AI data center dossier

AWS Mattameade / Orrock Data Center Campus

Caroline and Spotsylvania Counties, Virginia, United States/datacenters/aws-orrock-tech-campus-virginia.html
PlannedGrid / utility infrastructure770 MWAI workload not disclosed at facility level

Country

United States

Operator

Amazon Web Services

Energy

Grid / utility infrastructure

Tracked capacity

770 MW

Campus power envelope | Trade corroborated

770 MW is the reported permit-application campus capacity for the Mattameade / Orrock project; public sources do not separate critical IT load from broader data-center/campus power capacity.

Evidence profile

Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.

Readiness

100%

Sources attachedVerified

3 citations linked

CoordinatesPublished

38.121743, -77.5008296

Capacity scopeScoped

Campus power envelope | Trade corroborated

Timeline evidencePartial

3 dated fields available

Machine-readable outputsPublished

HTML, JSON, and GeoJSON all available

Record Notes

Amazon Data Services is seeking permits for the Mattameade Data Center project in Caroline and Spotsylvania Counties, Virginia. The U.S. Army Corps of Engineers public notice identifies the applicant as Amazon Data Services, gives a 1,143-acre project area and coordinates of 38.1217430, -77.5008296, and describes 11 two-story data-center buildings, an administration building, three substation pads, electrical utility infrastructure, water/sewer facilities, roads, and stormwater infrastructure.

Data Center Dynamics reports that a letter attached to the application says Amazon is seeking to develop a minimum of 770 MW of data-center capacity by 2027. ADCI keeps 770 MW as selected planned capacity and classifies it as a campus power envelope because the opened public sources do not separate critical IT load from broader data-center/campus power capacity.

Analyst Flags

No obvious coverage gaps detected in the current structured record.

Timeline Signals

Announcement2025
Operational2027
Earliest market signal2025

Nearby Facilities

Other tracked AI data centers within 300 km of this location.

Related Facilities

Intelligence Reports

Structured analysis covering this facility's operator and market context.

Frequently asked questions

How big is AWS Mattameade / Orrock Data Center Campus?
AWS Mattameade / Orrock Data Center Campus has 770 MW of tracked capacity (Campus power envelope | Trade corroborated), located in Caroline and Spotsylvania Counties, Virginia, United States. It ranks #31 globally by selected capacity among 294 tracked records.
What is the status of AWS Mattameade / Orrock Data Center Campus?
AWS Mattameade / Orrock Data Center Campus is currently planned. Known timeline milestones: Announcement 2025, Operational 2027, Earliest market signal 2025.
Who operates AWS Mattameade / Orrock Data Center Campus?
AWS Mattameade / Orrock Data Center Campus is operated by Amazon Web Services. Structured intelligence reports are available for Amazon Web Services Operator Report and United States Country Report.
What energy source does AWS Mattameade / Orrock Data Center Campus use?
AWS Mattameade / Orrock Data Center Campus is powered by grid / utility infrastructure energy and is focused on ai workload not disclosed at facility level workloads. This is backed by 3 cited sources.

Sources

  1. nao.usace.army.milnao.usace.army.mil — Media/Public-Notices
  2. datacenterdynamics.comdatacenterdynamics.com — en/news
  3. virginiabusiness.comvirginiabusiness.com