AI data center dossier
Country
United States
Operator
Applied Digital, CoreWeave
Energy
Renewable-power design intent and cool-climate efficiency
Tracked capacity
400 MW
Evidence profile
Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.
Readiness
100%
2 citations linked
46.001, -98.525
Selected MW is present, but its scope has not been classified yet
2 dated fields available
HTML, JSON, and GeoJSON all available
Machine-readable outputs
Canonical record surfaces for audit, programmatic use, and direct citation.
Applied Digital's Polaris Forge 1 campus in Ellendale, North Dakota is a staged AI factory campus for CoreWeave. Applied Digital first announced two approximately 15-year lease agreements to deliver 250 MW of critical IT load for CoreWeave at Ellendale, with the first 100 MW data center expected to be ready for service in Q4 2025 and the second 150 MW building expected in mid-2026. Applied Digital later finalized an additional 150 MW lease with CoreWeave, bringing total critical IT capacity across three long-term leases to 400 MW. The third 150 MW building is in planning and expected to be ready for service in 2027. ADCI selects 400 MW as the public planned/contracted campus capacity and marks the record under construction because not all contracted buildings are live.
Structured analysis covering this facility's operator and market context.