"properties":{"id":"equinix-sv18-silicon-valley-california","title":"Equinix SV18 Silicon Valley (California)","url":"https://aidatacenterindex.com/datacenters/equinix-sv18-silicon-valley-california.html","megawatts":117,"companies":["Equinix"],"country":"United States","status":"planned","energy_type":"Renewable (Utility PPA)","ai_focus":"Hyperscale and Cloud Interconnection"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[31.2357,30.0444]},"properties":{"id":"aws-cairo-middle-east-south-1-egypt","title":"AWS — Middle East South (Cairo) me-south-2","url":"https://aidatacenterindex.com/datacenters/aws-cairo-middle-east-south-1-egypt.html","megawatts":100,"companies":["Amazon","AWS"],"country":"Egypt","status":"planned","energy_type":"Mixed","ai_focus":"AI cloud services, Bedrock, emerging markets AI infrastructure"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[44.5144,40.1814]},"properties":{"id":"firebird-ai-data-center-armenia","title":"Firebird AI Data Center (Armenia)","url":"https://aidatacenterindex.com/datacenters/firebird-ai-data-center-armenia.html","megawatts":100,"companies":["Firebird","Government of Armenia"],"country":"Armenia","status":"announced","energy_type":"Grid (public–private partnership)","ai_focus":"Training & Research (sovereign AI hub)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[77.503,28.474]},"properties":{"id":"yotta-d2-greater-noida-ai-supercluster","title":"Yotta D2 / NVIDIA Blackwell AI Supercluster (Greater Noida)","url":"https://aidatacenterindex.com/datacenters/yotta-d2-greater-noida-ai-supercluster.html","megawatts":60,"companies":["Yotta Data Services","NVIDIA"],"country":"India","status":"under construction / planned AI supercluster; expected go-live by August 2026","energy_type":"Unknown facility-specific delivered energy mix; opened sources emphasize high-density AI infrastructure but do not disclose procurement terms for D2","ai_focus":"Blackwell Ultra GPU supercluster, NVIDIA DGX Cloud, Shakti Cloud, sovereign AI training and inference"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[14.437,50.075]},"properties":{"id":"microsoft-azure-czech-republic-prague","title":"Microsoft Azure — Czech Republic Region (Prague)","url":"https://aidatacenterindex.com/datacenters/microsoft-azure-czech-republic-prague.html","megawatts":50,"companies":["Microsoft"],"country":"Czech Republic","status":"announced","energy_type":"Mixed","ai_focus":"Inference (Azure AI, Central European data residency)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[3.379,6.524]},"properties":{"id":"microsoft-azure-nigeria-lagos-announced","title":"Microsoft Azure — Nigeria Region (Lagos, Announced)","url":"https://aidatacenterindex.com/datacenters/microsoft-azure-nigeria-lagos-announced.html","megawatts":50,"companies":["Microsoft"],"country":"Nigeria","status":"announced","energy_type":"Grid","ai_focus":"Inference (Azure AI, West Africa market)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[105.8542,21.0285]},"properties":{"id":"microsoft-azure-vietnam-hanoi","title":"Microsoft Azure — Vietnam (Hanoi / Ho Chi Minh City)","url":"https://aidatacenterindex.com/datacenters/microsoft-azure-vietnam-hanoi.html","megawatts":50,"companies":["Microsoft"],"country":"Vietnam","status":"planned","energy_type":"Mixed","ai_focus":"Azure AI services, Southeast Asian AI expansion"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-77.0428,-12.0464]},"properties":{"id":"aws-peru-ai-cloud-region","title":"AWS — Peru Cloud Region (Announced)","url":"https://aidatacenterindex.com/datacenters/aws-peru-ai-cloud-region.html","megawatts":40,"companies":["Amazon Web Services"],"country":"Peru","status":"announced","energy_type":"Mixed","ai_focus":"General Cloud + AI Inference (Andean market)"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-96.84,32.818]},"properties":{"id":"equinix-da12-dallas-texas","title":"Equinix DA12 Dallas (Texas)","url":"https://aidatacenterindex.com/datacenters/equinix-da12-dallas-texas.html","megawatts":40,"companies":["Equinix"],"country":"United States","status":"under_construction","energy_type":"Renewable (Utility PPA)","ai_focus":"High-Density AI and Machine Learning"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[101.657,2.923]},"properties":{"id":"digital-realty-cyberjaya-malaysia","title":"Digital Realty Cyberjaya (Malaysia)","url":"https://aidatacenterindex.com/datacenters/digital-realty-cyberjaya-malaysia.html","megawatts":14,"companies":["Digital Realty"],"country":"Malaysia","status":"operational","energy_type":"Grid (Utility PPA)","ai_focus":"Cloud and AI Interconnection"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[2.247,48.948]},"properties":{"id":"equinix-pa12x-paris-france","title":"Equinix PA12x Paris xScale Data Center (Argenteuil)","url":"https://aidatacenterindex.com/datacenters/equinix-pa12x-paris-france.html","megawatts":14,"companies":["Equinix"],"country":"France","status":"planned / under construction; Equinix expansion timeline lists Q2 2026","energy_type":"Unknown; PA12x-specific procurement not disclosed in opened sources","ai_focus":"xScale hyperscale and cloud infrastructure with AI-ready metro context; tenant workload mix not disclosed"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-46.633,-23.55]},"properties":{"id":"equinix-sp7-sao-paulo-brazil","title":"Equinix SP7 São Paulo (Brazil)","url":"https://aidatacenterindex.com/datacenters/equinix-sp7-sao-paulo-brazil.html","megawatts":14,"companies":["Equinix"],"country":"Brazil","status":"planned","energy_type":"Renewable (Utility PPA)","ai_focus":"Hyperscale Training and AI Cloud"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[28.978,41.008]},"properties":{"id":"equinix-il3-istanbul-turkey","title":"Equinix IL3 Istanbul (Turkey)","url":"https://aidatacenterindex.com/datacenters/equinix-il3-istanbul-turkey.html","megawatts":9,"companies":["Equinix"],"country":"Turkey","status":"planned","energy_type":"Renewable (Utility PPA)","ai_focus":"Colocation and Interconnection"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-3.633,40.533]},"properties":{"id":"equinix-md5-madrid-spain","title":"Equinix MD5 Madrid (Spain)","url":"https://aidatacenterindex.com/datacenters/equinix-md5-madrid-spain.html","megawatts":6,"companies":["Equinix"],"country":"Spain","status":"planned","energy_type":"Renewable (Utility PPA)","ai_focus":"Colocation and Interconnection"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[3.384,6.455]},"properties":{"id":"equinix-lg3-lagos-nigeria","title":"Equinix LG3 Lagos (Nigeria)","url":"https://aidatacenterindex.com/datacenters/equinix-lg3-lagos-nigeria.html","megawatts":1,"companies":["Equinix"],"country":"Nigeria","status":"planned","energy_type":"Grid + On-site Generation","ai_focus":"Colocation and Interconnection"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[-7.5898,33.5731]},"properties":{"id":"cassava-ai-data-center-morocco","title":"Cassava AI Data Center (Morocco)","url":"https://aidatacenterindex.com/datacenters/cassava-ai-data-center-morocco.html","megawatts":null,"companies":["Cassava Technologies","Africa Data Centres","NVIDIA"],"country":"Morocco","status":"planned","energy_type":"Grid (renewable potential)","ai_focus":"Maghreb AI infrastructure node"}},{"type":"Feature","geometry":{"type":"Point","coordinates":[54.3773,24.4539]},"properties":{"id":"openai-g42-abu-dhabi-ai-megacluster","title":"OpenAI / G42 Stargate UAE Cluster","url":"https://aidatacenterindex.com/datacenters/openai-g42-abu-dhabi-ai-megacluster.html","megawatts":null,"companies":["OpenAI","G42","Khazna Data Centers","Oracle","NVIDIA","Cisco","SoftBank Group"],"country":"United Arab Emirates","status":"under construction / first 200 MW expected in 2026","energy_type":"Unknown facility-specific energy procurement; cluster sits within the UAE-US AI Campus power envelope","ai_focus":"Training and inference cluster for OpenAI workloads and UAE sovereign AI capability"}}]}