Global AI infrastructure · Dataset snapshot 2026-06-18

AI data centers database and market map

Search 346 source-backed facility records across 64 countries by operator, country, status, or capacity.

Current scope
346 facilities · 64 countries
Tracked load
117.2 GW
Coverage
225 operators

Interactive globe

All 346 facilities, mapped

Every filtered facility is plotted on the globe below. Use the filters above to narrow by country, operator, or status — the map, stats, and directory all stay in sync.

Open map explorer
Current view346 facilities64 countries117.2 GW
294 plotted64 countries92.3 GW

Facilities in index

Directly sourced records

346

Countries covered

Current geographic coverage

64

Operators tracked

Distinct operators

225

Tracked capacity

Selected MW in index

117.2 GW

What the data shows

What the data shows about the global buildout.

Country concentration

United States leads global deployment with 84 tracked facilities, accounting for 24% of the current index.

Browse country distribution

Operator concentration

The top five operators by capacity control 55% of all tracked megawatts, concentrating the current buildout among hyperscalers and sovereign programs.

Review operator rankings

Construction wave

71 facilities totaling 36.6 GW are under construction, signaling continued rapid expansion of global AI compute capacity.

Inspect live construction

Energy mix

47% of tracked facilities report renewable or nuclear sourcing, while the remainder rely on mixed grid or fossil-backed supply chains.

Open the energy breakdown

Buildout wave

Year-by-year acceleration.

Full timeline
2025Peak year by facility count47 facilities · 21.7 GW
69%Facilities from 2023 onward162 of 236 with dated signals

Each year uses the best publicly dated signal for that facility: announcement, construction, energization, or operational crossover.

Market composition

Status, operator concentration, and energy profile.

How the AI buildout breaks down by pipeline stage, who controls the most capacity, and how facilities are powered.

Status distribution

Operational16347%
Under construction4513%
Planned4212%
Announced72%

Energy mix

Renewable13439%
Nuclear165%
Mixed4814%
Gas93%
Other / Undisclosed13940%

Market concentration

55%
Top 5 operators' share of tracked capacity
Meta, Amazon Web Services, Microsoft, NVIDIA, SoftBank Group
37%
Top 5 countries' share of facility count
United States, India, Germany, France, South Korea
47%
Facilities currently operational
183 still in pipeline
399 MW
Average capacity of disclosed facilities
294 of 346 have published capacity

Searchable directory

Filter the global facility list.

Cut the index by geography, status, energy profile, AI workload, or minimum scale. The spatial surface and table below both reflect the same filter state.

