Country
United Arab Emirates
AI data center dossier
Country
United Arab Emirates
Operator
G42, Khazna Data Centers, OpenAI, Oracle, NVIDIA, Cisco, SoftBank Group
Energy
Nuclear, solar, and natural gas
Tracked capacity
Unknown
Overlapping child capacity | Primary source
Stargate UAE is source-backed as a 1 GW child cluster inside the selected 5 GW UAE-US AI Campus; this duplicate/reference record is left unselected to avoid double-counting.
Evidence profile
Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.
Readiness
71%
3 citations linked
No map point published yet
No selected MW value published
3 dated fields available
HTML, JSON, and GeoJSON all available
Machine-readable outputs
Canonical record surfaces for audit, programmatic use, and direct citation.
Stargate UAE is a 1 GW AI compute cluster in Abu Dhabi inside the larger 5 GW UAE-US AI Campus. OpenAI says the cluster is the first international deployment of its Stargate AI infrastructure platform and that 200 MW is expected to go live in 2026. G42 says Stargate UAE will be built by G42 and operated by OpenAI and Oracle, with NVIDIA systems, Cisco networking, and SoftBank Group participation.
ADCI removes the selected 1,000 MW value from this reference record. The parent G42 UAE-US AI Campus record already carries the selected 5,000 MW Abu Dhabi capacity envelope, and the canonical OpenAI/G42 Stargate UAE child record already preserves the 1 GW child-cluster context without selecting it for rollups.
Structured analysis covering this facility's operator and market context.