AI data center dossier

Prologis / Atlas Project Sail Data Center (Coweta County)

Coweta County, Georgia, United States/datacenters/atlas-development-project-sail-georgia.html
PlannedUnknown900 MWAI & Cloud Infrastructure

Country

United States

Operator

Prologis, Atlas Development

Energy

Unknown

Tracked capacity

900 MW

Campus power envelope | Trade corroborated

900 MW is the reported Project Sail campus power scale for an approved but still planned Coweta County campus; IT load is not disclosed.

Evidence profile

Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.

Readiness

100%

Sources attachedVerified

4 citations linked

CoordinatesPublished

33.352, -84.799

Capacity scopeScoped

Campus power envelope | Trade corroborated

Timeline evidencePartial

2 dated fields available

Machine-readable outputsPublished

HTML, JSON, and GeoJSON all available

Record Notes

Project Sail is a Prologis / Atlas data-center proposal in Coweta County, Georgia, near Welcome to Sargent Road and Wagers Mill Road. The official project site says the current plan is nine buildings and 4.34 million square feet, with the building count reduced from 13 to nine, and says the site was selected for proximity to existing power infrastructure. The project site says Georgia Power has confirmed capacity to support the project without affecting existing homes or businesses.

Data Center Dynamics reports that the Coweta County Board of Commissioners approved the rezoning request in April 2026, greenlighting a 900 MW, 832-acre, nine-building campus. FOX 5 Atlanta likewise reports a narrow 3-2 approval, nine buildings, 4.34 million square feet, proximity to Georgia Power's Plant Yates, and the 900 MW power scale. ADCI keeps the selected 900 MW value but classifies it as a campus power envelope, not disclosed IT load. Guardian reporting documents an active citizen petition and environmental opposition, so the record should be monitored for referendum, litigation, or scope changes.

Analyst Flags

No obvious coverage gaps detected in the current structured record.

Timeline Signals

Announcement2026
Earliest market signal2026

Nearby Facilities

Other tracked AI data centers within 300 km of this location.

Related Facilities

Frequently asked questions

How big is Prologis / Atlas Project Sail Data Center (Coweta County)?
Prologis / Atlas Project Sail Data Center (Coweta County) has 900 MW of tracked capacity (Campus power envelope | Trade corroborated), located in Coweta County, Georgia, United States. It ranks #29 globally by selected capacity among 294 tracked records.
What is the status of Prologis / Atlas Project Sail Data Center (Coweta County)?
Prologis / Atlas Project Sail Data Center (Coweta County) is currently planned. Known timeline milestones: Announcement 2026, Earliest market signal 2026.
Who operates Prologis / Atlas Project Sail Data Center (Coweta County)?
Prologis / Atlas Project Sail Data Center (Coweta County) is operated by Prologis and Atlas Development. Structured intelligence reports are available for Prologis Operator Report and Atlas Development Operator Report and United States Country Report.
What energy source does Prologis / Atlas Project Sail Data Center (Coweta County) use?
Prologis / Atlas Project Sail Data Center (Coweta County) is powered by unknown energy and is focused on ai & cloud infrastructure workloads. This is backed by 4 cited sources.

Sources

  1. cowetaprojectsail.comcowetaprojectsail.com — coweta-lp
  2. datacenterdynamics.comdatacenterdynamics.com — en/news
  3. fox5atlanta.comfox5atlanta.com
  4. theguardian.comtheguardian.com — us-news/2026