Operator Profile

AirTrunk

Track the global AI data center footprint controlled by AirTrunk. AirTrunk operates 2 tracked facilities across 2 countries with 654 MW of selected tracked capacity. 0% are currently operational.

Facilities

2

Tracked Capacity

654 MW

Countries

2

Statuses

2

Pipeline

2

Not yet operational

Capacity Pipeline

654 MW of selected tracked capacity across 2 facilities.

Under Construction300 MW46%1
Planned354 MW54%1

Data Quality

100% cited
100% capacity published
100% geolocated
0% dated

Peer Ranking

Where AirTrunk stands among 226 tracked operators.

Compare side-by-side →
By facility count#31of 226
By selected capacity#58of 226 · 654 MW
Share of top market
4% of the #1 operator's capacity

Operator Portfolio Brief

How this operator's infrastructure is positioned

A compact read on geographic concentration, live-versus-pipeline mix, and the largest disclosed site in this operator's portfolio.

Lead market
Australia
1 tracked facilities
Buildout mix
0 live / 2 pipeline
0% operational
Geographic footprint
Australia, Japan
2 countries total
Largest disclosed site
AirTrunk — MEL2 Melbourne
354 MW of selected tracked capacity
Primary energy source
Renewable
2 of 2 facilities

Frequently asked questions

How many AI data centers does AirTrunk operate?
AirTrunk has 2 tracked facilities in the AI Data Center Index, with a combined selected tracked capacity of 654 MW across 2 countries.
Where are AirTrunk's AI data centers located?
AirTrunk's facilities span 2 countries. See the geographic breakdown and facility table on this page for the full location list.

Facilities

Facility Operator Location Capacity ↓ Status Energy Workload Readiness Sources
AirTrunkAustralia
Victoria
354 MWplannedRenewableUnknown
1
AirTrunkJapan
Chiba
300 MWunder constructionRenewableGeneral Cloud
1