346 facilitiesFull index view across the entire tracked market.
Facility Operator Location Capacity ↓ Status Energy Workload Readiness Sources
O'Leary VenturesMunicipal District of GreenviewCanada
Western Canada
7,500 MWplanned full-build campus; Phase 1 power infrastructure proposedGasMixed
5
G42Khazna Data CentersOpenAIOracleNVIDIACiscoSoftBank GroupUnited Arab Emirates
Abu Dhabi
5,000 MWunder construction / first 200 MW Stargate UAE cluster expected in 2026OtherMixed
5
MetaEntergy LouisianaUnited States
Richland Parish, Louisiana
5,000 MWunder construction; future 5 GW expansion not yet deliveredNuclearTraining
4
SoftBank GroupSB EnergySchneider ElectricEDFFrance
Hauts-de-France and additional France sites
5,000 MWplanned national AI data center capacity program; first 3.1 GW phase targeted by 2031OtherMixed
3
Scala Data CentersBrazil
Rio Grande do Sul
4,750 MWplanned campus with 5 GW grid-connection authorization and 54 MW first phase disclosedRenewableMixed
3
Beacon AI CentersNadia PartnersCanada
Alberta
4,500 MWplanned multi-site Alberta development with sites targeted to energize as early as 2027GasMixed
5
MicrosoftNVIDIAUnited States
Mount Pleasant, Wisconsin
3,300 MWstartup activity and equipment bring-up reported in May 2026; full campus buildout not completeOtherTraining
4
Stock Farm Road, Inc.Fir HillsJeollanam-do Provincial GovernmentSouth Korea
Jeollanam-do
3,000 MWannounced MOU-stage proposal; early-stage and not fully fundedOtherTraining
3
MetaVistra CorpUnited States
PJM grid region (Ohio and Pennsylvania)
2,609 MW20-year Meta-Vistra nuclear PPAs announced January 2026; uprate capacity expected in early 2030sNuclearMixed
3
Amazon Web ServicesUnited States
Oregon
2,435 MWoperational AWS US West (Oregon) region and market footprintRenewableAI & Cloud Infrastructure
4
Amazon Web ServicesAnthropicUnited States
New Carlisle, Indiana
2,200 MWoperational first Project Rainier cluster; full campus buildout ongoingOtherMixed
4
xAIUnited States
Greater Memphis / Southaven xAI region
2,000 MWColossus operational; Southaven MACROHARDRR expansion and power context still developingGasTraining
5
Amazon Web ServicesTalen EnergyUnited States
Pennsylvania
1,920 MWunder construction at Susquehanna-adjacent campus with additional planned Pennsylvania campusesNuclearMixed
5
Elea Data CentersBrazil
Rio de Janeiro
1,500 MWRJO1 operational; phased Rio AI City first-phase buildout in progress with RJO2 delivery beginning in 2026RenewableMixed
3
ExxonMobilUnited States
United States
1,500 MWFEED-stage data-center power-generation initiative; customer and site not publicly disclosedGasGeneral Cloud
2
DataVoltNEOMSaudi Arabia
Oxagon, NEOM
1,500 MWagreement signed; phased Oxagon AI factory campus with first phase expected operational by 2028OtherMixed
2
Romanian Ministry of EconomyEuroHPC JURomanian AI Gigafactory ConsortiumRomania
Cernavoda and Doicesti
1,500 MWplanned bid / letter of intent through EuroHPC AI Gigafactory process; no selected developer or constructionNuclearSovereign AI
3
MGXBpifranceMistral AINVIDIACampus AIFrance
Seine-et-Marne / Paris region
1,400 MWplanned AI campus; construction expected H2 2026 with operations targeted from 2028OtherSovereign AI
4
Vantage Data CentersUnited States
Shackelford County, Texas
1,400 MWconstruction began before August 2025 announcement; first building scheduled for H2 2026OtherTraining
4
MetaOklo Inc.United States
Pike County, Ohio
1,200 MWagreement announced January 2026; pre-construction and site characterization slated for 2026NuclearTraining
2
OpenAIOracleCrusoeLanciumNVIDIAUnited States
Abilene, Texas
1,200 MWfirst phase live; full 1.2 GW campus under constructionGasMixed
4
Amazon Web ServicesVistra CorpUnited States
Hood and Somervell Counties, Texas
1,200 MWplanned data-center campus / contracted power delivery beginning Q4 2027NuclearMixed
5
GoogleGoogle CloudAdaniConneXAdani EnterprisesNxtra by AirtelIndia
Andhra Pradesh / Visakhapatnam
1,000 MWunder construction; Google broke ground on April 28, 2026OtherTraining
3
Kazakhstan Ministry of AI and Digital DevelopmentKazakhtelecomKazakhstan
