Country
United States
AI data center dossier
Country
United States
Operator
Amazon Web Services
Energy
Grid / utility infrastructure
Tracked capacity
770 MW
Campus power envelope | Trade corroborated
770 MW is the reported permit-application campus capacity for the Mattameade / Orrock project; public sources do not separate critical IT load from broader data-center/campus power capacity.
Evidence profile
Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.
Readiness
100%
3 citations linked
38.121743, -77.5008296
Campus power envelope | Trade corroborated
3 dated fields available
HTML, JSON, and GeoJSON all available
Machine-readable outputs
Canonical record surfaces for audit, programmatic use, and direct citation.
Amazon Data Services is seeking permits for the Mattameade Data Center project in Caroline and Spotsylvania Counties, Virginia. The U.S. Army Corps of Engineers public notice identifies the applicant as Amazon Data Services, gives a 1,143-acre project area and coordinates of 38.1217430, -77.5008296, and describes 11 two-story data-center buildings, an administration building, three substation pads, electrical utility infrastructure, water/sewer facilities, roads, and stormwater infrastructure.
Data Center Dynamics reports that a letter attached to the application says Amazon is seeking to develop a minimum of 770 MW of data-center capacity by 2027. ADCI keeps 770 MW as selected planned capacity and classifies it as a campus power envelope because the opened public sources do not separate critical IT load from broader data-center/campus power capacity.