Operator Profile

AMD

Track the global AI data center footprint controlled by AMD. AMD operates 3 tracked facilities across 2 countries with 254.29 MW of selected tracked capacity. 67% are currently operational.

Facilities

3

Tracked Capacity

254.29 MW

Countries

2

Statuses

2

Operational

2

Capacity Pipeline

254.29 MW of selected tracked capacity across 3 facilities.

Operational54.29 MW21%2
Under Construction200 MW79%1

Data Quality

100% cited
100% capacity published
100% geolocated
100% dated

Geographic footprint

3 facilities with published coordinates in this slice.

Operational Under construction

Peer Ranking

Where AMD stands among 226 tracked operators.

Compare side-by-side →
By facility count#20of 226
By selected capacity#98of 226 · 254.29 MW
Share of top market
2% of the #1 operator's capacity

Market Composition

How this slice breaks down

Status, geography, and energy profile across 3 facilities.

Status distribution

Operational267%
Under construction133%

Energy mix

Other / Unknown3100%

Operator Portfolio Brief

How this operator's infrastructure is positioned

A compact read on geographic concentration, live-versus-pipeline mix, and the largest disclosed site in this operator's portfolio.

Lead market
United States
2 tracked facilities
Buildout mix
2 live / 1 pipeline
67% operational
Geographic footprint
United States, Saudi Arabia
2 countries total
Largest disclosed site
Humain AI Data Centers (Saudi Arabia)
200 MW of selected tracked capacity

Frequently asked questions

How many AI data centers does AMD operate?
AMD has 3 tracked facilities in the AI Data Center Index, with a combined selected tracked capacity of 254.29 MW across 2 countries.
Where are AMD's AI data centers located?
AMD's facilities span 2 countries. See the geographic breakdown and facility table on this page for the full location list.

Facilities