Pavlodar Region
1,000 MWofficially described as in active implementation phaseOtherSovereign AI
2
MetaUnited States
El Paso, Texas
1,000 MWunder construction; Meta says the site broke ground in 2025RenewableAI Training and Inference
3
MetaUnited States
Lebanon, Indiana
1,000 MWbreaking ground announced February 2026OtherAI Training and Inference
1
MetaUnited States
New Albany, Ohio
1,000 MWNew Albany campus active and expanding; Prometheus described as a gigawatt-scale 2026 AI supercluster buildoutNuclearTraining
5
Vantage Data CentersOpenAIOracleUnited States
Port Washington, Wisconsin
902 MWgroundbreaking reported December 2025; scheduled for completion in 2028RenewableAI Training and Inference
3
PrologisAtlas DevelopmentUnited States
Georgia
900 MWrezoning approved; construction start and tenant not confirmedOtherAI & Cloud Infrastructure
4
Constellation EnergyMicrosoftUnited States
Londonderry Township / Middletown, Pennsylvania
835 MWplanned 2028 restart pending regulatory approvalsNuclearPower-Linked AI Infrastructure
3
Amazon Web ServicesUnited States
Caroline and Spotsylvania Counties, Virginia
770 MWplanned permit-stage campusOtherAI workload not disclosed at facility level
3
OpCoreEDFiliad GroupInfraVia Capital PartnersFrance
Montereau-Vallee-de-la-Seine, Ile-de-France
700 MWplanned / exclusive negotiations for former power-plant siteOtherMixed
2
MetaTerraPowerUnited States
United States
690 MWcommercial agreement with initial delivery as early as 2032; specific initial dual-unit site not yet identifiedNuclearAI power procurement
3
NextEra EnergyGoogleCentral Iowa Power CooperativeUnited States
Palo / Linn County, Iowa
615 MWDuane Arnold restart targeted for full operation by Q1 2029, pending regulatory approvals.NuclearAI power procurement
3
GoogleUnited States
Pine Island, Minnesota
600 MWannouncedOtherMixed
1
GoogleUnited States
Oklahoma
600 MWoperationalRenewableGeneral Cloud
3
MicrosoftIndia
Hyderabad / India South Central cloud-region program
600 MWunder construction / planned cloud-region program; Microsoft says India South Central is set to go live in mid-2026RenewableMixed
3
Alibaba CloudChina
Hebei
500 MWoperationalRenewableMixed
2
Amazon Web ServicesUnited States
Ohio
500 MWoperationalRenewableMixed
2
Aramco DigitalGroqSaudi Arabia
Saudi Arabia (TBD)
500 MWannouncedOtherInference
2
Amazon Web ServicesJapan
Tokyo
500 MWoperationalRenewableMixed
2
Bell Canada (BCE)Canada
British Columbia
500 MWunder constructionOtherMixed
2
ByteDance (TikTok)Malaysia
Johor
500 MWunder constructionOtherTraining
1
Digital EdgeIndonesia
West Java
500 MWunder constructionOtherMixed
1
GoogleUnited States
Iowa
500 MWoperationalRenewableMixed
2
GoogleKairos PowerUnited States
United States
500 MWannouncedNuclearUnknown
2
MetaUnited States
Utah
500 MWunder constructionRenewableTraining
2
MicrosoftPoland
Masovian
500 MWoperationalMixedGeneral Cloud
1
MicrosoftUnited Kingdom
Greater London
500 MWoperationalRenewableInference
2
MicrosoftBrazil
São Paulo
500 MWoperationalRenewableInference
1
50 facilities64 operators · 16 countries80,326 MW8 operational
Page 1 of 7 (346 facilities)

Frequently asked questions

How many AI data centers are there in the world?
The AI Data Center Index tracks 346 AI data center facilities across 64 countries. This includes 163 operational sites, 45 under construction, and 49 in the planning or announcement pipeline.
Where are AI data centers located?
AI data centers are concentrated in United States, which leads with 84 tracked facilities. Other major markets include France, Germany, India, South Korea. Browse the full interactive map or filter by country.
Who are the biggest AI data center operators?
The largest operators by facility count include Microsoft (53), Amazon Web Services (44), Google (44), NVIDIA (29). See the full operator directory for capacity rankings and facility maps.
Can I download AI data center data?
All 346 facility pages are free to browse with full source citations. Bulk CSV/JSON exports and structured intelligence reports are available through the data access page.